ASX RELEASE | ASX: EMU
31 July 2024
Quarterly Activity Report
30 June 2024
EMU NL (“EMU” or “the Company”) is pleased to report on its activities for the quarter ending
30 June 2024. Throughout the quarter, EMU has continued its primary focus on the Fiery Creek
Prospect within the Georgetown Project, in North Queensland.
Highlights
Successful geochemistry program completed at the Fiery Creek Prospect with high-grade
copper assays up to 23.5% Cu from rock-chip samples
The mineralised discovery zone, tested by pXRF over soil, termite mound and rock chip
sample mediums, covers an area approximately 720m long x 480m wide
pXRF geochemistry programme confirmed extensive broad copper mineralised zone with
grades up to 2,484ppm Cu from pXRF soil samples and highest termite mound sample
recorded was 1,675ppm Cu
Results indicate the mineralisation is significant and pervasive between outcropping highgrade copper veining and stockwork veining within the discovery zone and is interpreted
to be a subset of a much broader and significant system
Additional sampling has defined a mineralised, copper anomalous, shear zone extending
at least 2.5 km to the SE
Interpretation of aeromagnetic data suggests that this zone of structural geologic
disruption with potential mineralisation and hydrothermal alteration extends
approximately 6km to the SSW within the Yataga Igneous Complex
Drone LiDAR and photogrammetry works now complete with data processing underway
Geophysics survey (including pole dipole, IP, resistivity and MT) on target to commence
August-September 2024
Airborne aeromagnetic survey over Yataga Igneous Complex scheduled between July and
October
~$1.45 million total capital raising initiative completed comprising of:
- $250k placement to sophisticated and professional investors;
- 3:5 fully underwritten, non-renounceable rights Issue raising ~$1.2 million.
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
1
Georgetown Project
Located within the Georgetown mining district, the Georgetown Project is a richly endowed
but under-explored area of Far North Queensland with a history of significant mining activity
and mineral discoveries. EMU has the right to earn up to an 80% interest in 3 exploration
permits for minerals (EPM’s), covering 850km2 in the Georgetown mining district, Queensland,
under a Heads of Agreement and Joint Venture Agreement with Rugby Resources Ltd (TSXV:
RUG). The district has a substantial mineral endowment with more than 1,000 mines,
prospects and identified mineral occurrences.1
Fiery Creek Copper Prospect
The Fiery Creek Copper Prospect (FCCP) within the Georgetown Project in North Queensland
has been identified as a potential massive scale copper porphyry system.
The Fiery Creek Copper prospect is hosted within a major NNW striking shear zone developed
in the core of the Yataga Igneous Complex. The complex is a medium grained, equigranular,
ovoid, granodiorite body, which at ~29km2 is the largest such igneous body known in the
Georgetown Inlier. The prospect’s mineralised, hydrothermal alteration zone has been
identified to extend over an area of approximately 6km in strike and up to 2km wide. The
structure is characterised by multiple interleaved shear zones with quartz hosted copper vein
swarms, stockwork and disseminated copper at surface with petrographical studies indicating
several impulse phases of hydrothermal fluidisation. The alteration mineralogy, mineralisation
geochemistry and the areal extent of Fiery Creek copper and silver rich vein system suggests
the likelihood of a previously unknown sub adjacent porphyry system.
During the quarter the Company mobilised its highly experienced exploration team to site to
undertake extended geochemistry programs to further investigate and build upon this
potentially significant copper porphyry discovery.
1Queensland Department of Natural Resources GeoResGlobe Interactive Website,
“https://georesglobe.information.qld.gov.au/”
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
2
Figure 1. Georgetown Project Location
Activities Undertaken During the Quarter
Independent Geologist Assessment
EMU contracted Independent Consulting Economic Geologist and Fellow of the AusIMM and
AIG, Mr Nigel Maund, to assess the FCCP, with the scope of his assessment to include:
A comprehensive mineralogical investigation of the Fiery Creek vein samples2;
Review of EMU exploration data; and
An update to his interim report3
In his interim report earlier this year, Mr Maund suggested the Fiery Creek quartz, copper
oxide, sulphide vein array system appears to be developed within the cupolas of two possible,
closely spaced “pencil porphyry – type” mineralised systems.
Further research work undertaken by Mr Maund, relying on the updated EMU geologic
exploration database, has strengthened his view and interpretation of the system. Indeed,
2 ASX Release “Exploration Update Georgetown, Scale Potential Confirmed” 4 March 2024
3 An Interim Report – The Fiery Creek Copper Prospect, Georgetown Inlier, North Queensland - Nigel Maund MSc, DIC, MBA,
FAusIMM, FAIG, FSEG, FGS, MMSA, Consultant Economic Geologist, 31 January 2024
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
3
evidence of feldspar porphyry intrusive bodies and phreatic breccias and advanced argillic
alteration have been confirmed from Fiery Creek samples viewed under microscope.
Further details of Mr Maund’s geological report can be found in EMU ASX Announcement
30th April 2024, “Copper Porphyry Potential Grows at Georgetown Project”.
Geochemistry Survey Confirms Significant and Pervasive Copper Mineralisation
The portable XRF (pXRF) geochemistry field programme confirmed an extensive broad copper
mineralised zone, extending previously defined high-grade copper mineralisation. The zone,
which was tested by pXRF over soil, termite mound and rock chip sample mediums, covers an
area approximately 720m long x 480m wide.
27 rock chip samples were analysed with the highest copper grade recorded being 32.5%. (Full
results can be seen in Table 1, EMU ASX Announcement 4th June 2023, “Significant and
Pervasive Copper Mineralisation Discovery Confirmed by pXRF Geochemistry Survey at Fiery
Creek”).
Soil sampling was carried out over an 80m x 20m grid covering the area of the FCCP. Significant
copper grades up to 2,484ppm were recorded from pXRF soil samples whilst the highest
termite mound sample recorded 1,674ppm copper.
Soil samples recorded values between 100 and 2,484 ppm Cu with significantly anomalous
values being above 300 ppm, compared to values up to 32.5% returned from rock chip samples
taken from sub-crop and outcrop. The shear zone hosted mineralisation, within the initial
discovery area of the FCCP, varies from a width of 60 m to a maximum of 150 m over a sampled
strike length of 480 m.
Results indicate the mineralisation is significant and pervasive between outcropping highgrade copper veining and stockwork veining within the discovery zone and is interpreted to
be a subset of a much broader and significant system.
Samples from the program were dispatched to the laboratory for wet geochemistry testing to
confirm and correlate the pXRF in field results.
Additional sampling to the south-east of FCCP identified a substantial mineralised copper zone
which will be systematically soil sampled within the next quarter.
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
4
Figure 2. A summary geologic map of the Fiery Creek Copper Prospect (FCCP) discovery area showing
the location of original rock chip samples (diamonds) and the recently implemented soil sampling grid
and the handheld pXRF copper results given in ppm and coloured according to the legend on the
Figure. The white line shows the interpreted outline of the copper anomalous zone. The offsetting of
the mineralized zone shows the consistent right lateral (dextral) offsetting of the host FCCP zone.
EMU notes that exploration at FCCP is in its early days and multiple programmes are scheduled
for the coming months including:
Further grid-based soil sampling;
Detailed geologic mapping;
LiDAR & orthophotography drone survey data processing;
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
5
A ground pole dipole, IP resistivity and MT survey is scheduled for August-September;
and
Airborne aeromagnetic survey over Yataga Igneous Complex scheduled between July and
October.
Figure 3. Drone LIDAR, Photogrammetry Survey station at Fiery Creek Copper Prospect
In addition to the significant scale copper porphyry prospect EMU has identified at Fiery Creek,
the Company plans to follow up a number of other scale potential prospects, including the
epithermal bonanza style gold structures located at the Camp Oven Creek prospect, to the
West of FCCP.
This system is interpreted to be related to porphyry intrusions situated within the same
structural settings as Fiery Creek. Other prospects to be evaluated further include Dagworth,
Georgetown, Ancient Britton, Mistletoe, Munitions Creek, and Snake Creek.
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
6
Badja Gold/Tungsten/Lithium Project
EMU has continued to receive approaches from interested parties and is evaluating the
interest looking to realise maximum value for the asset either through sale or retention.
EMU’s work at Badja has defined and upgraded a multi-element project adding prospectivity
for high grade gold, tungsten and lithium.
EMU commissioned LBC Resources Pty Ltd to complete a review of all drilling assay results
from the total Badja project area in order to produce a geological model and compliant JORC
2012 Total Resources Estimate Report, for the Badja Project which included Gnows Nest,
Watertank Hill, Monte Cristo and Flying Emu deposits. Over 600 drill holes and 18,900 assay
values were analysed by LBC Resources Pty Ltd.
The current resources for the Badja Project mineralisation; classified as “Indicated” and
“Inferred”, are 555,637t @2.21g/t Au and 0.14%W for 39.4kOz Au and 757.3t W and are
summarised using a 0.5g/t gold cut-off. (See extracts from LBC Resources Pty Ltd “Resource
Estimate Report Badja Project”)4
Sunfire Project
EMU has no update on the Sunfire Project as it awaits direction from the WA Government as
to its intention to allow drilling activities in the old forestry workings in the State Forest. EMU
has not received any feedback from its correspondence most recently dated November 2022.
As previously stated, EMU has met all required environmental obligations with respect to
accessing WA State Forest areas within the project with the commencement of onsite
exploration activities. There continues to be a complete lack of progress coupled with the
absence of any indication from Government departments as to the likely probability of drilling
consent being forthcoming. This lack of progress and inability by the Government’s
departments to determine the viability of ongoing exploration and drill testing of the Sunfire
Ni-Cu targets has frustrated exploration that, in the opinion of EMU’s Directors, would have
been in the interest of the State of Western Australia and Australia as a whole.
4
ASX Release 4 March 2024” Exploration Update Georgetown, Scale Potential Confirmed”
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
7
Corporate
Capital Raising
In April the Company advised it had successfully completed a $250k placement and was to
undertake a fully underwritten 3:5 non-renounceable rights issues (Rights Issue) at $0.025 to
raise up to an additional ~$1.2 million (before costs).
The funds raised will assist with further exploration within the Georgetown Project QLD, with
a focus at the Fiery Creek Prospect, including advanced field work, geochemistry, geophysics,
potentially a short maiden drilling program, and general working capital.
Martin Place Securities Pty Ltd (MPS) was appointed as Lead Manager for the Placement and
fully underwritten Rights Issue.
Details of Capital Raise
Placement
EMU advised it had received firm commitments to place 10,000,000 fully paid ordinary shares
(New Shares) to sophisticated and professional investors raising $250,000 before costs. The
placement was conducted with 6,749,296 shares being issued within the Company ASX Listing
Rule 7.1A placement capacity and the balance of 3,250,704 shares within the Company’s
Listing Rule 7.1 placement capacity.
Non-Renounceable Rights Issue
The pro-rata non-renounceable rights issue to raise up to ~A$1.2 million from the issue of up
to ~48,005,533 new fully paid ordinary shares is fully underwritten by Martin Place Securities
Pty Limited.
Details of the Rights Issue:
The Rights Issue Offer, to be made pursuant to a transaction specific prospectus, was open
to all EMU shareholders on the register with an Australian or New Zealand address at 5.00
(pm) (WST) on 5 June 2024 (Record Date);
For every five (5) ordinary shares held at the Record Date, three (3) Fully Paid Shares were
to be offered, at an issue price of $0.025 each, a discount of 30.6% to EMU’s last closing
price and intended to reward Shareholders for their ongoing support;
Shareholders could apply for additional Fully Paid Shares above their entitlement under a
shortfall offer also made under the prospectus (Shortfall Offer);
Shortfall was allocated first by the Directors in priority to Shareholders, subject to
overriding Board discretion; and
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
8
The Offer was fully underwritten by MPS, who were paid a 2% (plus GST) fee on the Offer
amount and a 4% (plus GST) fee on Fully Paid Shares as allocated by MPS and issued under
the Shortfall Offer (but excluding Fully Paid Shares issued to Shareholders under the
Shortfall Offer).
Prospectus and Entitlement & Acceptance Form
A prospectus setting out details of the Offer was despatched to eligible Shareholders and a
copy can be viewed at EMU ASX Announcement 4th June 2024, “Prospectus”.
On 21st June the Company advised that it had extended the Rights Issue closing date to 3rd July
2024 to allow eligible shareholders who had not yet received entitlement documents under
the Prospectus to take part.
Rights Issue Allotment
Post quarter end, EMU advised that the Rights Issue had been strongly supported with Eligible
shareholders subscribing ~$842,447 for ~33,697,890 shares, taking up 70.2% of the total
shares offered under the Rights Issue.
Given the offer was fully underwritten by MPS, the remaining ~14,308,331 Shortfall shares
were placed to clients of MPS who were not on the register as at the offer record date.
The capital structure of EMU is now as follows:
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
9
Vale Terry Streeter
It was with great sadness that the Board of EMU advised of the sudden passing of Mr Terry
Streeter, Non-Executive Director of the Company.
Terry was a highly respected Board member for 6 years and imparted his wisdom and
experience with a deal of honesty. His friendship will be greatly missed. The Board extends
their deepest sympathy to Terry’s family, friends, and colleagues.
General Meeting
On 12th April, EMU held a General Meeting in which the Resolution to approve the
consolidation of the Company’s share capital was duly passed.
ASX Additional Information
EMU provides the following information pursuant to ASX Listing Rule requirements:
(a)
ASX Listing Rule 5.3.1 - Exploration and Evaluation Expenditure during the quarter
was $119k. Full details of exploration activities during the June quarter are set out in
this report;
(b)
ASX Listing Rule 5.3.2 - There was no substantive mining production or development
activity during the quarter;
(c)
ASX Listing Rule 5.3.3 – Details of mining tenements acquired or disposed of during
the quarter, and held at the end of the quarter, are set out in this report; and
(d)
ASX Listing Rule 5.3.5 - payment to related parties of the Company and their
associates during the quarter: $53k cash. The Company advises that this relates to
remuneration for services as directors (including statutory superannuation), and for
office rental paid to a director.
Authorised for release by the Board of Directors.
For further information, please contact:
Doug Grewar
Chief Executive Officer
EMU NL
info@emunl.com.au
www.emunl.com.au
info@emunl.com.au
Ben Creagh
Investor and Media Relations
NWR Communications
benc@nwrcommunications.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
10
Investors can sign into our interactive investor hub and join in on the conversation with Emu
NL.
https://investorhub.emunl.com.au/auth/signup
EMU Investorhub QR Code
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
11
EMU NL
COMPETENT PERSON’S STATEMENT
ABN 50 127 291 927
The information in this report that relates to exploration results is based
on, and fairly represents information and supporting documentation
prepared by compiled by Mr Nigel Maund, a Competent Person who is
consulting economic geologist. Mr Maund is a Fellow of the Australian
Institute of Geoscientists, a Fellow of the Australian Institute of Mining and
Metallurgy. Mr Maund is a consultant to EMU NL and has sufficient
experience in the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Maund consents to the inclusion herein of the matters based upon his
information in the form and context in which it appears.
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Post Consolidation Securities
Fully paid shares (listed)
FORWARD LOOKING STATEMENTS
124,879,187 (net of 620,000 the subject of the
ATM which EMU can buy back for nil
consideration)
Contributing Shares (listed)
1,349,586 paid to $0.90, $0.90 to pay
Contributing Shares (Unlisted)
1,166,670 paid to $0.003, $1.20 to pay, no call
before 31 December 2025
Options (unlisted)
5,748,454 options to acquire fully paid shares,
exercisable at $0.30 each, on or before
7 October 2024
10,579,167 options to acquire fully paid shares,
exercisable at $0.09 each, on or before
31 December 2026
Performance Rights (Unlisted)
1,619,051 performance rights in relation to
acquisition of Gnows Nest project (can be
repurchased for $20k if Gnows Nest disposed of
before 22.9.2025)
As a result of a variety of risks, uncertainties and other factors, actual events
and results may differ materially from any forward looking and other
statements herein not purporting to be of historical fact. Any statements
concerning mining reserves, resources and exploration results are forward
looking in that they involve estimates based on assumptions. Forward
looking statements are based on management’s beliefs, opinions, and
estimates as of the respective dates they are made. The Company does not
assume any obligation to update forward looking statements even where
beliefs, opinions and estimates change or should do so given changed
circumstances and developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new information or data that
materially affects the information included in the original market
announcements and, in the case of estimates of Mineral Resources, which
all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have
not materially changed. The Company confirms that the form and context in
which the Competent Person’s findings are presented have not
materially changed from the original market announcement.
Directors:
Peter Thomas
Non-Executive Chairman
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
M +61 419833604
E info@emunl.com.au
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
12
Table 3: Tenement Schedule (Status as at 30 June 2024)
Tenement ID
Project
Type
Description/ Status
M59/0739 – Gnows Nest
M59/0785 – Monte Cristo
E59/2315 – Gnows Nest
Badja
Badja
Badja
Mining
Mining
Exploration
EMU 100% - Granted
Application
EMU 100% - Granted -
P59/2068 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
P59/2071 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
P59/2072 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
P59/2073 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
P59/2074 – Monte Cristo
Badja
Prospect
EMU 100% - Granted
E59/2495 – Warramboo
Badja
Exploration
EMU 100% - Granted
E59/2817 - Warramboo
Badja
Exploration
EMU 100% - Pending
E70/5507 – Sunfire
Sunfire
Exploration
EMU 100% - Granted
E70/5346 – Sunfire
Sunfire
Exploration
EMU 100% - Granted
E70/6434 - Kent
Viper
Exploration
EMU 100%- Granted
E70/6436 - Kent
E59/2836 - Warrnambool
Viper
Badja
Exploration
Exploration
EMU 100% - Granted
EMU 100% - Granted
www.emunl.com.au
info@emunl.com.au
10 Walker Avenue
WEST PERTH WA 6005
ASX Code: EMU
ABN: 50 127 291 927
13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
EMU NL
ABN
Quarter ended (“current quarter”)
50 127 291 927
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 June 2024
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
(119)
(777)
(b) development
-
-
(c) production
-
-
(d) staff costs
(182)
(693)
(e) administration and corporate costs
(135)
(486)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
5
18
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(431)
(1,938)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
(58)
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
(58)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
250
1,112
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(54)
(107)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
196
1,005
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
393
1,149
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(431)
(1,938)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(58)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
196
1,005
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
158
158
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
94
71
5.2
Call deposits
57
317
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
Cash deposit held in US$
7
6
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
158
394
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
53
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
-
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(431)
8.4
Cash and cash equivalents at quarter end (item 4.6)
158
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
158
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.37
(431)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: EMU expects that it will continue to have negative operating cash flows as is usual
for mining exploration entities, but expenditures on discretionary exploration
expenses have been significantly curtailed and will be dependent on available cash
resources. The Company is continuing to rationalise its tenement holdings
consistent with its perception of market support/lack of support therefor.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: The Company conducted a non-renounceable rights issue which was successfully
completed post the end of the quarter and is continuing discussions in relation to
the possible trade sale of one or more tenements.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: EMU expects to be able to continue its operations and meet its business objectives
based on its responses to 8.8.1 and 8.8.2 above.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 July 2024
Authorised by: Doug Grewar - CEO
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
entity that wi