AMENDED ASX RELEASE
Pursuant to a request made by ASX, Emu NL hereby resubmits the ASX Release
made on 24 July 2023 in its entirety, and requests that readers disregard the
original announcement.
This announcement now includes a completed JORC table.
RELEASE AUTHORISED BY DOUG GREWAR
Contact Details: Doug Grewar - Mobile: 0419 833 604
E info@emunl.com.au
- END -
EMU NL
10 Walker Avenue, West Perth, WA, 6005
T: +61 (08) 9226 4266
info@emunl.com.au
ABN 50 127 291 927
PO Box 1112, West Perth, WA, 6872
ASX Codes: EMU, EMUCA
www.emunl.com.au
Substantial Increase in REE Prospectivity,
Drilling to Commence Condingup WA
24 July 2023 – Amended to include JORC table
Following an incredibly successful rock chip sampling field programme, EMU NL (ASX:
EMU) (“EMU” or “the Company”) is excited to announce results of its recently completed first
pass, Passive Seismic Survey (PSS) at its 100% owned Condingup Project near Esperance WA.
The survey, conducted during June and July, was initiated to test for depth of clays, identify “clay
trap zones” and to determine drill depths in areas overlaying and adjacent to the highly fertile
clay hosted Rare Earth Element (REE) Booanya Granite suite. Passive seismic surveys were also
completed at EMU’s REE Viper, Graceland and Merredin discoveries.
HIGHLIGHTS
1
Substantially enhanced exploration potential, with the identification of multiple,
kilometre scale (3 to +6km wide), shallow clay traps to 100m depth associated
with the Booanya Granites.
Targeted aircore drilling programme to test the clay hosted REE enrichment at
Condingup.
The PSS confirms EMU’s conceptual modelling of weathered zones surrounding
and overlaying the highly fertile REE Booanya Granites.
Multiple target areas revealed by the survey with interpreted clay depths ranging
between as little as 20m down to 100m and pointing to significant clay trap zones
identified for follow up drilling.
A wide 6km+ paleo channel identified on the eastern margin of the most westerly
Booanya Granite intrusions, presents an excellent, large scale “walk-up” clay-trap
drill target.
Walk up drill targets include substantial, repeated, 3-4km wide “flank” clay trap
zones surrounding the intrusive Booanya plutons. The identified flank traps are
likely to exhibit economically significant REE enrichment based on results recorded
from EMU’s rock sample programmes1.
A number of Booanya Granite intrusions are yet to be tested by the PSS
methodology. It is expected potential REE clay traps might be identified in
subsequent surveys thereby enhancing prospectivity in these areas.
Emu has demonstrated passive seismic surveying to be a powerful geophysics
technique to identify depths of weathered lithologies overlaying bedrock. The
ASX Release “Assays Confirm Magnetic and Heavy Rare Earth Fertility” 14 March 2023
ABN 50 127 291 927 | 10 Walker Avenue, West Perth, WA, 6005 | PO Box 1112, West
Perth, WA, 6872 E: info@emunl.com.au | www.emunl.com.au | ASX Code: EMU
surveys provide the foundation for targeted drill collar locations in the identified
clay traps, significantly reducing exploration drill costs.
Comparisons between EMU’s survey, open-source gravity and airborne
electromagnetic surveys have enhanced drill targeting in areas where EMU is
seeking broader concentrated REE clay trap zones which may lead to large
economic resource envelopes.
Passive seismic surveys have now been completed at each of our 4 REE discovery
projects in WA; namely, Condingup, (near Esperance), Viper (near Jerramungup),
Graceland (near Hyden) and Merredin (30kms north of that regional centre).
Each of the surveys has produced highly successful outcomes in terms of drill
vectoring, laying the foundation for numerous drill programmes.
Peter Thomas, EMU’s Chairman, comments
“EMU’s Passive Seismic Survey programme, which was conducted over our WA based REE
discovery projects, has provided us with resounding success, adding to the weight of evidence
suppor ng EMU’s conceptual modelling for poten al REE clay trap hosted zones at each of the
projects. The surveys have provided us with walk up drill targets at all of our REE projects through
the defini on of vectors to loca ons of shallow broad trap zones with poten ally economically
enriched concentra ons of REE.
At Condingup, highly significant broad clay zones have been interpreted for immediate walk-up
drilling targets including an interpreted clay paleo-channel more than 6kms wide, open to the
east, north and south. Broad, 3-4km wide, clay traps zones surrounding the “flanks” of Booanya
granite plutons surveyed, present as highly prospec ve drill targets.
The Board has requested an immediate aircore drilling programme to test the clay hosted REE
enrichment at Condingup.”
Passive Seismic Surveys
Passive seismic surveying is a geophysics method used to determine the depth of weathered,
oxidised material which overlies basement rock. EMU, working with its Geophysics Consultants,
Resource Poten als, has completed passive seismic surveys at its Condingup, Viper, Graceland
and Merredin REE Projects. The programme was ini ated following results recorded from assays
of EMU’s rock chip sampling programmes at its projects and from RC drilling programmes (drilled
targe ng other commodi es) at Graceland and Viper. The PSS were directed at delinea ng the
most prospec ve areas for aircore drilling.
Figure 1. Passive Seismic Survey cross sec on of Merivale Road showing Flank, Internal and
Paleochannel Clay Traps iden fied in the passive seismic survey. The magnitude of the
prospec vity is demonstrated by the 20km length of this cross sec on. Loca on of Line 01 in
Figure 3. below
Conceptual modelling of clay hosted REE’s, supported by substan al evidence from elevated REE
results in clay hosted REE explora on areas, suggests concentra ons of REE are formed in the
saproli c, deeper trap zones surrounding fer le host rocks. (See Figure 2). The surveys support
EMU’s modelling at our REE projects and has added further prospec vity for economic
concentra ons of REE by the indica on of significant, broad trap zones. The success of the
surveys now provides EMU with confidence to ini ate a scien fically targeted and cost effec ve
aircore drilling programme at Condingup.
Figure 2. Conceptual Model showing types of clay traps and possible concentra ons of REE.
Condingup REE Project
A maiden aircore drill programme at Condingup to target clay trap zones surrounding and
overlying the Booanya granite plutons is to be ini ated forthwith. The interpreted surrounding
“flank clay traps” provide excellent targets as they are located adjacent to the host rocks and
present as shallow, highly weathered clays.
A seismic line, tes ng clay depths along Merivale Road, Condingup (Figure 1), has reported a
wide, shallow north – south striking paleochannel. The paleochannel, which is closed out to the
west but otherwise open to the north, south and east, provides EMU with an extensive,
outstanding walk-up drill target, being adjacent to the western most, Booanya granites REE host.
Based on the modelling of concentra ons of REE and the yet to be determined boundaries of the
paleo channel, the magnitude of the REE target zone here could be significant.
Line 01
Figure 3. Passive seismic survey lines overlying Booanya Granite intrusions.
The survey conducted at Condingup has confirmed clay trap zones with depths interpreted
between 20-100m. The iden fied shallow nature of the clay traps presents as one of the more
highly desirable aspects of clay hosted REE deposits for mining.
Following rock chip sampling programmes, assays confirmed the fer lity of the Booanya Granites
(Figure 4). EMU believes the planned 3,000m, maiden aircore drilling programme will likely yield
higher concentra ons of REE than the results reported from its rock and clay sampling
programmes.2
Open-source gravity survey and airborne electromagne c survey informa on was overlaid with
results from EMU’s passive seismic survey. Informa on from the combined overlay, confirms and
reinforces the passive seismic survey results and further supports the accuracy of clay depths and
prospec ve drill areas.
EMU an cipates that the aircore drilling programme will commence late August, early September
2023 with the earliest results expected towards the end of September or in early October. Drill
collar loca ons will be established along the passive seismic survey lines and the ac vity will be
confined by access approvals and administra ve processes. Whilst comple ng the drill
programme EMU will sample drill cu ng material for metallurgical analysis.
About the Condingup Rare Earth Project
The 100% owned Condingup Rare Earth Project is located just 35kms southeast of ASX:OD6’s
Splinter Rock Project. That project is achieving success in a similar geological se ng within REE
enriched Booanya suite granites.
EMU’s Condingup Project, accessible by sealed roads, is situated just 60kms from the port of
Esperance and essen al infrastructure. Esperance is widely projected to become a central hub
for major renewable energy and green hydrogen produc on and is located within a well-regarded
explora on/mining support jurisdic on.
The 1,560 square kilometre Condingup Rare Earth Project overlies saprolite, clay enriched rare
earth soils, and covers REE enriched, geologically significant Booanya granite suite plutons. The
project tenements are located directly over what EMU considers to be some of the most
prospec ve and highly fer le clay hosted REE granite suites in the Esperance region.
2
ASX Release “Significant REE Values, Project Footprint Extended Condingup” 4 May 2023
Figure 4. Condingup REE Project highligh ng extensive regional land holding and broad
REE mineralisa on determined from a number of high value Total Rare Earth Oxides
(TREO’s) sampled from outcropping rocks including Booanya granites.
For further informa on, please contact:
Doug Grewar
Chief Execu ve Officer
Emu NL
info@emunl.com.au
Investors can sign into our interac ve investor hub and join in on the conversa on with Emu
NL.
h ps://investorhub.emunl.com.au/auth/signup
EMU Investorhub QR Code
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
1,450,021,079 (including 18.6m the
subject of the ATM which EMU can buy
back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay,
no call before 31 December 2023
Contributing Shares (Unlisted)
35,000,000 paid to $0.0001, $0.04 to
pay, no call before 31 December 2025
Options (unlisted)
172,453,621 options to acquire fully paid
shares, exercisable at $0.01 each, on or
before 7 October 2024
Performance Rights (Unlisted)
48,571,429 performance rights in
relation to acquisition of Gnows Nest
project
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
M +61 419833604
E info@emunl.com.au
COMPETENT PERSON’S STATEMENT
The informa on in this report that relates to
explora on results is based on, and fairly represents
informa on and suppor ng documenta on prepared
by Kur s Dunstone, a Competent Person who is a
Member of the Australian Ins tute of Geoscien sts.
Mr Dunstone is an employee of EMU NL and has
sufficient experience in the ac vity which he is
undertaking to qualify as a Competent Person as
defined in the 2012 edi on of the “Australasian Code
for Repor ng of Explora on Results, Mineral
Resources and Ore Reserves”. Mr Dunstone consents
to the inclusion herein of the ma ers based upon his
informa on in the form and context in which it
appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertain es and
other factors, actual events and results may differ
materially from any forward looking and other
statements herein not purpor ng to be of historical
fact. Any statements concerning mining reserves,
resources and explora on results are forward looking
in that they involve es mates based on assump ons.
Forward looking statements are based on
management’s beliefs, opinions and es mates as of
the respec ve dates they are made. The Company
does not assume any obliga on to update forward
looking statements even where beliefs, opinions and
es mates change or should do so given changed
circumstances and developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new
informa on or data that materially affects the
informa on included in the original market
announcements and, in the case of es mates of
Mineral Resources, which all material assump ons
and technical parameters underpinning the es mates
in the relevant market announcement con nue to
apply and have not materially changed. The Company
confirms that the form and context in which the
Competent Person’s findings are presented have not
materially changed from the original market
announcement.
- END –
JORC Code 2012 Edition Table 1:
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
No drilling undertaken.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g
charge for fire assay’). In other cases,
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
No drilling undertaken.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
No drilling undertaken.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
Criteria
JORC Code explanation
Commentary
preferential loss/gain of fine/coarse
material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to
a level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
No drilling undertaken.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
No drilling undertaken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precision have been established.
No drilling undertaken.
Criteria
JORC Code explanation
Commentary
Verification
of sampling
and
assaying
The verification of significant intersections
by either independent or alternative
company personnel.
No drilling undertaken.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
No drilling undertaken.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data
spacing
and
distribution
Data spacing for reporting of Exploration
Results.
No drilling undertaken.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been
applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Sample
security
The measures taken to ensure sample
security.
No drilling undertaken.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
No drilling undertaken.
No drilling undertaken.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The programme is reviewed on an
ongoing basis by Senior EMU NL
personnel.
Passive Seismic Horizontal to Vertical
Spectral Ratio (HVSR) surveys undertaken
Criteria
JORC Code explanation
Commentary
at Condingup were controlled and
monitored for QA/QC by external
geophysical consultants Resource
Potentials Pty. Ltd. Of Osbourne Park,
Perth WA.
JORC Code 2012 Edition Table 1:
Section 2 - Reporting of Exploration Reports
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The Condingup Project is held 100% by
Emu NL.
The project comprises a total of seven
tenements (see listing below) which
include both granted and areas under
application.
All works undertaken and reported in
this ASX announcement were completed
on the tenements listed below.
E 63/2277 (granted)
E 63/2278 (granted)
E 63/2296 (granted)
E 63/2305 (granted)
E 69/4116 (granted)
E 63/2326 (application)
E 63/2342 (application)
E 69/4146 (application)
The project tenements are all in good
standing.
The EL’s predominantly overly freehold
agricultural land used for crop and
livestock farming, with minor areas
overlying vacant Crown land.
The company has Native Title Land
Access Agreements in place.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Exploration
done by other
parties
Acknowledgment and appraisal of
exploration by other parties.
There has been no appraisal of rareearth element exploration by other
parties.
Geology
Deposit type, geological setting and style
of mineralisation.
The project lies within the Eastern
Nornalup Zone of the northeastern
trending Albany-Fraser Orogen (the
Fraser Province). This Province extends
along the southeastern margins of the
Yilgarn Craton.
The principal geological unit of interest
and host to the REE bearing intrusive
plutons (Esperance Granite) are 12001100 Ma Amphibolite to Greenschist
Criteria
JORC Code explanation
Commentary
facies metamorphic units that have
undergone a westward transport in
thrust sheets onto the Yilgarn Craton.
The rocks exhibit a regional weak to
moderate foliation.
The geomorphology of the Condingup
area exhibits a variety of landforms and
is characterised by low hills, rolling plains
and some possible remnants of ancient
volcanic activity. The weathering profile
is typically deep (as shown by the Passive
Seismic geophysical work reported
herein) and exhibit typical regolith
formation over Archaean rocks (lateritic
residuum, saprolite formation, saprock
and bedrock).
Drill hole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
No drilling undertaken.
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of
the report, the Competent Person should
clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
No drilling undertaken.
Criteria
JORC Code explanation
Commentary
shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly
important in the reporting of Exploration
Results.
No drilling undertaken.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg ‘down
hole length, true width not known’).
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
Refer to maps and figures in the body of
the announcement.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
All meaningful information has been
included in the body of the text.
Other exploration data, if meaningful
and material, should be reported
including (but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk samples
– size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Geological interpretations have been
taken from published maps, geophysical
interpretation, historical and ongoing
exploration.
Geological and mineralisation
interpretations are based on current
knowledge and will change with further
exploration.
Reporting is considered balanced.
Passive seismic data was acquired by
EMU NL using 8 x self-contained
Tromino® TEB seismometer arrays
employing a sampling frequency of
128Hz. Each recording station had an
acquisition time ranging from 16 to 20
minutes. The Tromino® seismometers
were meticulously positioned at fixed
recording stations, ensuring firm
coupling to the ground and protection
from environmental factors, such as
wind-induced motion and wildlife
disturbances, to mitigate unwanted
noise interference.
To preserve spatial information, the
Tromino® instruments were equipped
with in-built GPS antennas, allowing for
accurate location recording of each
Criteria
JORC Code explanation
Commentary
station. A Garmin GPSMap 66i was used
to confirm station location. Additionally,
comprehensive field logs were diligently
maintained, manually documenting
station identities, associated field
conditions, and corresponding
geographic coordinates. These field logs
served multiple purposes aiding in data
processing, facilitating cross-sectional
analysis, and ensuring precise station-tolocation matching throughout the
survey.
Further work
The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
Further work will include the
implementation of an air core drilling
programme (AC drilling) to define
economic intervals of REE
concentrations in the main target zones.
These are prioritised according to host
rock environments (principally within or
adjacent to Booanya Granites) and deep
regolith formation (clay traps, paleo
channels and deeply weathering of
regolith).
- END -