Drilling Intersects Copper Sulphides at Fiery Creek
Released
Released
Announcement PDF
1
ASX RELEASE | ASX:EMU
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
ASX Code: EMU
ABN: 50 127 291 927
18 December 2025
DRILLING INTERSECTS COPPER SULPHIDES AT FIERY CREEK
Emu NL (ASX: EMU or the Company) advises that its ongoing drilling program at the Fiery Creek
Prospect in North Queensland has intersected visible copper mineralisation.
Reverse Circulation (RC) drilling at the Fiery Creek prospect (see Photo 1) in North Queensland has
intersected visible primary copper sulphides including chalcopyrite (CuFeS2), bornite (Cu5FeS4), as well
as secondary Cuprite (Cu2O) in oxidised zones at depth.
An on-site portable XRF (Handheld Portable Mineral Element Analyser) unit is being utilised to assist
geologists in logging the RC chips and to confirm anomalous copper within visually identified
mineralised zones.
All 1m samples will be analysed for all elements, including copper and gold, from drillholes YFC002
(drill site P1005A) and YFC003 (drill site P1008), where copper sulphide minerals have been identified.
The samples have been submitted to Intertek Laboratories, and all remaining drillhole samples will be
dispatched in due course.
The objective of the drilling program was for the Company to complete 15 RC drill holes for a total of
2,500 m within the Fiery Creek prospect (Figure 1). To date, nine drill holes have been completed for
a total of 1,548m and drilling operations have progressed reasonably well to date. The following table
summarises the drilling completed to date:
Table 1: Summary of Drilling Program
Drillhole ID Drill Site ID Drilling Method Drilled (m)
YFC001 P1002 RC 192
YFC002 P1005 RC 192
YFC003 P1008 RC 174
YFC004 P1011 RC 192
YFC005 P1003 RC 174
YFC006 P1004 RC 150
YFC007 P1007 RC 174
YFC008 P1009 RC 114
YFC009 P1012 RC 186
Total 1,548
2
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
ASX Code: EMU
ABN: 50 127 291 927
The Company has identified opportunities to further optimise the drilling program to reduce the risk
of weather-related interruptions. To achieve this outcome, drilling operations have been transitioned
to a 24-hour roster to maximise metres completed during 2025. Drilling is expected to continue until
approximately 20 December 2025, before recommencing in early January 2026 weather permitting.
In addition, the Company has initiated planning to use the current drilling rig to complete a diamond
drill hole to target a mineralised zone identified in RC drill hole YFC002 (drill site number P1005). The
diamond drill hole is planned to be twinned alongside YFC002 and will target a zone of copper sulphide
mineralisation, with the objective of determining the lithology, structural controls, thickness and grade
of any mineralised zones associated with the Cataclastic – Mineralised Shear Zone (Figure 2).
Drilling is expected to be completed in January, at which time the Company will assess the results to
identify opportunities to further advance the geological understanding of the mineralised system at
Fiery Creek.
Peter Swiridiuk, Interim MD & CEO of EMU NL said:
"It is pleasing to visually see primary copper sulphides at depth beneath the enriched copper oxides
mapped at surface along NNW trending structures. While on-site, we intersected 7m of visible
chalcopyrite and pyrite at downhole 49m depth, coincident with near surface geophysical IP anomalies.
We will focus on completing as much RC drilling as possible from the 24-hour drilling currently in place.
A diamond drillhole, using the same drilling rig, is planned to be twinned on the 7m of visible copper
sulphide intersection.
Next steps include completing all planned 15 RC drillholes. The drilling will cease on, or about the 20th
December and re-commence on the 5th
January, weather permitting. Drilling optimisation procedures
have been put in place and samples from drillholes YFC002 (P1005A) and FC003 (P1008) have been sent
for analysis with initial assay results expected in the second half of January 2026. This maiden drilling
campaign will help determine grades of copper, gold and silver at depth and potential for
mineralisation extents."
3
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
ASX Code: EMU
ABN: 50 127 291 927
Photo 1: RC Drilling at the Fiery Creek Prospect
Photo 2: RC Drill Chips Showing Chalcopyrite from Drillhole 25YRC004 at 41-42m Depth
4
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
ASX Code: EMU
ABN: 50 127 291 927
Figure 1: Location of Drill Sites at Fiery Creek Prospect
5
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
ASX Code: EMU
ABN: 50 127 291 927
Figure 2: Idealised Geological Cross-Section at Fiery Creek Prospect
Investorhub link: https://emunl.com.au/link/y5aWKy
AUTHORISED FOR RELEASE BY THE BOARD
Contact Details: Peter Swiridiuk +61 (0) 411 643 199
E info@emunl.com.au
Investors can sign into our interactive investor hub and join in on the conversation with Emu NL.
https://investorhub.emunl.com.au/auth/signup
Competent Person Statement:
The information in this report that relates to Exploration Results and Mineral Resources is based upon and fairly represents
information compiled by or compiled under the supervision of Peter Swiridiuk - Member of the Aust. Inst. of Geoscientists. Peter
Swiridiuk is Interim Managing Director and CEO of Emu NL. Peter Swiridiuk has sufficient experience which is relevant to the type
of mineralisation and type of deposit under consideration to qualify as Competent Person as defined in the 2012 Edition of the
“Australasian Code of Reporting Exploration Results, Mineral Resources and Ore Resources”. Peter Swiridiuk consents to the
inclusion in the report of the matters based on the information in the form and context in which it appears. Additionally, Mr
Swiridiuk confirms that the entity is not aware of any new information or data that materially affects the information contained
in the ASX releases referred to in this report.
Share your feedback
Discover