HIGHLIGHTS:
•
•
•
The first drilling program at Vidalita successful in establishing that the geological
environment is typical of high sulphidation epithermal systems and that the
geochemistry has a local source;
The talus and rock sampling at Jotahues has defined an extensive geochemical target
in the northern concession;
The planning of the exploration program for this field season is well advanced.
Australian explorer, Emu NL (ASX: EMU), provides the following update in relation to its
activities during the June quarter of 2017, including at the Company’s Vidalita and Jotahues gold
projects in northern Chile.
As detailed in the ASX release dated 16th May 2017, the results of the three diamond drill holes
were received. Since that release the Company has collated all the information on the Vidalita and
Jotahues projects. Conclusions drawn from this first exporation program are:
For Vidalita:
1. The alteration is indicative of a large mineralised system;
2. The age of the hydrothermal alteration (based on alunite 21My +/-) is in the right time
window for gold mineralisation in the Maricunga belt;
3. Surface rocks provide direct evidence of mineralisation;
4. The surface and diamond core geochemistry is characteristic of high sulphidation epithermal
(HSE) systems;
5. The rocks intersected in the drilling program are typical of those found in HSE systems;
6. The cause of the geophysics (resistivity low) target coincident with surface indications of
mineralisation may be a large alteration system lying beneath a cap (another characteristic of
HSE systems);
7. The drilling established that the source of the surface geochemsitry is local;
8. The distribution of the gold and silver in the drill holes shows direct correlations with
known deposits in the Maricunga belt (eg. Salares Norte);
9. Based on existing ore deposit models, the geology intersected by the drilling is interpreted to
be within the upper or peripheral parts of the style of deposit being sought (namely, HSE
system);
10. Significant additional drilling to explore the property is warranted with Emu’s primary
target being high grade feeders zones typically found within very large tonnage lower
overall grade deposits in HSE systems.
For Jotahues:
1. The talus sampling is defining a large area of anomalous geochemistry along the valley in
the northern concession (figures 1 (a) & (b); refer March 2017 Quarterly Report for the
relevant JORC Table);
2. Mapping has located several areas of outcropping sulphide (pyrite) mineralisation;
3. Further surface work is warranted to define a drill target.
10 Walker Avenue, West Perth, WA 6005
PO Box 1112, West Perth, WA 6872
T +61 8 9226 4266, E info@emunl.com.au, www.emunl.com.au
ABN 50 127 291 927
The Company has initiated plans for this field season consisting of:
1. Completion of the first round of surface sampling at Vidalita;
2. Further drilling at Vidalita using a different method considered to be better suited to the
conditions and expected to deliver significantly more metres at a much lower cost;
3. Continuation of the sampling at Jotahues and, if a drilling target can be tied down, limited
drilling.
NEW PROJECTS
Consistent with previous statements by the Company, Emu did and continues to look for new
mineral exploration, development and mining opportunities within Australia and at various overseas
jurisdictions.
CONTROLLED PLACEMENT AGREEMENT
The Company has entered into a Controlled Placement Agreement (CPA) with Acuity Capital
under which EMU might (if, when and at a price or prices in one or more tranches) at its sole
discretion raise up to $2 million prior to 31 December 2019.
There is no requirements for EMU to utilise the CPA which it may terminate at any time, without
cost or penalty. The CPA does not contractually restrict EMU’s ability to otherwise raise capital.
Each time EMU elects (if at all) to utilise the CPA, it will (in its sole discretion) set a floor price.
The final issue price will be the greater of the floor price and a discount of 10% to the volume
weighted average on market sale price realised by Acuity over a period nominated by EMU.
ASX WAIVER – APPROVAL TO ISSUE SHARES
On 8 February 2017, the Company received shareholder approvals for the issue of up to 15 million
shares (Consideration Shares; 2,500,000 of which were issued shortly after the approvals) in
respect of the Option Agreement (for the option to purchase the Vidalita and Jotahues projects –
Projects) with Prospex SpA and BLC SpA.
The following information is provided in accordance with a waiver granted by ASX permitting the
Company to issue the balance of the Consideration Shares (12,500,000) more than 3 months after
the date of the approvals:
a) No Consideration Shares were issued during the reporting period;
b) 12,500,000 of the Consideration Shares remain, conditionally, to be issued; and
c) the conditions to and instalments in which the remainder of the Consideration Shares may be
issued are:
i)
2,500,000 (approved for issue no later than 31 March 2019) if the Company elects to
continue exploring the Projects and subject to it meeting its expenditure commitment in
relation to the Projects (minimum of US$1 million by 10 December 2018) and;
ii) 5,000,000 (approved for issue no later than 31 December 2020) if the Company exercises
the option and defines a 500,000 ounce measured resource of gold on the Projects; and
iii) 5,000,000 (approved for issue no later than 31 December 2020) if the Company exercises
the option and defines a 1,000,000 ounce measured resource of gold on the Projects.
For more information on the Company see the website www.emunl.com.au
Page 2
Figure 1(a)
Page 3
Figure 1(b)
Page 4
ABOUT THE CHILE GOLD PROJECTS
The Vidalita and Jotahues gold projects are located in the highly mineralised Oligocene/Miocene
Maricunga gold belt in northern Chile, approximately 200 km east from the city of Copiapó in the
Atacama Region of Chile. The two projects cover an area of approximately 2,800 hectares of
mineral exploration concessions and host alteration and mineralization that appear geologically
similar to other high sulphidation gold deposits of the Maricunga gold belt. The projects are
accessed using a network of roads that link Copiapó with the Refugio project (Kinross), Cerro
Casale project (Barrick/Kinross) and the Caspiche project (Goldcorp). Refugio is located 30 km to
the northwest of Vidalita. Apart from the recent very limited drilling by Emu, due enquiry
having been made, the Company is unaware of the project having been drilled.
Emu has an option (Emu’s Option Agreement) with Prospex SpA and BLC SpA, Chilean
subsidiaries of Altius Minerals Corporation of Canada, to acquire 8 concessions at Vidalita and 3
concessions at Jotahues. The option under Emu’s Option Agreement may be exercised any time up
until 11th November 2019 by granting Prospex and BLC a 1% NSR on production and, subject to
Emu expending US$1 million in pursuing its rights under the Emu Option Agreement by 10th
December 2018 and electing to continue with the project, allotting them 2.5 million Emu ordinary
shares. In addition, if the option is exercised and subject to certain measured mineral resource
hurdles being met (see ASX release 15th November 2016), up to a further 10 million shares will be
issued. Prospex SpA in turn has an option under an agreement (the Prospex’s Option Agreement)
to acquire 6 of the 8 Vidalita concessions from local Chilean parties. Under the terms of that
agreement, Prospex has the right to exercise that option by 11th November 2019 by paying US$2
million and granting the Chilean parties a 1% NSR over those 6 concessions. Under Emu’s Option
Agreement, Emu has assumed the rights and obligations of Prospex under Prospex’s Option
Agreement.
Page 5
Page 6
CONCESSIONS
Concession holder
SOCIEDAD LEGAL MINERA VIDALITA A
DEL RÍO VIDAL GORMAZ
SOCIEDAD LEGAL MINERA VIDALITA B
DEL RÍO VIDAL GORMAZ
SOCIEDAD LEGAL MINERA VIDALITA C
DEL RÍO VIDAL GORMAZ
SOCIEDAD LEGAL MINERA VIDALITA D
DEL RÍO VIDAL GORMAZ
SOCIEDAD LEGAL MINERA VIDALITA E
DEL RÍO VIDAL GORMAZ
SOCIEDAD LEGAL MINERA VIDALITA F
DEL RÍO VIDAL GORMAZ
BLC SpA
BLC SpA
BLC SpA(Jotahues)
BLC SpA (Jotahues)
BLC SpA (Jotahues)
Name & Number
Vidalita A1
Interest
Option to acquire 100%
Vidalita C1
Option to acquire 100%
Vidalita E1
Option to acquire 100%
Vidalota A
Vidalota B
Ciclope Tuerto 7
Option to acquire 100%
Option to acquire 100%
Option to acquire 100%
Ciclope Tuerto 9
Option to acquire 100%
Vidalita B1
Option to acquire 100%
Vidalita D1
Option to acquire 100%
Vidalita F1
Option to acquire 100%
Ciclope Tuerto 8
Option to acquire 100%
Page 7
Emu NL
ABN 50 127 291 927
ASX Code: EMU
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Issued Capital:
Quoted:
Shares
65,910,387 fully paid shares
Contributing Shares
36,580,667 paid to $0.03; $0.03
to pay, no call before
31/12/2018
Unlisted Options
3,750,000 options, exercise
price $0.10, date 20/12/18
300,000 options, exercise price
$0.25, date 20/12/18
Directors:
Peter Thomas
Chairman
Greg Steemson
Managing Director
Gavin Rutherford NonExecutive Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration
results, mineral resources and mineral reserves are based upon
information compiled by Mr. Greg Steemson, Managing
Director of Emu NL. Mr. Steemson is a Fellow of the
Australasian Institute of Mining and Metallurgy (FAusIMM)
and has sufficient experience in the activity which he is
undertaking to qualify as a Competent Person as defined in
the 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”
(JORC Code). Mr. Steemson consents to the inclusion in the
report of the matters based upon his information in the form
and context in which it appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning
the projects owned by Emu NL. Statements concerning
mining reserves, resources and exploration results may also
be deemed to be forward looking statements in that they
involve estimates based on specific assumptions. Forwardlooking statements are not statements of historical fact and
actual events and results may differ materially from those
described in the forward looking statements as a result of a
variety of risks, uncertainties and other factors. Forward
looking statements are based on management’s beliefs,
opinions and estimates as of the dates the forward looking
statements are made and no obligation is assumed to update
forward looking statements if these beliefs, opinions and
estimates should change or to reflect other future
developments.
Page 8
Share your feedback
Discover