QUARTERLY ACTIVITY REPORT
3 MONTHS ENDED 30 September 2023
Despite EMU having conducted numerous field explora on ac vi es at its Condingup
Georgetown and Badja projects during the quarter, repor ng significant geological advances
and success from each of these highly prospec ve projects, subdued capital markets failed to
credit the commitment, focus or por ve progress and results.
EMU’s in field explora on ac vi es during the repor ng period included:
Completion of geophysical, passive seismic surveys at each of its four, 100% owned,
REE projects – Condingup, Viper, Graceland and Viper;
Completion of a first pass aircore drilling programme at its premier clay hosted REE1
Condingup project;
Follow-up on new lithium targets derived from a regional mineralisation study
discovering spodumene at its Badja project;
Completion of a 15-day reconnaissance field survey and sampling programme at the
Georgetown project leading to the report of outstanding copper, silver and lead from
numerous prospects2.
Condingup REE Project
A passive seismic survey was conducted during June and July3 to map the depth to granite
basement along predetermined road sections and thereby identify prospective “clay trap zones”
in areas overlaying and adjacent to the highly fertile clay hosted REE Booanya Granite suite. The
survey identified multiple, kilometre-scale (3 to +6km wide), shallow clay traps to 100m
depth associated with the Booanya Granites. It produced readily available “walk-up” drill
targets including substantial, repeated, 3-4km wide “flank” clay trap zones surrounding
the intrusive Booanya plutons. Results from this survey prompted EMU to commence its
maiden aircore drilling programme.
1
REE – Rare Earth Element
ASX Release “Copper Silver Lead Assay Results Pegmatite Fields Georgetown” 5 October 2023
3
ASX Release “Substantial Increase in REE Prospectivity at Condingup WA” 24 July 2023
2
ABN 50 127 291 927 | 10 Walker Avenue, West Perth, WA, 6005 | PO Box 1112, West
Perth, WA, 6872 E: info@emunl.com.au | www.emunl.com.au | ASX Code: EMU
Figure 1. Passive Seismic Survey cross sec on of Merivale Road showing Flank, Internal and Paleochannel
Clay Traps iden fied in the passive seismic survey. The magnitude of the prospec vity is demonstrated by
the 20km length of this cross sec on.
Figure 2. Passive seismic survey lines tested overlying Booanya Granite intrusions.
The aircore drilling programme was completed on time and within budget in the first week of
September 2023 with 2,762m drilled over 34 holes. Average drill hole depth to basement rock
was 81.2m, coincident with the depths interpreted from the passive seismic survey.
The programme proved to be exceptionally successful in that the drilling intercepted thick clay
layer horizons within the weathering profile of the granitoid plutons in line with the geological
interpretations and expectations. The assay results from this drill programme (received in the
subsequent quarter to the one under report) confirmed the fertility of these target zones at
Page | 2
depth4 (see Figure 3 - Aircore drilling chip trays highlighting clay profile).
The “first-pass” drilling programme tested only a small proportion of the substantial portfolio of
targets EMU has generated within the extensive 1,560 square kilometre Condingup REE Project.
The drill programme focussed on the western and eastern Booanya granite intrusive suites (see
Figure 4 – Drill Collar Location Plan).
Figure 3– Aircore drilling chip trays showing typical weathering profile through the Booanya Granite
regolith from surface to bedrock (Drill Hole 23CAC014/ EOH = 94m/ Loca on 472745mE 6259418mN)
4
ASX Release “Extensive High Grade REEs over multiple km at Condingup Project” 9 October 2023
Page | 3
Figure 4 –Drill Collar Plan showing positions relative to geology and EMU tenement boundaries
Figure 5. Aircore drilling commences at EMU’s Condingup REE Project 60kms east of Esperance WA
Page | 4
Badja Gold/Tungsten Project
Following a review of the Badja project’s structural and geochemistry datasets by a
consulting geologist, Mr Nigel Maund, EMU conducted a short field verification survey
during September 2023. This survey identified the presence of LCT (Lithium-CesiumTantalum) pegmatites. Subsequent LIBS analyser testwork of rock samples, the UV
fluorescing of spodumene and the visual identification of the crystal morphology support
the presence of lithium-bearing spodumene crystals contained in mafic rock samples
returned from the field. The LIBS analyser reading on the hand samples have obtained
values of 1,426ppm Li (equivalent to 0.31% Li 2 O), see Figure 6 below. LCT pegmatite
occurrences at Badja are interpreted to be sourced from discrete highly fractionated, latestage granite plutons on the south-west portion of the project.
Figure 6. – Hand-specimen of spodumene crystals in LCT pegmatite showing strong pink
fluorescence, a characteristic feature under long-wavelength UV light (Sample ID: ESS02321 Location -28.59985257, longitude 116.8597968).
Mr Maund was commissioned in July 2023 to investigate the importance of the regional
granite intrusive bodies surrounding the project area. 5 EMU’s geologists posit that the
late stage, fractionated, intrusive granite plutons, identified primarily from airborne
geophysical surveys, are the key drivers of high-grade gold and tungsten occurrences at
Badja. The investigation by Mr Maund revealed major LCT Pegmatite pathfinder
geochemistry and element associations in historic and recent EMU geochemistry leading
to the field survey.
5
Report by Mr Nigel Maund BSc (Hons)Lond., MSc, DIC, MBA, F.Aus.IMM, FAIG, F.SEG, FGS, MMSA, Consultant
Economic Geologist “A Report on Badja Gold Project Area Near the Historic “Gnows Nest” Gold Mine,
Wadgingarra Gold Field, Badja Sta on, Western Australia”, 25 August 2023
Page | 5
Figure 7. – Conceptual model for LCT pegma tes in the western and southern intrusive-mafic
contacts at Badja. Mul -element geochemistry, par cularly the immobile elements (eg., Rb, Cs & Be)
supports a late-stage frac onated granite source. Note loca on of sample and spodumene specimen
reported in this announcement.
Page | 6
Georgetown Mul -Minerals Project
EMU completed its maiden reconnaissance 15-day field trip conduc ng mapping, soil
sampling and rock chip sampling during July and August 2023. The programme followed up
some of many historic datasets and explora on ac vi es as well as EMU’s targe ng from
latest mapping and open-source informa on. The Georgetown project area has not seen any
systema c explora on for decades. As part of the programme, EMU also followed up the
existence of and confirmed numerous possible lithium fields6 which have been historically
reported from the tenement areas.
A substantial (potentially polymetallic) system was identified within the Fiery Creek
tenement from which EMU, post quarter, has received assay results from in situ rock
sampling evidencing broad, high-grade copper and silver mineralisation 7. EMU also
identified numerous, extensive outcropping pegmatite veins in the Fiery Creek and
Perpendicular Peak tenements. Rock sample assay results received subsequent to
report date from the Snake Creek prospect area evidence high-grade lead and silver
mineralization.
Results from the field trip confirm the outstanding prospectivity for the historically
underexplored Georgetown area, vindicating EMU’s strategic decision to farm into the
project 8.
Figure 8.- Georgetown project loca on map showing outline of tracks and sample loca ons
from EMU’s maiden field reconnaissance trip July-August 2023
6
“Emerging Strategic Minerals in Queensland”, July 2017, Queensland Department of Natural Resources and
Mines.
7
ASX Release “Copper Silver Lead Assay Results Pegmatite Fields Georgetown” 5 October 2023
8
ASX Release “Scale Project Added to Exploration Portfolio” 1 September 2022
Page | 7
Viper, Graceland and Merredin REE Projects
EMU conducted passive seismic surveys at the Viper, Graceland and Merredin projects
confirming in all cases sufficient depths of clay to warrant aircore drilling programmes.
Sunfire Nickel, Copper Project
EMU has met all required environmental obliga ons with respect to accessing WA State Forest
areas within the project with the commencement of onsite explora on ac vi es remaining
stalled by ongoing regulatory environmental red-tape. This unreasonably long, drawn-out
process to gain environmental approvals from Government, despite the a endance of EMU’s
creden aled environmental consultants and AMEC (Associa on of Mining and Explora on
Companies, of which EMU is a member) is an una rac ve hallmark. The complete lack of
progress coupled with the absence of any indica on from the Government departments as to
the likely probability of drilling consent being forthcoming has frustrated effec ve explora on
that would have been in the interest of the State and its peoples. EMU has placed progress on
the back burner to allow Governmental instrumentali es to respond at their glacial pace.
ASX Addi onal Informa on
EMU provides the following information pursuant to ASX Listing Rule requirements:
(a)
ASX Listing Rule 5.3.1 - Exploration and Evaluation Expenditure during the quarter
was $142k. Full details of exploration activities during the June quarter are set out in
this report;
(b)
ASX Listing Rule 5.3.2 - There was no substantive mining production or development
activity during the quarter;
(c)
ASX Listing Rule 5.3.3 – Details of mining tenements acquired or disposed of during
the quarter, and held at the end of the quarter, are set out in this report; and
(d)
ASX Listing Rule 5.3.5 - payment to related parties of the Company and their
associates during the quarter: $53k cash. The Company advises that this relates to
remuneration for services as directors (including statutory superannuation), and for
office rental paid to a director.
Page | 8
Table 1: Tenement Schedule (Status as at 30 September 2023)
Tenement ID
(DMIRS ID)
Project
Type
Descrip on/ Status
M59/739 – Gnows Nest
E59/2315 – Gnows Nest
Badja
Badja
Mining
Explora on
EMU 100% - Granted
EMU 100% - Granted -
P59/2068 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
P59/2071 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
P59/2072 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
P59/2073 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
P59/2074 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
E59/2495 – Warramboo
Badja
Explora on
EMU 100% - Granted
E59/2817 - Warramboo
Badja
Explora on
EMU 100% - Pending
E70/5507 – Sunfire
Sunfire
Explora on
EMU 100% - Granted
E70/5346 – Sunfire
Sunfire
Explora on
EMU 100% - Granted
E70/5146 - Graceland
Graceland
Explora on
EMU 100% - Granted
E70/5603 – Roe
Graceland
Explora on
EMU 100% - Granted
E70/6066 – Roe
Graceland
Explora on
EMU 100% - Granted
E70/5155 – Viper
Viper
Explora on
EMU 100% - Granted
E70/5602 – Kent
Viper
Explora on
EMU 100% - Granted
E70/6430 – Kent
Viper
Explora on
EMU 100% - Granted
Condingup
Condingup
Condingup
Condingup
Condingup
Condingup
Condingup
Merredin
Balladonia
Balladonia
Condingup
Condingup
Condingup
Merredin
Merredin
Badja
Merredin
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
Explora on
EMU 100% - Granted
EMU 100% - Granted
EMU 100% - Granted
EMU 100% - Granted
EMU 100% - Granted
EMU 100% - Granted
EMU 100% - Granted
EMU 100% - Pending
EMU 100% - Pending
EMU 100% - Pending
EMU 100% - Granted
EMU 100% - Granted
EMU 100% - Granted
EMU 100% - Pending
EMU 100% - Pending
EMU 100% - Granted
EMU 100% - Pending
E63/2277 - Neridup
E63/2278 - Neridup
E63/2295 - Neridup
E63/2296 - Neridup
E63/2304 - Neridup
E63/2305 - Neridup
E69/4116 - Neridup
E70/6300 – Avon
E69/4117 - Balladonia
E69/4118 - Balladonia
E63/2326 - Neridup
E69/4146 - Neridup
E63/2342 - Neridup
E70/6434 – Nelson
E70/6436 - Nelson
E59/2836 - Warramboo
E70/6513 - Avon
Page | 9
AUTHORISED FOR RELEASE BY DOUG GREWAR, CEO
For further informa on, please contact:
Doug Grewar
Chief Execu ve Officer
Mobile: 0419 833 604
info@emunl.com.au
Investors can sign into our interac ve investor hub and join in on the conversa on with Emu
NL.
h ps://investorhub.emunl.com.au/auth/signup
EMU Investorhub QR Code
Page | 10
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
1,450,021,079 (including 18.6m the
subject of the ATM which EMU can buy
back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay,
no call before 31 December 2023
Contributing Shares (Unlisted)
35,000,000 paid to $0.0001, $0.04 to
pay, no call before 31 December 2025
Options (unlisted)
172,453,621 options to acquire fully paid
shares, exercisable at $0.01 each, on or
before 7 October 2024
Performance Rights (Unlisted)
48,571,429 performance rights in
relation to acquisition of Gnows Nest
project
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
M +61 419833604
E info@emunl.com.au
COMPETENT PERSON’S STATEMENT
The informa on in this report that relates to
explora on results is based on, and fairly represents
informa on and suppor ng documenta on prepared
by Kur s Dunstone, a Competent Person who is a
Member of the Australian Ins tute of Geoscien sts.
Mr Dunstone is an employee of EMU NL and has
sufficient experience in the ac vity which he is
undertaking to qualify as a Competent Person as
defined in the 2012 edi on of the “Australasian Code
for Repor ng of Explora on Results, Mineral
Resources and Ore Reserves”. Mr Dunstone consents
to the inclusion herein of the ma ers based upon his
informa on in the form and context in which it
appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertain es and
other factors, actual events and results may differ
materially from any forward looking and other
statements herein not purpor ng to be of historical
fact. Any statements concerning mining reserves,
resources and explora on results are forward looking
in that they involve es mates based on assump ons.
Forward looking statements are based on
management’s beliefs, opinions and es mates as of
the respec ve dates they are made. The Company
does not assume any obliga on to update forward
looking statements even where beliefs, opinions and
es mates change or should do so given changed
circumstances and developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new
informa on or data that materially affects the
informa on included in the original market
announcements and, in the case of es mates of
Mineral Resources, which all material assump ons
and technical parameters underpinning the es mates
in the relevant market announcement con nue to
apply and have not materially changed. The Company
confirms that the form and context in which the
Competent Person’s findings are presented have not
materially changed from the original market
announcement.
- END -
Page | 11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
EMU NL
ABN
Quarter ended (“current quarter”)
50 127 291 927
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 September 2023
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
-
(142)
(142)
(b) development
-
-
(c) production
-
-
(d) staff costs
(206)
(206)
(e) administration and corporate costs
(153)
(153)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
6
6
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(495)
(495)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(58)
(58)
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(a) entities
(b) tenements
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(58)
(58)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,149
1,149
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(495)
(495)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(58)
(58)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
596
596
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2
62
5.2
Call deposits
588
1,081
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
Cash deposit held in US$
6
6
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
596
1,149
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
53
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
-
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(495)
8.4
Cash and cash equivalents at quarter end (item 4.6)
596
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
596
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.2
(495)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: EMU expects that it will continue to have negative operating cash flows as is usual
for mining exploration entities, but expenditures on discretionary exploration
expenses will be curtailed as needed, dependent on available cash resources.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Since the end of the quarter, EMU agreed to place up to 600M ASX:EMU shares to
raise up to $900k (refer ASX release 12 October 2023). Of this amount, 217.5M
shares have been issued, raising $326.25k. The balance of up to ~$574k is
expected to be received once shareholder approval has been granted at the
Company’s AGM set to be held 30 November 2023.
The Company also has a Controlled Placement Agreement with Acuity Capital
(Updated December 2020) which as yet has not been actioned. A total of
18.6 million ASX:EMU shares could be placed at market to activate the facility.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: EMU expects to be able to continue its operations and meet its business objectives
based on its responses to 8.8.1 and 8.8.2 above.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 October 2023
Authorised by: Doug Grewar - CEO
(Name of body or officer authorising release – see note 4)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover