Emu NL (EMU or the Company, ASX:EMU) is pleased to provide an update of current
exploration activities over its portfolio of nickel-copper-PGE and gold projects in Western
Australia.
Over the past 10 weeks, EMU’s geologists have been active in the field completing various new
and follow-up exploration activities. Multi-element assay results are pending from a new
extended soil geochemistry programme completed at the Badja Gold Project. Results are also
pending from the interpretation of data derived from Fixed Loop Electromagnetic (FLEM)
geophysical surveys currently being conducted at two nickel-copper-PGE projects (Viper and
Graceland).
EMU’s Viper, Graceland and Sunfire Nickel-Copper-PGE Projects are located within the
Southwest Terrane of Western Australia. The Terrane is host to Chalice Mining’s Julimar
Project, Venture Minerals/Chalice Mining’s Southwest Nickel-Copper-PGE Project (which
includes the Thor discovery), Newmont’s Boddington Gold Mine and Talison Lithium’s
Greenbushes Lithium-Tin-Tantalum Mine.
EMU’s Badja Gold Project is located in the Murchison Region near Yalgoo and within the same
greenstone belt hosting 29Metals’ Golden Grove Mine, Silver Lake Resources’ Deflector Mine
and Gascoyne Resources new Melville Project. The Badja Project hosts the historic Gnows Nest
Gold Mine and EMU’s recent Monte Cristo gold discovery.
Viper Nickel-Copper-PGE Project, Jerramungup, WA
Yesterday, EMU commenced a ground FLEM geophysical survey at its Viper Project. The survey
is designed to locate and interpret bedrock conductors beneath the interpreted 4km+ long
Proterozoic mafic dyke system which hosts the historic Netty Copper Mine. Both nickel and
copper anomalous zones associated with the east-west trending mafic dykes, were identified
during EMU’s auger geochemistry drilling programme conducted in Q1 2021.1
EMU’s geophysics contractor has commenced data collection for interpretation by consultants
Resource Potentials Pty Ltd. Any resultant electromagnetic bedrock conductors will provide
direct targets for initial drill testing.
See Figure 1 – Viper FLEM Geophysics Layout
1
See ASX News Release “Significant Copper Anomalism Defined at Viper Project”; 8 June 2021
EMU NL
10 Walker Avenue, West Perth, WA, 6005
T: +61 (08) 9226 4266
info@emunl.com.au
ABN 50 127 291 927
PO Box 112, West Perth, WA, 6872
ASX Code: EMU
www.emunl.com.au
Fig 1 – Location & Layout of the Viper project FLEM geophysics survey
Page 2 of 7
Graceland Nickel-Copper- PGE Project, Hyden, WA
Following the completion of the FLEM survey at Viper, EMU’s contractors will re-mobilise
120km north to the Graceland Project, situated in the WA Wheatbelt, 15km east of Pingaring
near Hyden. The FLEM survey is expected to commence on 30 January 2022 and will take
approximately 10 days to complete. EMU has identified anomalous nickel and copper zones
from auger geochemical drilling on the southern margins of a significant magnetic “bullseye”
geophysical feature.2
The EM survey will seek to identify bedrock conductors in advance of drill testing for the
presence of sulphide mineralisation. Data from the survey will be interpreted by Resource
Potentials during February 2022. EMU will update the market once this interpretation has been
completed.
See Figure 2 – Graceland FLEM Geophysics Layout
Sunfire Nickel-Copper-PGE Project, Bridgetown WA
The Sunfire Project lies immediately south-east, adjacent and abutting the Chalice
Mining/Venture Minerals Southwest Nickel Copper PGE JV Project. EMU has identified 3
prominent structural features which parallel the Thor discovery found within the adjoining JV
area.
Venture Minerals recently announced that Chalice Mining had interpreted a “Julimar lookalike”
immediately to the northwest along parallel structures with 13 conductors outlined from an
airborne geophysical survey. Chalice Mining further determined similar strength conductors to
those that yielded wide and significant palladium intervals during the early drilling phase of the
Julimar nickel-copper-PGE discovery (refer to ASX Announcement by VMS dated 6 December
2021 “Chalice Mining Completes 1st Stage JV on Julimar Lookalike Target”).
Historic surface geochemistry and drilling at Sunfire has identified significant zones of nickel
and copper anomalism. 3 EMU has planned a detailed soil geochemical survey over the
prospective lithologies followed by a FLEM survey over the areas of historical nickel anomalism
to determine if bedrock conductors are present.
EMU has scheduled the geophysical survey for mid-2022 following finalisation of the formal
administrative processes pursuant to the acquisition of the project tenements.
2
3
See ASX News Release “Letter to Shareholders”; 20 July 2021
See ASX News Release “Emu Secures Highly Prospective Portfolio in WA”; 20 September 2020
Page 3 of 7
Fig 2 – Location & Layout of the Graceland project FLEM geophysics survey
Page 4 of 7
Badja Gold Project, Yalgoo WA
EMU completed approximately 18,000m of RC drilling at the Badja Project during 2021. This
extended the known high-grade gold mineralisation at the historic Gnows Nest Gold Mine, led
to the discovery of the Monte Cristo lode and the interpreted extensions at the Water Tank Hill
prospect.4 EMU also completed induced polarisation (IP) geophysical surveys over the Gnows
Nest Mine and the southern area of the Badja Gold Project.
The second stage of an extensive soil geochemistry sampling programme was finalised in
December 2021 (see Figure 3). Multi-element assay results from the Stage 2 programme
totalling 808 samples are expected during February 2022. This programme was also designed
to corroborate the interpreted extensions of known mineralised zones as well as identify new
regional targets in untested areas.
Following the interpretation of the assay results, EMU is planning a follow-up RC drilling
programme. It is expected that the soil geochemistry results will provide strong vectors to
develop and extend the mineralised zones at the Gnows Nest Mine and Monte Cristo discovery.
Any significant anomalism associated with the regional targets will also be drill tested.
4
See ASX News Release “Drilling Update Badja Project”; 25 October 2021
Page 5 of 7
Fig 3 – Location and extent of the Badja project 2021 soil sampling programmes
RELEASE AUTHORISED BY THE BOARD
Contact Details: Doug Grewar - Mobile: 0419 833 604
Page 6 of 7
COMPETENT PERSON’S STATEMENT
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
549,814,484 (including 18.6m which
EMU can buy back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay,
no call before 31/12/2023
The information in this report that relates to exploration
results is based on, and fairly represents information
and supporting documentation prepared by Kurtis
Dunstone, a Competent Person who is a Member of the
Australian Institute of Geoscientists. Mr Dunstone is an
employee of Emu NL and has sufficient experience in
the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr Dunstone
consents to the inclusion herein of the matters based
upon his information in the form and context in which
it appears.
FORWARD LOOKING STATEMENTS
Terry Streeter
Non-Executive Director
As a result of a variety of risks, uncertainties and other
factors, actual events and results may differ materially
from any forward looking and other statements herein
not purporting to be of historical fact. Any statements
concerning mining reserves, resources and exploration
results are forward looking in that they involve
estimates based on assumptions. Forward looking
statements are based on management’s beliefs,
opinions and estimates as of the respective dates they
are made. The Company does not assume any
obligation to update forward looking statements even
where beliefs, opinions and estimates change or should
do so given changed circumstances and developments.
Gavin Rutherford
Non-Executive Director
NEW INFORMATION OR DATA
Options (unlisted)
33,320,000 options exercisable at $0.075
each, expiry 15/3/2023
Performance Rights (Unlisted)
48,571,429 performance rights in
relation to acquisition of Gnows Nest
project
Directors:
Peter Thomas
Non-Executive Chairman
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
M +61 419833604
E info@emunl.com.au
EMU confirms that it is not aware of any new
information or data that materially affects the
information included in the original market
announcements and, in the case of estimates of Mineral
Resources, which all material assumptions and technical
parameters underpinning the estimates in the relevant
market announcement continue to apply and have not
materially changed. The Company confirms that the
form and context in which the Competent Person’s
findings are presented have not materially changed
from the original market announcement.
-
END
-
EMU NL
10 Walker Avenue, West Perth, WA, 6005
T: +61 (08) 9226 4266
info@emunl.com.au
ABN 50 127 291 927
PO Box 112, West Perth, WA, 6872
ASX Code: EMU
www.emunl.com.au
Share your feedback
Discover