Signficant REE Values, Project Footprint Extended Condingup
Released
Released
Announcement PDF
Significant REE Values, Project Footprint
Extended - Condingup, Esperance WA
4 May 2023
EMU NL (ASX: EMU) (“EMU” or “the Company”) is pleased to announce results of its highly
successful Stage 2 Rock Chip Reconnaissance Survey and the making of applications to extend
the Project footprint at its 100% owned Condingup REE Project within the Esperance REE
Province of Western Australia.
HIGHLIGHTS
EMU’s Stage 2 Rock Chip Reconnaissance Survey has confirmed and extended the
Rare Earth Element (REE) mineralisation footprint with highly anomalous REE
values recorded from outcropping Booanya suite granites.
Rock Chip assays results have confirmed the extensive surface TREO (Total Rare
Earth Oxides) REE mineralisation with assay results including 941 ppm TREO, 1,089
ppm TREO, 1,205 ppm TREO and 1,242 ppm TREO.
High value Magnet Rare Earth Oxides (MREO) represent an average of ~22% of
TREO grade from 28 rock chip samples.
Rock Chip Assay results confirm EMU’s Booanya suite granites to be highly fertile
for rare earth elements with the potential to host significantly enriched rare-earth
minerals in clay.
EMU has applied for an additional 765 square km of highly prospective Exploration
Licence ground, taking the overall exploration package at the Condingup REE
Project to 1,560 square km of Exploration Licence area – further increasing its
major strategic footprint in the Esperance REE Province.
On a regional scale, the western, central and eastern granitic zones remain
untested with numerous, extensive strong exploration targets varying from 14.1km
to 18.3km in strike length.
EMU is currently planning a maiden aircore drilling programme to ascertain
mineralisation in target clay REE enriched horizons.
ABN 50 127 291 927 | 10 Walker Avenue, West Perth, WA, 6005 | PO Box 1112, West
Perth, WA, 6872 E: info@emunl.com.au | www.emunl.com.au | ASX Code: EMU
Following the highly successful December 2022 Stage 1 Rock Chip Reconnaissance Survey
and surface clay sampling programme 1, which reported significant 25% MREO as
percentage to TREO and 12.7% HREO 2 as percentage to TREO assay results, the Company
undertook a more extensive surface rock chip sampling programme targeting Booanya
style granite outcropping.
Assay results from the Stage 2 Rock Chip Reconnaissance Survey iden fied highly anomalous REE
zones, clearly demonstra ng strong underlying host rock fer lity over the Condingup REE Project.
Based on these very early-stage explora on results, the Project has all the hallmarks to poten ally
host significant economic, clay hosted REE mineralisa on.
Results from this sampling programme encouraged EMU to immediately make applica ons for
an addi onal 765 square kms of explora on licence ground substan ally adding to the overall
project footprint over the Booanya style granites, associated drainage profiles and adjacent
weathered clay zones.
As part of EMU’s assessment of the intrusive Booanya suite granites, the regional magne c survey
has outlined a direct correla on between strong magne c vectors and highly elevated REE assays,
delivering a number of walk-up explora on targets. These targets are very extensive in area and
provide substan al opportuni es for drill tes ng.
Peter Thomas, EMU’s Chairman, comments
“These are stunning results from the rock chip sampling programmes and are extremely
encouraging. The results shine a bright light on EMU’s Condingup REE Project and iden fy it as
being a “dead ringer” to OD6’s Splinter Rocks project. The intrusive Booanya granite suite has
proven to be a significant indicator of REE fer lity in the eastern Esperance REE Province.
Following successful high value TREO results and the strong possibility of higher enrichment in the
surrounding clays, EMU immediately made strategic applica ons for an addi onal explora on
tenement area, bringing the 100% owned Condingup Project area to an aggregate 1,560 square
kilometres thus advancing EMU’s status as a significant REE player in the Province.
The impending maiden aircore drilling programme is envisaged to report higher concentra ons
of REE hosted in clay zones adjacent to, and overlaying, the weathered granite suite”.
Stage 2 Rock Chip Reconnaissance Survey
A total of 28 rocks were collected during March and assayed in April 2023. The primary focus
of the reconnaissance sampling was to collect clay samples from road cu ngs and surfaces
from various farms in the region. The mul -element assays of the granite rock samples
indicate that the anomalous REEs are hosted within frac onated, metasoma zed, alkaline
Booanya suite granites. Globally, frac onated alkaline systems are known to be associated
with significant REE deposits.
1
ASX Announcement 14 March 2023: “Assays Confirm Magnetic and Heavy Rare Earth Fertility”
Heavy Rare-Earth Element Oxides as defined by the USGS “Rare-Earth Elements Professional Paper 1802–O ”
publication 2017, page 2
2
Page | 2
Figure 1 Condingup REE Project highligh ng extensive regional land holding and broad
REE mineralisa on determined from a number of high value TREO’s sampled from
Booanya granite outcropping.
Page | 3
Conceptual Mineralisa on Model
Given the significant exploration success of near neighbour, OD6 Metals at Splinter Rocks,
and the results from EMU’s Rock Chip Reconnaissance Surveys, EMU expects to identify REE
supergene concentrations in clay zone traps through upcoming drilling and exploration
vectoring.
Due to geological weathering processes, any clay traps intersected in drilling will likely contain
greater concentra ons of TREO than the numbers reported in the Booanya granite rock
samples detailed in this release highligh ng the “fer lity” significance of the rock sample
results reported herein.
EMU's Condingup REE Project is represented by the discovery of clay hosted rare-earths in an
exploration location which has been previously overlooked by past explorers whose primary
focus was exploration for industrial minerals. EMU has identified the project through the
compilation, review, and processing of publicly available data, combined with the application
of geological first principles which includes the collection and assaying of more than 58
regional surface rock and 39 surface clay samples.
Figure 2 A conceptual cross sec on of the Booanya suite granites at Condingup showing
outcrops dam loca ons and prospec ve enriched clay layers.
Follow Up Work Programme
EMU has commenced planning its maiden aircore drill programme at Condingup which will
test deeper clay zone targets iden fied from reprocessed aero magne c survey data. The
drilling programme target areas will focus on interpreted deeper “clay traps” which EMU
hypothesises host high grade REE deposi ons. Drilling will be scheduled following the
finalisa on of necessary administra ve access protocols. Further to drilling programmes, EMU
is reviewing the possibility of a geophysical Airborne Electromagne c Survey (AEM), a
methodology that has shown significant promise at other clay hosted projects in the area, to
iden fy clay depths over basement rock. An AEM survey has the poten al to unlock
mineralised zones and provide defini ve vectors for drill targets.
Page | 4
About the Condingup Rare Earth Project
The 100% owned Condingup Rare Earth Project is located just 35kms southeast of ASX:OD6’s
Splinter Rock Project which is achieving success in a similar geological se ng within the REE
enriched Booanya suite granites. EMU’s Condingup Project is situated just 60kms from the port
of Esperance and other essen al infrastructure all accessible by sealed roads. Esperance is
projected to become a central hub for major renewable energy and green hydrogen produc on
and is located within a well-regarded explora on/mining support jurisdic on.
EMU has applica ons and granted tenements over a package of highly prospec ve explora on
tenements east of Esperance in Western Australia. The 1,560 square kilometre Condingup
Rare Earth Project overlies saprolite, clay enriched rare earth soils, and covers the geologically
significant Booanya granite suite. The project tenements are located directly over what EMU
considers to be the last remaining vacant Booanya granite tenements in the region extending
from Condingup to Balladonia, east of Esperance.
RELEASE AUTHORISED BY THE BOARD
For further informa on, please contact:
Doug Grewar
Chief Execu ve Officer
Emu NL
info@emunl.com.au
Page | 5
Table 1. Significant Rock Sample Results > 450 TREO (PPM & %)
Site_ID
Medium
Easting
Northing
TREO MREO % HREO % CREO %
CeO2
Dy2O3
Er2O3
Eu2O3 Gd2O3 Ho2O3
La2O3
Lu2O3 Nd2O3 Pr6O11 Sm2O3 Tb4O7 Tm2O3
Y2O3
Yb2O3
ESS01794
ESS01780
ESS01795
ESS01802
ESS01813
ESS01811
ESS01791
ESS01803
ESS01774
ESS01808
ESS01781
ESS01798
ESS01773
ESS01779
ESS01783
ESS01771
ESS01792
ESS01799
ESS01812
ESS01772
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
465113
493384
459453
495029
466558
478278
488337
490842
516370
444778
495844
478398
518991
488492
501803
512977
467032
490193
483439
522891
6259327
6265611
6257654
6282783
6269998
6254980
6269295
6280610
6258593
6261158
6263859
6269476
6268795
6266253
6263974
6276609
6255851
6277981
6263090
6269292
1242
1206
1090
942
934
896
889
876
832
666
655
637
611
568
561
544
535
533
486
459
510.69
441.58
466.18
373.64
398.24
413.47
384.19
357.25
329.14
256.51
299.85
288.14
221.38
248.32
245.97
247.14
255.34
213.18
226.06
165.15
16.87
25.25
12.74
14.00
11.10
9.56
4.66
14.12
13.08
12.62
5.51
4.36
13.77
4.03
5.91
4.56
3.42
8.17
3.27
10.93
8.86
14.41
6.88
7.91
6.17
4.24
1.93
7.50
6.85
6.22
2.81
1.80
8.50
1.64
2.82
1.90
1.62
4.59
1.51
6.42
4.50
2.05
3.53
3.54
2.86
3.98
2.12
2.37
4.03
2.43
1.59
2.94
0.98
1.37
1.26
1.47
1.18
2.05
1.47
1.66
3.10
4.99
2.44
2.71
2.11
1.62
0.78
2.76
2.41
2.35
0.99
0.73
2.68
0.63
1.04
0.76
0.60
1.59
0.58
2.18
233.39
258.02
253.32
212.28
200.55
189.99
247.46
181.78
172.40
130.18
155.98
155.98
114.23
147.77
129.01
126.66
129.01
113.29
110.48
86.44
1.10
1.44
0.94
1.07
0.67
0.51
0.23
0.65
0.86
0.65
0.33
0.16
1.16
0.19
0.39
0.23
0.22
0.59
0.15
0.85
91.94
160.01
71.37
79.11
66.54
40.00
22.35
87.24
73.65
67.05
29.97
21.08
97.27
18.29
32.51
20.95
16.25
48.89
17.65
68.57
7.44
11.06
6.10
6.96
5.41
3.75
1.47
5.02
5.83
4.74
2.32
1.15
7.97
1.34
2.46
1.49
1.33
4.09
1.06
5.74
25.8
21.2
21.7
22.6
22.9
22.4
22.4
22.0
23.7
24.0
21.3
22.5
20.3
22.3
21.9
22.5
21.1
22.4
22.7
21.1
12.7
20.7
11.2
14.2
11.8
8.6
4.9
15.7
14.8
16.9
7.9
6.1
24.6
6.3
10.0
7.2
5.7
15.2
6.5
23.9
28.3
30.3
23.8
26.6
25.4
22.4
20.0
27.6
28.2
29.7
21.3
21.2
32.4
20.8
23.1
21.6
19.4
27.3
21.5
32.5
23.63
26.05
17.52
17.75
14.87
14.75
10.37
16.60
16.71
15.68
8.16
8.24
14.87
8.09
9.20
7.93
5.92
10.35
6.12
11.87
234.45
173.79
169.13
150.47
153.96
144.63
146.97
135.30
141.13
113.26
100.78
105.56
83.51
93.31
88.76
89.23
82.00
84.33
81.06
65.67
66.00
51.84
51.26
45.17
46.46
44.35
46.11
40.49
39.91
31.60
31.60
32.30
24.34
28.32
26.57
27.50
26.45
25.28
25.04
18.26
35.95
29.34
24.93
23.42
22.50
22.73
18.90
21.57
22.50
19.71
13.34
13.57
16.47
13.80
13.68
12.99
10.42
14.15
10.78
12.18
3.28
4.10
2.50
2.59
2.08
2.00
1.15
2.54
2.38
2.38
1.09
0.98
2.35
0.93
1.21
0.97
0.74
1.59
0.73
1.83
1.23
2.02
0.99
1.14
0.95
0.61
0.25
0.95
0.97
0.81
0.39
0.21
1.26
0.22
0.41
0.25
0.23
0.65
0.17
0.95
Table 2. Other Rock Sample Results <450 TREO (PPM & %)
Site_ID
Medium
Easting
Northing
TREO MREO % HREO % CREO %
CeO2
Dy2O3
Er2O3
Eu2O3 Gd2O3 Ho2O3
La2O3
Lu2O3 Nd2O3 Pr6O11 Sm2O3 Tb4O7 Tm2O3
Y2O3
Yb2O3
ESS01804
ESS01782
ESS01788
ESS01784
ESS01787
ESS01790
ESS01770
ESS01805
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
487504
502357
491634
503665
497774
486812
516302
484636
6283981
6264874
6269715
6264905
6270953
6268295
6275538
6282115
436
421
416
377
335
296
196
129
201.46
141.73
196.78
124.16
139.38
128.84
85.86
55.05
5.14
12.05
2.97
10.29
4.96
1.56
6.59
1.80
3.01
7.39
1.27
6.91
2.70
0.88
5.57
1.04
1.31
1.69
1.07
0.94
1.37
0.75
0.43
0.60
94.76
69.78
105.32
67.20
74.36
89.84
13.96
28.26
0.48
0.98
0.18
0.92
0.30
0.13
0.93
0.16
32.76
77.97
13.59
77.08
26.29
9.99
46.99
10.50
2.92
6.67
1.12
6.42
2.19
0.80
6.39
0.93
19.0
20.9
19.7
19.3
21.7
19.2
13.5
20.6
12.2
29.1
6.4
30.6
13.5
5.7
37.6
13.7
22.6
36.1
18.7
36.3
25.4
18.1
35.5
24.7
6.43
11.53
5.82
9.00
6.41
2.54
3.93
2.33
1.02
2.45
0.48
2.19
0.95
0.30
1.55
0.37
58.09
58.09
59.25
47.01
51.20
40.82
14.70
18.55
18.49
15.68
18.96
13.69
15.45
14.04
4.30
5.76
8.69
11.60
8.38
9.00
7.99
4.66
3.44
3.18
0.96
1.92
0.67
1.57
0.94
0.31
0.86
0.36
0.43
1.07
0.17
1.07
0.35
0.13
0.95
0.14
Page | 6
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
1,450,021,079 (including 18.6m the
subject of the ATM which EMU can buy
back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay,
no call before 31 December 2023
Contributing Shares (Unlisted)
35,000,000 paid to $0.0001, $0.04 to
pay, no call before 31 December 2025
Options (unlisted)
172,453,621 options to acquire fully paid
shares, exercisable at $0.01 each, on or
before 7 October 2024
Performance Rights (Unlisted)
48,571,429 performance rights in
relation to acquisition of Gnows Nest
project
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
M +61 419833604
E info@emunl.com.au
COMPETENT PERSON’S STATEMENT
The informa on in this report that relates to
explora on results is based on, and fairly represents
informa on and suppor ng documenta on prepared
by Kur s Dunstone, a Competent Person who is a
Member of the Australian Ins tute of Geoscien sts.
Mr Dunstone is an employee of EMU NL and has
sufficient experience in the ac vity which he is
undertaking to qualify as a Competent Person as
defined in the 2012 edi on of the “Australasian Code
for Repor ng of Explora on Results, Mineral
Resources and Ore Reserves”. Mr Dunstone consents
to the inclusion herein of the ma ers based upon his
informa on in the form and context in which it
appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertain es and
other factors, actual events and results may differ
materially from any forward looking and other
statements herein not purpor ng to be of historical
fact. Any statements concerning mining reserves,
resources and explora on results are forward looking
in that they involve es mates based on assump ons.
Forward looking statements are based on
management’s beliefs, opinions and es mates as of
the respec ve dates they are made. The Company
does not assume any obliga on to update forward
looking statements even where beliefs, opinions and
es mates change or should do so given changed
circumstances and developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new
informa on or data that materially affects the
informa on included in the original market
announcements and, in the case of es mates of
Mineral Resources, which all material assump ons
and technical parameters underpinning the es mates
in the relevant market announcement con nue to
apply and have not materially changed. The Company
confirms that the form and context in which the
Competent Person’s findings are presented have not
materially changed from the original market
announcement.
Page | 7
JORC Code 2012 Edi on Table 1:
Sec on 1- Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
A 1-2kg surface rock sample was
collected for assay.
Sampling was carried out under Company
protocols and QAQC procedures as per
current industry practice. See further
details below.
Samples were dispatched to LabWest in
Perth. Sample preparation by the
laboratory included sample sorting, oven
drying, mechanical pulverisation to 95%
passing 75 microns. Analytical method
MMA-04.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g
charge for fire assay’). In other cases,
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit
or other type, whether core is oriented
and if so, by what method, etc).
No drilling was undertaken.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Not applicable.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
Whether core and chip samples have
Geological logging was done on a visual
Page | 8
Criteria
JORC Code explanation
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Commentary
basis, including; colour, grain size,
lithology type, weathering, and
mineralogy.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
The samples were dried and pulverised to
95% passing -75 microns before analysis.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
QA/QC certified reference samples and
field duplicates were routinely inserted at
a rate of 1 in 20 with every batch
submitted for assay.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
The sample size is appropriate for the
mineralization style, application and
analytical techniques used.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Microwave mixed-acid method MMA-04,
62 element determination including rareearths using a combination of ICP-MS and
ICP-OES finish.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Detection limits are appropriate for the
included results.
All elements were reported in PPM (Parts
Per Million).
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
Verification
of sampling
and
assaying
The verification of significant
intersections by either independent or
alternative company personnel.
Assays are as reported from the
laboratory and stored in the company
database, managed by an independent
database consultant.
Page | 9
Criteria
JORC Code explanation
Commentary
The use of twinned holes.
Field data was collected on site using
both field sample books and a company
Toughbook (laptop computer) and
entered into a set of standard logging
templates.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Relevant individual rare-earth element
results were converted to stoichiometric
oxide using industry standard
stoichiometric conversion factors:
Element Oxide Conversion
PPM
Form
Factor
Ce
CeO2
1.2284
Dy
Dy2O3
1.1477
Er
Er2O3
1.1435
Eu
Eu2O3
1.1579
Gd
Gd2O3
1.1526
Ho
Ho2O3
1.1455
La
La2O3
1.1728
Lu
Lu2O3
1.1371
Nd
Nd2O3
1.1664
Pr
Pr6O11
1.2082
Sm
Sm2O3
1.1596
Tb
Tb4O7
1.1762
Tm
Tm2O3
1.1421
Y
Y2O3
1.2699
Yb
Yb2O3
1.1387
Rare-Earth Oxide results were calculated
using:
TREO (Total Rare Earth Oxide) = CeO2 +
Dy2O3 + Er2O3 + Eu2O3 + Gd2O3 +
Ho2O3 + La2O3 + Lu2O3 + Nd2O3 +
Pr6O11 + Sm2O3 + Tb4O7 + Tm2O3 +
Y2O3 + Yb2O3
Mag REO (Magnet Rare Earth Oxide) =
Dy2O3 + Pr6O11 + Nd2O3 + Tb4O7 +
Gd2O3 + Ho2O3 + Sm2O3
HREO (Heavy Rare Earth Oxide) = Dy2O3 +
Er2O3 + Eu2O3 + Gd2O3 + Ho2O3 +
Lu2O3 + Tb4O7 + Tm2O3 + Y2O3 + Yb2O3
CREO (Critical Rare Earth Oxide) = Dy2O3 +
Eu2O3 + Nd2O3 + Tb4O7 + Y2O3
Percent MREO (Magnetic) = MREO / TREO
Percent HREO (Heavy) = HREO / TREO
Percent CREO (Critical) = CREO / TREO
Page | 10
Criteria
JORC Code explanation
Commentary
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Rock samples were located using a
handheld GPS system with an accuracy of
+/- 5m and stored in the company
database.
Specification of the grid system used.
All coordinates are referenced to MGA
Zone 51, Datum GDA94.
Quality and adequacy of topographic
control.
Page | 11
Share your feedback
Discover