Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX RELEASE | ASX:EMU
31 July 2025
Quarterly Activity Report
Ended 30 June 2025
Headlines
Yataga, Qld, copper project preparation for maiden drilling programme.
Badja Gold Project – monetization options under assessment.
EGM voting results clearly support the incumber board.
Internal review uncovers privacy and contractual breaches.
EMU NL (ASX: EMU or “the Company”) presents its Quarterly Report (“Report”) for the period ended 30 June
2025 (“Period”).
Yataga Copper Project – Queensland (80% EMU, 20% Rugby Resources Ltd)
EMU made significant progress in planning exploration for Yataga whilst filling contractual, administrative and
regulatory lacunae to the point the project is now drill ready. This included comprehensive modelling, target
delineation, negotiating and securing access from the landowner, forming the joint venture committee,
addressing reporting deficiencies, calling for drilling tenders and putting in place statutory compliance
procedures and protocols.
The maiden campaign, planned for commencement this August, will focus on shear hosted mineralization
at Fiery Creek, for about 2,500m of reverse circulation (RC) drilling which, if successful, is likely to extend
into a program of up to 19,000m of RC drilling which will include infill at Fiery Creek and initial testing of
larger porphyry type targets at Yataga Valley.
The mineralization at the Yataga Copper Prospect is significant being hosted in a “plutonic-porphyry”
intrusive environment and having potential for very large scale. Locally, Porphyry associated deposits host
a number of commercially significant copper producers, particularly in the nearby Cloncurry area.
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Page 1
Background on the Yataga Copper Prospect
Figure 1. Georgetown Mining District.
Located within the Georgetown mining district
(Figure 1),and comprising part of Emu’s larger
Georgetown Project is the Yataga Copper
Prospect. The Georgetown Mining District is a
richly endowed but under-explored area of Far
North Queensland (Figure 1) The District has a
history of significant mining activity and
mineral discoveries hosting more than 1,000
mines, prospects and identified mineral
occurrences. The recently identified Yataga
Copper Prospect has an extensive
geochemical database demonstrating strong
copper anomalism over large areas of the
Yataga Igneous Complex, an intrusive granitoid
body with an area of approximately 70 km2
(Figure 2).
The Prospect lies within a circular magnetic
feature of the Permian-age, the Yataga
Intrusive Complex. Copper mineralisation
within this system has been previously
identified in high grade shear-related occurrences. Emu’s recent exploration indicates these structural
features (Figure 3) occur as late stage conduits within a broader fractionated granitoid complex with
porphyry-type mineralisation reminiscent of the Highland Valley Copper Mine (BC Canada).
Copper mineralisation has anomalous molybdenum (Mo) in the granite core and locally silver (Ag), bismuth
(Bi) and tellurium (Te) in the shear zones. This metal distribution (and other metals that include gold, lead,
zinc, arsenic and antinomy) broadly display zonation patterns outward from the granite core. The best
copper-mineralisation at surface is associated with the veins, shears and aplite dyke swarms at the Fiery
Creek and Yataga Valley prospects.
EMU’s sampling has demonstrated that copper mineralisation is distributed throughout the 70km 2 Yataga
Intrusive Complex. Mineralisation probably emanates from the central granitic core of the intrusion which has
an exposed area of 2.5km2 exhibiting miarolitic cavity-fill mineralisation of copper. The aplite areas have
copper veins as well as cavity-fill with copper values typically >200ppm. The granodiorite roof of the intrusion
has three prominent shear zones mapped with vein and disseminated copper mineralisation generally defined
by rock chip samples >2500ppm (0.25% Cu). The shear zones have prominent copper mineralised aplite dyke
swarms that are interpreted to extend to greater depth and connecting to the granitic copper-source. The depth
extensions have been interpreted from IP chargeability inversion models and are targets for drilling beyond the
maiden program outlined above.
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Page 2
Figure 2. Soil (termite mound) geochemical sample grid with copper heat map
showing the main prospects at Yataga Valley and Fiery Creek within the circularshaped Yataga Intrusive Complex .
Figure 3 Geology and structure of the Yataga Igneous Complex
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Page 3
Planned programme for 2025
The 2025 drilling program will initially test the economic
potential of the copper-silver mineralisation in the Fiery
Creek Prospect within the NNE and NNW orientated shear
zones which are found to contain abundant
mineralization at surface (Figure 4).
The programme will be based on reverse circulation
drilling with nominal drill hole depths of 160 metres. Drill
holes have been sited on the basis of geological
mapping, outcrop observation, and coincident
geochemical, geophysical anomalies.
The progress of the programme will be contingent upon
drilling results and will be extended as required. At the
completion of the planned holes a decision will be made
to continue drilling at Fiery Creek or to commence the
second phase of the programme on the significantly
larger anomalies at Yataga Valley (Figure 2).
Ongoing evaluation of nearby gold prospects will also be
undertaken as the greater Georgetown Project areas
hosts numerous gold occurrences (ASX announcement
7 Dec 2023)
Figure 4 Surface mineralization within the shear
Zones at Fiery Creek.
Badja Gold Project WA (EMU 100%)
The Badja Project is located in the Murchison region of Western Australia, 32km southeast of the township
of Yalgoo. The project covers an area of ~1472 ha encompassing numerous small historic gold mines and
prospects within 8 tenements which have been the subject of EMU exploration and assessment. The
project currently includes a resource estimated at 39,400oz of gold (EMU ASX release 30 January 2024)
with potential for expansion (ASX release 30 April 2025).
The Company has been evaluating the best options for monetizing the project by comparing development
options with potential joint venture or sale alternatives. EMU has received a number of purchase offers
but has not yet decided on any commercial outcome.
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Page 4
Corporate
Extraordinary meeting of shareholders
The meeting requisitioned by notice given by a group of certain shareholders pursuant to section 249D of the
Corporations Act, to remove Peter Thomas (Non-executive Chair) and Roland Bartsch (Non-executive Director)
and to appoint two new directors was held on 14 May. All four resolutions, which were determined by upon a
poll were rejected thus supporting the incumbents. That result was challenged before the Takeovers Panel by
a corporate shareholder (Wayburn) ostensibly not part of the group that requisitioned the meeting. Wayburn
has never declared itself to be associated with any of the requisitioning shareholders. It is to be noted that the
votes cast in respect of the shares issued in May 2025 made no difference to the result.
Roland Bartsch, one of the directors subject of the 249D removal motions, and having been appointed less
than two months before the s249D notice was given, resigned and was replaced by Oliver Douglas
(announcement 17 June 2025).
The Takeovers Panel issued certain orders (ASX announcement 11 July 2025) to, amongst other things,
reconvene the meeting to consider the removal of all directors and the appointment of another two with
supplemental orders impacting the substance of the notice of meeting and proxy form. Proceedings before the
Panel are continuing.
Private placement
EMU placed 17,647,059 fully paid ordinary shares at $0.017 per share to sophisticated and professional
investors to raise $300k (Announcement 14 May 2025). The issue was made under the Company’s existing
ASXLR 7.1A with funds raised for working capital and required for solvency reasons. The Takeovers Panel
has ordered that these shares cannot be voted at the reconvened extraordinary meeting of shareholders,
the date of which is still subject to finalisation.
Privacy breach
Internal investigations of policies and procedures uncovered a privacy breach emanating from parties
previously in the service of the Company and having access to the private information of shareholders. It is to
be emphasized that the breach was not with respect to any electronic information or infiltration of the
Company’s electronic or data systems. The breach was notified to the ASX on 9 May 2025 and affected
shareholders contacted.
The Company has taken all reasonable precautions to mitigate further breaches.
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Page 5
Health & Safety
No injuries or incidents were recorded at the Company’s projects or premises during the Period. The
Company commenced a review of all occupational health and safety protocols the outcomes of which are
being included in its Mine Management Safety plan for the Badja project (Western Australia) and
procedures manuals for operations at Georgetown (Queensland) before which planned work at those
projects could not commence.
Environment
No environmental incidents were recorded at the Company’s projects or premises during the Period.
Social and Heritage
EMU is committed to maintaining its social licence to operate by engaging positively with all stakeholders
affected by its activities.
Subsequent event
Subsequent to the end of the reporting period and also subsequent to orders made by the Takeovers Panel
on 10 July, the Takeovers Panel amended orders on 31 July 2025. Those amendments provide for EMU to
hold a further general meeting. Subject to there being no further orders or amendments, EMU must issue
the notice of meeting and proxy form, in a form acceptable to the Takeovers Panel, as soon as practicable
and by no later than 13 August 2025.
ASX Additional Information
EMU provides the following information pursuant to ASX Listing Rule requirements:
(a) ASX Listing Rule 5.3.1 - Exploration and Evaluation Expenditure during the quarter was
$125k. Full details of exploration activities during the March quarter are set out in this report;
(b) ASX Listing Rule 5.3.2 - There was no substantive mining production or development activity
during the quarter;
(c)
ASX Listing Rule 5.3.3 – Details of mining tenements acquired or disposed of during the quarter,
and held at the end of the quarter, are set out in this report; and
(d) ASX Listing Rule 5.3.5 - payment to related parties of the Company and their associates during
the quarter: $27k cash. The Company advises that this relates to remuneration for services as
directors (including statutory superannuation).
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Page 6
Authorised for release by the Board of Directors.
For further information, please contact:
Adrian Griffin
Ben Creagh
General Manager
Investor and Media Relations
EMU NL
NWR Communications
info@emunl.com.au
benc@nwrcommunications.com.au
Investors can sign into our interactive investor hub and join in on the
conversation with Emu NL.
https://investorhub.emunl.com.au/auth/signup EMU
Investorhub QR Code
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Page 7
EMU NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (Listed)
211,248,468 (including 6.5M the subject of a
Controlled Placement Agreement which EMU
can buy back for nil consideration)
Contributing Shares (Listed)
COMPETENT PERSON’S STATEMENT
The information in this report that relates to exploration results is
based on and fairly represents information and supporting
documentation prepared by Francisco Montes, a Competent Person
who is a Member of the Australian Institute of Geoscientists. Mr
Montes is a professional consultant to Emu NL and has sufficient
experience in the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Montes consents to the inclusion herein of the matters
based upon his information in the form and context in which it appears.
1,349,586 paid to $0.90, $0.90 to pay
FORWARD LOOKING STATEMENTS
Contributing Shares (Unlisted)
As a result of a variety of risks, uncertainties and other factors, actual
events and results may differ materially from any forward looking and
other statements herein not purporting to be of historical fact. Any
statements concerning mining reserves, resources and exploration
results are forward looking in that they involve estimates based on
assumptions. Forward looking statements are based on
management’s beliefs, opinions, and estimates as of the respective
dates they are made. The Company does not assume any obligation
to update forward looking statements even where beliefs, opinions
and estimates change or should do so given changed circumstances
and developments.
1,166,667 paid to $0.003, $1.20 to pay, no call
before 31 December 2025
Options (Unlisted)
3,400,000 options to acquire partly paid shares,
exercisable at $0.0001 each, on or before
30 October 2025
33,550,000 options to acquire fully paid shares,
exercisable at $0.10 each, on or before
31 October 2026
10,579,193 options to acquire fully paid shares,
exercisable at $0.09 each, on or before
31 December 2026
Performance Rights (Unlisted)
1,619,051 performance rights in relation to
acquisition of Gnows Nest project (can be
repurchased for $20k if Gnows Nest disposed of
before 22.9.2025)
Directors:
Peter Thomas
Non-Executive Chairman
Tim Staermose
Non-Executive Director
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new information or data that
materially affects the information included in the original market
announcements and, in the case of estimates of Mineral Resources,
which all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Person’s
findings are presented have not materially changed from the original
market announcement.
Oliver Douglas
Non-Executive Director
Investor enquiries:
E info@emunl.com.au
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Page 8
Tenement Schedule (Status as at 30 June 2025)
Tenement ID
Project
Type
Description/ Status
E59/2315 – Gnows Nest
Badja WA
Exploration
EMU 100% - Granted
E59/2495 – Warramboo
Badja WA
Exploration
EMU 100% - Granted
E59/2817 – Warramboo
Badja WA
Exploration
EMU 100% - Granted
E59/2836 – Warramboo
Badja WA
Exploration
EMU 100% - Granted
M59/739 – Gnows Nest
Badja WA
Mining
EMU 100% - Granted
M59/785 – Monte Cristo
Badja WA
Mining
EMU 100% - Granted
P59/2071 – Monte Cristo
Badja WA
Prospect
EMU 100% - Granted
P59/2073 – Monte Cristo
Badja WA
Prospect
EMU 100% - Granted
EPM 27667 – Fiery Creek
Georgetown QLD
Exploration
Emu earn-in JV
EPM 27664 - Georgetown
Georgetown QLD
Exploration
Emu earn-in JV
EPM 27642 – Perpendicular Peak
Georgetown QLD
Exploration
Emu earn-in JV
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
Page 1
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
EMU NL
ABN
Quarter ended (“current quarter”)
50 127 291 927
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 June 2025
Year to date
(12 months)
$A’000
Current quarter
$A’000
-
-
(125)
(1,526)
(b) development
-
-
(c) production
-
-
(d) staff costs
(99)
(385)
(e) administration and corporate costs
(493)
(966)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
22
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(714)
(2,855)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(33)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities-
-
(33)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
NOTE: The Takeovers Panel has
restricted the voting rights of shares
issued pursuant to the capital raising
effected in the June 2025 quarter.
300
3,067
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(149)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
300
2,918
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
602
158
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(714)
(2,855)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(33)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
300
2,918
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
188
188
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
142
43
5.2
Call deposits
39
552
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
Cash deposit held in US$
7
7
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
188
602
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
27
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(714)
8.4
Cash and cash equivalents at quarter end (item 4.6)
188
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
188
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.26
-
$A’000
(714)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: EMU expects that it will continue to have negative operating cash flows as is usual
for mining exploration entities, but expenditures on discretionary exploration
expenses have been significantly curtailed and will be dependent on available cash
resources. The Company is continuing to rationalise its tenement holdings
consistent with its perception of market support/lack of support therefor.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: EMU is working on a number of fund raising actions. Having regard to its record of
raising funds as and when required, EMU expects to raise funding. The Company
has also entered into a Controlled Placement Agreement with Acuity Capital (refer
Notice of Meeting for an AGM held 29.11.2024) which as yet has not been
activated. At the date of this report, a total of 6.5 million ASX:EMU shares could be
placed at market upon activation of the facility.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: EMU expects to be able to continue its operations and meet its business objectives
based on its responses to 8.8.1 and 8.8.2 above.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 July 2025
Authorised by: Rudolf Tieleman – Company Secretary
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5