SUMMARY
Emu confirms the discovery of a major, new, extensive gold-silver-base metal mineralised
epithermal system at Vidalita on receipt of all final assays
Geological interpretation shows two major mineralised zones
A shallow, aerially extensive, silver-gold mineralised vuggy silica zone blankets the area drilled
at Vidalita
A deeper brecciated diatreme, composed of a suite of volcanic-related lithologies with up to 8.4g/t
gold, 1,049g/t silver, 5.4% copper, 2.2% lead, and 3.7% zinc
Check one metre assays of four metre composite samples confirm results
Emu completed a circa $600,000 capital raising with the placement of ~12.29M shares at 4.8c to
Sophisticated Investors
Vidalita, Chile
All assay data from the 2017–2018 drilling season at Vidalita were received during the Quarter
(ASX announcement on 6 July 2018.)
Interpretation of geological and assay data indicates that Vidalita has potential for a shallow, aerially
extensive, silver dominated mineralisation hosted by a blanketing vuggy silica zone. This material
generally assays around 30g/t silver (Table 1) and will be followed up with infill drilling.
Table 1 Summary of significant shallow silver intercepts, Vidalita prospect. Assay
intervals of more than 5g/t silver were averaged. Single assays within an interval
falling below 5g/t were included in the average. High grade zones used a bottom
cut-off of 25g/t. Assay interval for AC was 4m, for DDH it was 1m.
Hole No
Drilling
method
From
m
To
m
Interval
m
Silver
g/t
4900-1
AC
5100-4
5300-4
5900-5
AC
AC
AC
40
36
32
44
20
16
48
64
52
84
24
24
8
28
20
40
4
8
33
23
8
8
35
24
52
44
56
60
4
16
148
88
in
in
in
6500-2
AC
ASX:EMU – Released 31 October 2018
Page 1 of 7
Emu NL
Activity Report
for the Quarter ending 30 September 2018
Deeper, the brecciated diatreme that has been intersected has increased gold levels and the potential
for significant base metal (lead, zinc, and copper) mineralisation (Figure 1). Extensive zones of zinc
mineralisation, generally in the 0.1 to 0.2% range, have been intersected (Table 2).
Table 2 Summary of significant base metal intercepts, Vidalita prospect. Assay interval
for AC was 4m, for DDH it was 1m.
Hole
5100-3
5300-2az
5700-1b
incl
6500-2
Interval
m
From
m
To
m
8
16
21
66
37
4
1
7
32
184
228
211
171
181
215
216
251
32
192
244
232
237
218
218
217
257
64
Copper
%
Lead
%
Zinc
%
0.36
0.54
0.22
0.27
0.24
2.18
5.37
0.99
2.24
0.18
0.13
1.61
3.65
1.34
0.57
Identification of drilling targets for the 2018–2019 drilling season has been completed (ASX
announcement 5 October 2018) with planning for the field work well underway.
Drilling will be conducted using an aircore drill rig, as was done for the last campaign. This rig
provides Emu with an excellent commercial advantage over our peers. By the end of the last drilling
campaign the aircore method delivered drilled metres at about one fifth the cost and five times the
productivity of that achieved by Chilean drillers whilst providing an excellent sample for both
assaying and geological logging. It is planned to use a locally sourced diamond drilling rig to
undertake the deeper drilling required.
Activities subsequent to the Quarter
Emu announced a Share Purchase Plan (SPP) for existing, eligible shareholders. Up to $15,000 worth
of shares at 4 cents each are offered. The money raised is to be used to continue drill follow-up of
the Vidalita Prospect drilling results and drill evaluation of promising targets as yet untested in the
Vidalita Project. The SPP is proposed to be capped at 15,000,000 new shares but the Directors of
Emu reserve the right to accept applications up to an overall maximum of 27,299,900 new shares and
to close the offer early to ensure this cap is not breached.
Project generation
Emu continues to assess projects which may fulfil its criteria of near-term production with worthwhile
potential and financial upside. A number of potential projects in Australia and overseas were
evaluated. None met Emu’s strict criteria for investment.
ASX:EMU – Released 31 October 2018
Page 2 of 7
Emu NL
Activity Report
for the Quarter ending 30 September 2018
Figure 1 Section 5300N. Gold grade histogram in gold, silver in green. This is a preliminary, simplified
geological interpretation based on sparse data and subject to change as more data comes to hand. Co-ordinate
system is WGS84/UTM19S.
Corporate
Emu has raised ~$600,000 from sophisticated investors at a price of $0.048 per share (ASX
announcement 25 June 2018). The first tranche of 4,894,330 shares was placed by 18 July 2018 (ASX
announcement 18 July 2018) with the second tranche placed on 30 August 2018 (ASX
announcement) following shareholder approval reported to the ASX on 29 August 2018.
Mr G Steemson stepped down from his role of Managing Director (ASX announcement 2 July 2018).
He remains as a non-executive director with continuing responsibility for identifying and assessing
new opportunities.
Company and project promotion, through roadshows and direct engagement with brokers, is ongoing.
ASX:EMU – Released 31 October 2018
Page 3 of 7
Emu NL
Activity Report
for the Quarter ending 30 September 2018
ASX Waiver- Approval to issue shares
On 8 February 2017, the Company received shareholder approvals for the issue of up to 15 million
shares (Consideration Shares; 2,500,000 of which were issued shortly after the approvals) in respect
of the Option Agreement (for the option to purchase the Vidalita and Jotahues projects – Projects)
with Prospex SpA and BLC SpA.
The following information is provided in accordance with a waiver granted by ASX permitting the
Company to issue the balance of the Consideration Shares (12,500,000) more than 3 months after the
date of the approvals:
a)
No Consideration Shares were issued during the reporting period;
b)
12,500,000 of the Consideration Shares remain, conditionally, to be issued; and
c)
the conditions to and instalments in which the remainder of the Consideration Shares may
be issued are:
i)
2,500,000 (approved for issue no later than 31 March 2019) if the Company elects to
continue exploring the Projects and subject to it meeting its expenditure commitment
in relation to the Projects (minimum of US$1 million by 10 December 2018) and;
ii)
5,000,000 (approved for issue no later than 31 December 2020) if the Company
exercises the option and defines a 500,000 ounce measured resource of gold on the
Projects; and
iii)
5,000,000 (approved for issue no later than 31 December 2020) if the Company
exercises the option and defines a 1,000,000 ounce measured resource of gold on the
Projects.
ASX:EMU – Released 31 October 2018
Page 4 of 7
Emu NL
Activity Report
for the Quarter ending 30 September 2018
Table 3: Schedule of Tenements – Atacama Region, Chile
Concession
Type of
concession
Percentage held / earning*
Vidalita A2
Vidalita B2
Vidalita C2
Vidalita D2
Vidalita E2
Vidalita F2
Vidalita A1 1/60
Vidalita B1 1/60
Vidalita C1 1/60
Vidalita D1 1/60
Vidalita E1 1/36
Vidalita F1 1/40
Vidalota A
Vidalota A1 AL18
Vidalota B
Vidalota B1 AL20
Vidalota C
Vidalota D
Vidalota E
Peon 1-3
Peon 6-7+10
Peon 12-15
Ciclope Tuerto 7-9
Ciclope TuertoA2-A6
Ciclope Tuerto 1
Tierra 6
Tierra 1-5, 7-13
Exploration
Exploration
Exploration
Exploration
Exploration
Exploration
Exploitation
Exploitation
Exploitation
Exploitation
Exploitation
Exploitation
Exploration
Exploitation
Exploration
Exploitation
Exploration
Exploration
Exploration
Exploration
Exploration
Exploration
Exploration
Exploration
Exploration
Exploration
Exploration
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (Prospex/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Option to acquire 100% (BLC/Emu Option Agreement)
Emu 100%
Investor enquiries
General Manager
T +61 8 9226 4266
E info@emunl.com.au
ASX:EMU – Released 31 October 2018
Page 5 of 7
Emu NL
Activity Report
for the Quarter ending 30 September 2018
About EMU
About the Vidalita and Jotahues Gold Projects, Maricunga Belt, Chile
Maricunga Belt: Host to Very Large Gold Deposits
Salares Norte (Gold Fields)
3.1 Moz Au & 34 Moz Ag
La Coipa (Kinross, pre-mining)
1.3 Moz Au & 64 Moz Ag
Cerro Maricunga (Atacama Pacific) 5.9 Moz Au & 4 Moz Ag
Marte-Lobo (Kinross)
6.2 Moz Au
Maricunga Mine (Kinross)
6.3 Moz Au
Caspiche project (Exeter)
19.8 Moz Au & 40Moz Ag
Cerro Casale (Barrick/Kinross)
25.4 Moz Au & 43Moz Ag
Alturas (Barrick)
6.8 Moz Au
The Vidalita and Jotahues gold projects are located in the Maricunga gold belt in the Atacama Region
in northern Chile hosting numerous world class gold and silver projects. Emu’s projects cover an area
of approximately 13,570 hectares secured by mineral exploration concessions and host alteration and
mineralisation that appear geologically similar to other high sulphidation gold deposits of the
Maricunga gold belt. The projects are accessed using a network of roads that link Copiapó with the
Refugio project (Kinross), Cerro Casale project (Barrick/Goldcorp) and the Caspiche project
(Goldcorp). Refugio is located 30 km to the northwest of Vidalita.
The Company holds an option (Option) to acquire a 100% interest in certain of the Vidalita and
Jotahues concession packages from two Chilean companies.
The concessions are the subject of the Option comprise two packages: the Prospex SpA area covers
six concessions at Vidalita and is subject to a 2% NSR on any production. An Option payment of
US$100,000 is due in November 2018 if Emu elects to continue with the project. The Option may be
exercised in November 2019 on payment of US$2M following expenditure of US$1M (which has
been met), the issue of 2.5M Emu shares and then if Emu defines: (i) 0.5Moz of gold in measured
resources, a further 5M ordinary shares will be issued; and (ii) 1Moz of gold in measured resources,
a further 5M ordinary shares will be issued.
The BLC SpA area comprises of three concessions at Jotahues and two concessions at Vidalita
(Vidalota A&B) is subject to a 1% NSR.
Emu continues to look for new mineral exploration, development and mining opportunities within
Australia and at various overseas jurisdictions.
ASX:EMU – Released 31 October 2018
Page 6 of 7
Emu NL
Activity Report
for the Quarter ending 30 September 2018
Emu NL
ABN 50 127 291 927
ASX Code: EMU
10 Walker Ave
West Perth WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth WA 6872
Fully paid shares (listed)
90,999,728 (inc. 4m which Emu can buy
back for nil consideration)
Contributing Shares (listed)
33,668,824 paid to $0.03, $0.03 to pay, no
call before 31/12/2018
Options (unlisted)
4,750,000 unlisted options, exercisable at
$0.10, expiring 20 December 2018
2,000,000 unlisted options exercisable at
$0.11 expiring 20 December 2018
300,000 options, exercisable at $0.25,
expiring 20 December 2018
Directors:
Peter Thomas
Non-executive Chairman
Greg Steemson
Non-Executive Director
Gavin Rutherford
Non-Executive Director
ASX:EMU – Released 31 October 2018
COMPETENT PERSON’S STATEMENT
Any details contained herein that pertain to exploration
results, mineral resources or mineral reserves are based
upon information compiled by Mr Marcus Flis, General
Manager of Emu NL. Mr Flis is a Fellow of the
Australasian Institute of Mining and Metallurgy
(FAusIMM) and has sufficient experience in the
activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC
Code). Mr Flis consents to the inclusion herein of the
matters based upon his information in the form and
context in which it appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertainties and other
factors, actual events and results may differ materially
from any forward looking and other statements herein
not purporting to be of historical fact. Any statements
concerning mining reserves, resources and exploration
results are forward looking in that they involve
estimates based on assumptions. Forward looking
statements are based on management’s beliefs, opinions
and estimates as of the respective dates they are made.
The Company does not assume any obligation to update
forward looking statements even where beliefs,
opinions and estimates change or should do so given
changed circumstances and developments.
Page 7 of 7
Share your feedback
Discover