The Yataga Copper Project, Queensland – strategic focus for EMU NL
Review of corporate strategy by the new EMU board
Emu NL (ASX: EMU, the Company) is pleased to advise that the recently formed Board, consisting of
Adrian Griffin (Executive Chairman), John Anderson (Non-executive Director) and Ian Davies (Non-
executive Director) has completed an initial review of the Company’s strategy and its key corporate
arrangements, and provides the following update to the market.
Prior to the Board changes, proposed contracts required to implement the maiden drilling
programme at the Yataga Copper Project were placed on hold pending the anticipated review by the
new board. That review has been completed, and all contracts have now been entered into by the
Company to commence the maiden drilling program. The Company affirms that Yataga is its core
strategic focus and that the maiden drilling program is of highest priority.
The Project
The Yataga Copper Project is located in
the Georgetown Mining District of Far
North Queensland (Figure 1).
Targets within the Yataga Copper
Project are geochemically and
geophysically defined with outcropping
copper mineralisation observed in some
areas, particularly Fiery Creek (Figure 2)
(ASX announcement 26 September
2025).
The host to the mineralisation is the
Yataga Igneous Complex which has
strong geological affinities with some of
the world’s porphyry related copper
deposits (ASX announcement 11 March
2025). The Yataga Igneous Complex has
a footprint of approximately 70 km2
Figure 1 Location of the Yataga Copper Project
Figure 1 Location of the Yataga Copper
Project
Page 2
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
which includes extensive copper mineralisation and is part of the Georgetown JV in which EMU holds
83% and Rugby Mining Pty Ltd has a 17% interest. EMU expects to see its equity in the Georgetown
JV increase further as it incurs cost on this maiden drilling program and subsequently.
Within the Yataga Igneous Complex copper is associated with anomalous molybdenum (Mo) in the
granite core and locally silver, bismuth and tellurium in the shear zones. This metal distribution (and
other metals including gold, lead, zinc, arsenic and antinomy) broadly display zonation patterns
outward from the granite core. The best copper-mineralisation at surface is associated with the veins,
shears and aplite dyke swarms at the Fiery Creek and Yataga Valley prospects.
Gold mineralisation is widespread through EMU’s Georgetown tenure which hosts over 65 historic
shallow surface to underground mine workings. Very high gold grades have been encountered in
previous sampling (ASX announcement 7 December 2023).
Fully funded
The recent sale of EMU’s WA assets (ASX announcement 22 September 2025) and par al comple on
of a non-renounceable rights issue (ASX announcement 26 September 2025) has le the Company in
the financial posi on that will enable the maiden drilling program to proceed forthwith.
As there is no need for further funding at this me, the Company advises that it will not allot or issue
any shor all securi es in rela on to its recent non-renounceable rights issue. Furthermore, there will
be no addi onal drawdown of the Northmead Holdings Pty Ltd Loan Facility which has been fully
repaid a er a single ini al drawdown in September (ASX announcement 22 September 2025).
Queensland centralisation
The Company’s only exploration assets now consists of three Exploration Permit Minerals (EPMs) in
the Georgetown Mining District of Far North Queensland. These EPMs include the Yataga Copper
Project as described above. In this context and as part of the initial review undertaken by the board,
the Company has determined to judiciously and methodically, over the short to medium term, shift its
corporate presence to Brisbane, Queensland. The board considers this a prudent and appropriate step
having regard to both costs and local oversight given the Company’s core focus now is Queensland-
based exploration.
The 2025 Annual General Meeting of the Company will be held in Brisbane in Queensland, and a notice
of meeting will be dispatched to shareholders in due course (including by way of electronic mail-out).
The Company will ensure that appropriate oversight and protection measures are in place from a
corporate governance perspective as to the orderly and proper conduct of the meeting.
Page 3
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Drilling to commence early November
Exploration targets within the Yataga Igneous Complex are shown in Figure 2. The maiden drilling
program will target Fiery Creek, and the advance field crew is to be dispatched on Tuesday 21 October.
The drill rig will follow in early November to conduct a program comprising approximately 2500m of
reverse circulation (RC) drilling (ASX announcement 26 September 2025). Drilling will focus on areas
below surface copper mineralisation or geochemical anomalies with the highest priority given to
targets with coincident Induced Polarisation (IP) anomalies. The program will be conditional upon
access being maintained to the area prior to the onset of the wet season.
Subsequent drilling programs scheduled for 2026 are expected to test extensions of mineralisation at
Fiery Creek and, as yet untested, anomalies at Yataga Valley. Furthermore, the Board acknowledges
the significant gold poten al of EMU’s three EPMs within the Georgetown Mining District and targeted
explora on will evaluate the regions gold poten al in due course.
Figure 2 - The distribution of mineralised surface rock samples highlights the concentration of copper
mineralisation (chalcopyrite plus secondary Cu) in the central granite and aplite phases of the intrusion
in both Fiery Creek and Yataga Valley.
Page 4
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Clear strategic focus
The Board acknowledges the Company’s turbulent prior 12 month period, but reassures all
shareholders that the Company has a clear strategic focus and is committed to advancing the Yataga
Copper Project for the benefit of all shareholders.
RELEASE AUTHORISED BY THE BOARD
Contact Details: Adrian Griffin +61 418 927 658
E info@emunl.com.au
Investors can sign into our interactive investor hub and join in on the conversation
with Emu NL.
https://investorhub.emunl.com.au/auth/signup
- END –
Share your feedback
Discover