Petrology confirms Primary Nickel Sulphides at Sunfire Proje
Released
Released
Announcement PDF
EMU NL
Petrology confirms Primary Nickel Sulphides at Sunfire Project, near
Bridgetown WA
2 March 2022
EMU Directors Statement
“The Board is excited to announce the unearthing of historical information relating to its
“Sunfire” nickel-copper-PGE project near Bridgetown in the southwest of WA. EMU’s
exploration team delved into circa 50-year-old exploration records made available via
WAMEX1. In the 1970s, Planet Mining was a company that completed several diamond drill
holes at Sunfire. Clearly, exploration back then was not equipped with the technology we
currently enjoy and utilise to pinpoint and quantify potential nickel sulphide orebodies.
A half century later, grades then passed over by nickel explorers as non-economic, are subject
to re-evaluation based on today’s higher nickel prices, changed mining practices and
processing techniques, and the burgeoning global demand profile as battery materials demand
increases. The historical information, sourced from WAMEX, incudes drill core results
confirming the presence of disseminated primary magmatic nickel sulphides. It can therefore
be no surprise that this news has boosted EMU’s enthusiasm for the prospectivity of Sunfire.”
Highlights
Petrology reports indicate the presence of primary magmatic disseminated nickel
sulphide mineralisation at Emu’s Sunfire project
Disseminated nickel sulphide mineralisation indicated from 2 diamond holes
completed more than 50 years ago reported in historic WAMEX reports
Disseminated nickel sulphides from relatively shallow depths of 65 – 140m within
ultramafic host rocks
New knowledge to drive aggressive exploration programme during second half 2022
EMU to employ soil sampling and modern geophysical exploration techniques in the
first instance to generate new vectors for drilling programme
1 Mineral explorers are required to report annually on their exploration projects under Western Australian legislation. After a period of
confidentiality, the exploration reports and data are made available to the public. These are referred to as open-file reports. Mineral
exploration open-file (public) reports are stored in the Western Australian Mineral WAMEX database. Access is free of charge, and copies of
the reports are available for download.
EMU NL
10 Walker Avenue, West Perth, WA, 6005
T: +61 (08) 9226 4266
info@emunl.com.au
ABN 50 127 291 927
PO Box 112, West Perth, WA, 6872
ASX Code: EMU
www.emunl.com.au
Emu NL (EMU or the Company, ASX:EMU) is pleased to provide an update on its exploration
progress at the Sunfire Nickel-Copper-PGE Project near Bridgetown, Western Australia.
An assessment of petrology studies outlined in 2 WAMEX reports2, prepared by Planet Mining
Company Pty Ltd in 1970, highlights the identification of fine grained disseminated pentlandite
and millerite nickel sulphides in diamond drill holes Y001 and Y003 (see Figure 1). The
information contained in the reports, provides evidence of the prospectivity at depth and along
the structures of the layered ultramafic sequence of the Seaton-Ross trend. Further, it gives
EMU confidence to explore at depth for primary magmatic and structurally remobilised nickel
sulphide targets, as well as for shallower laterite nickel, cobalt, chrome deposits.
Until now, exploration at Sunfire has largely been focused on a 1500m zone of the Seaton-Ross
magnetic trend within State Forest. A further 5.5 km strike extension of this trend remains
untested. Similarly, a 7.5km length of strike in 2 parallel belts, one to the north (Yornup Trend),
and the other to the south (Mersea Trend), requires systematic exploration. (see Figure 2).
Recent exploration focus has been directed towards the presence of nickel and chromite within
laterites and near-surface positions. The results from historic surface geochemistry and shallow
drilling at Sunfire have identified significant zones of nickel and copper anomalism3. But now,
Emu intends to extend its exploration effort to look for deeper primary nickel and copper
sulphides located under widespread, shallow Tertiary laterite cover which masks layered maficultramafic intrusions.
EMU has planned a detailed soil geochemical survey to extend the footprint of known surface
geochemical anomalism. It has also scheduled a programme of fixed loop electromagnetic
(FLEM) surveys over the anomalous zones to identify any bedrock conductors for follow-up drill
testing. The FLEM survey is scheduled in mid-2022 following finalisation of the formal
administrative processes pursuant to the acquisition of the project tenements.
About the Sunfire Project, Bridgetown WA
The Sunfire Project adjoins the Chalice Mining/Venture Minerals’ Southwest Project (Chalice
earning-in), and is highly prospective for nickel, copper and PGE’s. EMU has identified 3
prominent magnetic anomalies representing mafic-ultramafic intrusions along northeasttrending belts, paralleling the JV’s Thor discovery.
Venture Minerals recently announced that Chalice Mining had interpreted a “Julimar lookalike”
immediately to the northwest of Sunfire along parallel structures with 13 conductors outlined
from an airborne geophysical survey. Chalice Mining further determined that these conductors
yielded wide and significant palladium intervals similar to those found in early drilling phases
of the Julimar nickel-copper-PGE discovery4.
2 WAMEX reports A6413 and A6414
3ASX News Release “Emu Secures Highly Prospective Portfolio in WA”; 20 September 2020
4 ASX Announcement by VMS dated 6 December 2021 “Chalice Mining Completes 1st Stage JV on Julimar Lookalike Target”
Page 2 of 5
Fig 1 – Location of historical drill holes at Yornup Mill
Note 1: See location of Y001 & Y003 with primary Nickel Sulphide Petrology
Note 2: See ultramafic trends highlighted by aeromagnetic outlines
Page 3 of 5
Fig 2 – Sunfire Project Location and Extensions of Mafic-Ultramafic Belts
RELEASE AUTHORISED BY THE BOARD
Contact Details: Doug Grewar - Mobile: 0419 833 604
Page 4 of 5
COMPETENT PERSON’S STATEMENT
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
549,814,484 (including 18.6m which
EMU can buy back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay,
no call before 31/12/2023
Options (unlisted)
33,320,000 options to acquire fully [paid
shares, exercisable at $0.075 each, expiry
15/3/2023
35,000,000 options to acquire partly paid
shares, exercisable at $0.0001 each,
expiry 15/11/2022
Performance Rights (Unlisted)
48,571,429 performance rights in
relation to acquisition of Gnows Nest
project
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
M +61 419833604
E info@emunl.com.au
The information in this report that relates to exploration
results is based on, and fairly represents information
and supporting documentation prepared by Kurtis
Dunstone, a Competent Person who is a Member of the
Australian Institute of Geoscientists. Mr Dunstone is an
employee of Emu NL and has sufficient experience in
the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr Dunstone
consents to the inclusion herein of the matters based
upon his information in the form and context in which
it appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertainties and other
factors, actual events and results may differ materially
from any forward looking and other statements herein
not purporting to be of historical fact. Any statements
concerning mining reserves, resources and exploration
results are forward looking in that they involve
estimates based on assumptions. Forward looking
statements are based on management’s beliefs,
opinions and estimates as of the respective dates they
are made. The Company does not assume any
obligation to update forward looking statements even
where beliefs, opinions and estimates change or should
do so given changed circumstances and developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new
information or data that materially affects the
information included in the original market
announcements and, in the case of estimates of Mineral
Resources, which all material assumptions and technical
parameters underpinning the estimates in the relevant
market announcement continue to apply and have not
materially changed. The Company confirms that the
form and context in which the Competent Person’s
findings are presented have not materially changed
from the original market announcement.
- END -
EMU NL
10 Walker Avenue, West Perth, WA, 6005
T: +61 (08) 9226 4266
info@emunl.com.au
ABN 50 127 291 927
PO Box 112, West Perth, WA, 6872
ASX Code: EMU
www.emunl.com.au
Share your feedback
Discover