Extensive High-Grade REE’s Over Multiple Kilometres
- Condingup Project, Esperance WA
9 October 2023
Assays of samples from the drilling announced recently 1 by EMU NL (ASX:EMU) (“EMU” or
“the Company”) confirm significant scale rare earth mineralisation with high values for TREO,
HREO and MREO2 at the 100% owned Condingup REE Project near Esperance WA.
The wide-spaced aircore drilling programme targeted deep clay traps and paleochannels,
interpreted from EMU’s passive seismic geophysics survey, returned significant TREO results up
to 2,513ppm over multiple kilometres and over wide drilling intervals. This proof-of-concept
drilling effectively demonstrated that substantial concentrations of REEs are hosted in the deeper
clay trap zones within the weathering profile overlying fresh host Booanya granites.
HIGHLIGHTS
Extensive high grade assay results recorded from standard 4m composite samples
up to 2,513pmm Total Rare Earth Oxides (TREO)
High value Magnetic Rare Earth Oxide (MREO) ratio to TREO of 21% (average for
drilling programme) extending to a maximum of 40.7% at Merivale Rd
Heavy Rare Earth (HREO) ratio of up to 53.08%
The aircore programme targeted only a minor portion of viable clay trap sites and
deeply weathered Booanya granites within the 1,560 square kilometre project,
indicating the vast scale of prospectivity available for further testing
First phase aircore drilling programme demonstrated continuity of grade and
thickness over multiple kilometres in the wide-spaced drill programme with
mineralised lenses running up 6-8kms in length
Anomalous grade >300ppm TREO values intersected in 33 of the 34 holes drilled
over significant intercepts up to a maximum 59m vertical drill intercept
High grade >750ppm TREO values intersected in 67% of holes drilled. Flat-lying REE
zones located in relatively shallow thick clay zones immediately above fresh granite
lithologies
1
ASX Release “Successful Maiden Drilling Programme Condingup REE Project” 18 September 2023
TREO=Total Rare Earth Oxides , MREO=Magnetic Rare Earth Oxides, HREO=Heavy Rare Earth Oxides
TREO = La2O3 + CeO2 + Pr6O11 + Nd2O3 + Sm2O3 + Eu2O3 + Gd2O3 + Tb4O7 + Dy2O3 + Ho2O3 + Er2O3 + Tm2O3 + Yb2O3
+ Lu2O3 + Y2O3
MREO = Nd2O3 + Pr6O11 + Tb4O7 + Dy2O3
%MREO = MREO/TREO
%HREO=HREO/TREO
2
ABN 50 127 291 927 | 10 Walker Avenue, West Perth, WA, 6005 | PO Box 1112, West
Perth, WA, 6872 E: info@emunl.com.au | www.emunl.com.au | ASX Code: EMU
Significant high-grade clay-hosted rare earth intersections include:
o 42m @ 1105ppm TREO (24.33% MREO) from 68m
o 28m @ 1092ppm TREO (23.28% MREO) from 72m
o 36m @ 1578ppm TREO (24.00% MREO) from 76m
o 32m @ 1151ppm TREO (22.20% MREO) from 80m
o 33m @ 1365ppm TREO (20.62% MREO) from 72m
o 16m @ 1050ppm TREO (22.14% MREO) from 108m
o 39m @ 920ppm TREO (23.97% MREO) from 72m
o 16m @ 947ppm TREO (26.11% MREO) from 44m
o 29m @ 1047ppm TREO (19.02% MREO) from 40m
o 38m @ 972ppm TREO (23.76% MREO) from 68m
o 8m
@ 2067ppm TREO (34.47% MREO) from 64m
Inc 4m @ 2513ppm TREO (34.53% MREO) from 64m
o 40m @ 1122ppm TREO (23.70% MREO) from 76m
(23CAC002)
(23CAC003)
(23CAC004)
(23CAC005)
(23CAC007)
(23CAC011)
(23CAC019)
(23CAC024)
(23CAC026)
(23CAC028)
(23CAC033)
(23CAC034)
The “proof of concept” roadside aircore drilling programme tested three main targets at KettlesParmango, Merivale and Baring Roads where interpreted bedrock mapping indicated deep clay
traps within the prospective Booanya Suite granitic intrusives. The three drill targets were tested
by continuous 4m composite sampling through the complete weathering profile from surface to
bedrock. Overall, the drilling tested only a very small proportion of the substantial 1,560 square
kilometre Condingup REE Project, leaving scope for multiple target areas remaining for follow-up
work (see Figure 1 – Drill Collar Location Plan).
Figure 1 –Drill Collar Plan showing positions relative to geology and Emu tenement boundaries
Page | 2
Results
The Condingup aircore drilling programme and mul element analysis of the sampling has
confirmed significant grades of REE mineralisa on over wide intercepts in this “first pass”
drilling programme designed to test the proof of concept.
The assay results returned anomalous grade >300ppm TREO values in 33 of the 34 holes
completed, demonstra ng the prospec vity of the region and the fer lity of the host rocks.
Consistent wide mineralised intercepts confirmed the Condingup REE Project as a project that
stands “head-to-head” alongside its peers in the emerging globally significant Esperance clay
hosted REE province.
The distribu on of anomalous REE elements generally occupy a variable but wide interval of
clays and saprolite immediately above the granite bedrock. The width of intercepts in the
ver cal drilling range up to 59m (Hole 23CAC019) and the lateral extensions of these “lenses”
reach at least 6-8km, which points to significant project prospec vity and economics.
See Long Sec ons for three target areas in Figures 2, 3 & 4
Figure 2 – Long Sec on NW to SE along Ke les Road drill line
Page | 3
Figure 3 - Long Sec on SW to NE along Parmango Road drill line
Figure 4 - Long Sec on W to E along Merivale Road drill line
Page | 4
Future Work
EMU has commenced a new phase of data review and project planning with a view to
extending the drill tes ng in new zones across the project por olio. It will also commence
steps to inves gate metallurgical proper es and model recoveries of REE from the clay host.
Given success of nearby peer explorers with this work already underway, EMU expects similar
success pathways.
EMU’s Condingup REE Project presents as a poten ally globally significant project for clay
hosted REE’s within the Esperance region which is emerging as a world-class REE province.
About the Condingup Rare Earth Project
EMU’s 100% owned Condingup Rare Earth Project is located just 35kms southeast of ASX:OD6’s
Splinter Rock Project. That project is achieving success in a similar geological se ng to EMU’s REE
enriched Booanya Suite granites.
EMU’s Condingup Project, accessible by sealed roads, is situated approximately 60kms from the
port of Esperance and essen al infrastructure. Esperance is widely projected to become a central
hub for major renewable energy and green hydrogen produc on and is located within a wellregarded explora on/mining friendly jurisdic on.
EMU’s 1,560 square kilometre Condingup Rare Earth Project contains significant exposures of the
Booanya Granite suite, which EMU’s explora on work has confirmed to be highly fer le for REE’s.
The current work has drill-tested a selec on of deeply weathered targets in what EMU considers
to be some of the most prospec ve clay-hosted enriched REE zones, clay traps and paleochannels
in the Esperance REE province.
Page | 5
Fig 5 – Regional Se ng of the Condingup REE Project located ~60km East of Esperance
RELEASE AUTHORISED BY THE BOARD
For further informa on, please contact:
Doug Grewar
Chief Execu ve Officer, Emu NL
info@emunl.com.au
Investors can sign into our interac ve investor hub and join in on the conversa on with Emu
NL (h ps://investorhub.emunl.com.au/auth/signup)
Page | 6
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
1,450,021,079 (including 18.6m the
subject of the ATM which EMU can buy
back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay,
no call before 31 December 2023
Contributing Shares (Unlisted)
35,000,000 paid to $0.0001, $0.04 to
pay, no call before 31 December 2025
Options (unlisted)
172,453,621 options to acquire fully paid
shares, exercisable at $0.01 each, on or
before 7 October 2024
Performance Rights (Unlisted)
48,571,429 performance rights in
relation to acquisition of Gnows Nest
project
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
M +61 419833604
E info@emunl.com.au
COMPETENT PERSON’S STATEMENT
The informa on in this report that relates to
explora on results is based on, and fairly represents
informa on and suppor ng documenta on prepared
by Francisco Montes, a Competent Person who is a
Member of the Australian Ins tute of Geoscien sts.
Mr Montes is an employee of EMU NL and has
sufficient experience in the ac vity which he is
undertaking to qualify as a Competent Person as
defined in the 2012 edi on of the “Australasian Code
for Repor ng of Explora on Results, Mineral Resources
and Ore Reserves”. Mr Montes consents to the
inclusion herein of the ma ers based upon his
informa on in the form and context in which it
appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertain es and other
factors, actual events and results may differ materially
from any forward looking and other statements herein
not purpor ng to be of historical fact. Any statements
concerning mining reserves, resources and explora on
results are forward looking in that they involve
es mates based on assump ons. Forward looking
statements are based on management’s beliefs,
opinions and es mates as of the respec ve dates they
are made. The Company does not assume any
obliga on to update forward looking statements even
where beliefs, opinions and es mates change or
should do so given changed circumstances and
developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new
informa on or data that materially affects the
informa on included in the original market
announcements and, in the case of es mates of
Mineral Resources, which all material assump ons and
technical parameters underpinning the es mates in
the relevant market announcement con nue to apply
and have not materially changed. The Company
confirms that the form and context in which the
Competent Person’s findings are presented have not
materially changed from the original market
announcement.
Page | 7
APPENDICES:
Table 1: Collar File - Condingup Aircore Drilling Campaign Aug-Sep 2023
Hole ID
Hole
Type
Easting
(m)
Northing
(m)
EOH
Depth (m)
Dip
(deg)
Az
(deg)
RL
(m)
Tenement
23CAC001
23CAC002
23CAC003
23CAC004
23CAC005
23CAC006
23CAC007
23CAC008
23CAC009
23CAC010
23CAC011
23CAC012
23CAC013
23CAC014
23CAC015
23CAC016
23CAC017
23CAC018
23CAC019
23CAC020
23CAC021
23CAC022
23CAC023
23CAC024
23CAC025
23CAC026
23CAC027
23CAC028
23CAC029
23CAC030
23CAC031
23CAC032
23CAC033
23CAC034
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
454184
455808
456215
457650
456596
456563
459415
462610
464320
466958
467590
465322
471332
472745
474487
454391
461861
461848
462004
463105
464958
466270
467115
460957
462093
463525
464123
465974
467372
520748
518267
518221
518220
518218
6258250
6258411
6259022
6254950
6257061
6258491
6258564
6258855
6259019
6259173
6259198
6256365
6259399
6259418
6259470
6268902
6266788
6268035
6269923
6270886
6272669
6273937
6274751
6275799
6274686
6273284
6272700
6270890
6269525
6265591
6265798
6263138
6262030
6260591
55
110
103
111
112
79
105
57
75
81
124
96
113
94
109
70
33
80
111
119
60
10
30
68
27
69
75
106
70
60
59
72
93
126
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
77
81
82
71
76
82
80
77
80
72
71
70
72
73
73
113
100
102
103
106
110
117
124
122
115
112
110
106
102
99
95
91
88
91
E 63/2277
E 63/2277
E 63/2277
E 63/2277
E 63/2277
E 63/2277
E 63/2277
E 63/2277
E 63/2277
E 63/2296
E 63/2296
E 63/2296
E 63/2296
E 63/2305
E 63/2305
E 63/2278
E 63/2305
E 63/2278
E 63/2278
E 63/2278
E 63/2278
E 63/2278
E 63/2295
E 63/2278
E 63/2278
E 63/2278
E 63/2278
E 63/2278
E 69/4116
E 69/4116
E 69/4116
E 69/4116
E 69/4116
E 69/4116
Page | 8
Table 2: Significant TREO Drilling Intercepts.
(All significant intercepts >300ppm TREO with “Inc” defining zones >750ppm TREO)
Hole ID
23CAC001
Inc.
23CAC002
Inc.
23CAC003
Inc.
23CAC004
Inc.
23CAC005
23CAC006
Inc.
23CAC007
Inc.
23CAC008
23CAC009
Inc.
23CAC010
Inc.
23CAC011
Inc.
23CAC012
Inc.
23CAC013
Inc.
23CAC014
23CAC015
23CAC016
Inc.
23CAC017
From
(m)
To
(m)
Interval
(m)
TREO
(ppm)
MREO
(%)
HREO
(%)
CREO
(%)
8
32
40
44
0
12
64
68
8
72
72
0
4
68
76
12
72
80
8
24
68
68
12
68
72
12
12
64
72
72
76
0
104
108
68
76
96
100
8
12
104
52
52
28
12
36
55
55
4
16
110
110
12
103
100
4
8
112
112
16
112
112
16
28
79
72
16
105
105
16
16
75
75
81
80
4
124
124
96
84
113
104
16
16
108
60
56
33
11
4
15
11
4
4
46
42
4
31
28
4
4
44
36
4
40
32
8
4
11
4
4
37
33
4
4
11
3
9
4
4
20
16
28
8
17
4
8
4
4
8
4
5
372.60
324.98
597.61
696.97
404.15
501.69
1062.45
1104.89
355.93
1064.23
1091.97
722.85
349.03
1354.99
1578.40
639.52
1010.92
1151.39
369.48
315.89
1157.19
1194.55
351.11
1273.03
1365.16
500.68
345.38
861.17
1970.89
716.00
880.15
320.84
987.44
1050.78
643.92
796.81
615.95
791.30
375.25
349.83
458.22
524.69
742.66
579.19
24.06
20.43
20.65
20.46
19.76
20.93
24.45
24.23
23.71
23.28
23.28
21.65
20.04
23.81
24.00
22.25
22.68
22.20
21.10
21.73
24.85
24.90
19.96
20.43
20.62
17.57
21.67
21.58
21.34
2.28
2.44
23.45
22.11
22.14
22.54
24.90
19.04
13.12
17.33
17.47
23.54
20.70
19.54
21.08
17.18
8.99
9.89
8.38
8.91
11.47
13.78
7.44
11.41
15.53
4.54
13.48
17.18
15.78
17.14
20.33
12.20
12.55
12.01
13.00
13.61
9.98
11.67
10.49
10.95
8.20
13.13
7.60
8.59
15.66
17.76
13.95
11.82
12.03
12.13
13.53
16.71
8.15
8.12
7.29
16.49
6.18
4.98
11.52
29.51
21.66
22.17
20.91
20.68
23.59
28.04
13.81
25.47
28.62
8.29
25.55
27.54
29.00
30.23
31.28
25.26
25.28
24.22
25.32
28.17
25.51
22.68
22.32
22.80
18.65
25.05
20.82
21.47
11.57
13.33
27.27
24.98
25.17
25.23
27.82
25.56
15.07
18.21
17.77
29.57
19.22
17.53
23.62
Page | 9
Hole ID
23CAC018
23CAC019
Inc.
23CAC020
Inc.
Inc.
23CAC021
23CAC022
Inc.
23CAC023
23CAC024
Inc.
23CAC025
23CAC026
Inc.
23CAC027
Inc.
23CAC028
Inc.
Inc.
Inc.
23CAC029
Inc.
Inc.
23CAC030
Inc.
23CAC031
23CAC032
23CAC033
Inc.
23CAC034
Inc.
From
(m)
To
(m)
Interval
(m)
TREO
(ppm)
MREO
(%)
HREO
(%)
CREO
(%)
0
8
52
76
0
52
72
60
72
76
92
12
4
8
16
24
44
24
24
40
40
16
28
44
60
64
0
12
48
12
52
68
16
40
44
56
40
56
40
52
Nil
0
64
64
72
76
4
16
56
80
4
111
111
68
119
80
116
60
10
10
20
69
60
25
28
69
69
24
32
48
75
75
4
28
106
16
60
106
32
70
52
64
52
60
48
59
4
8
4
4
4
59
39
8
47
4
27
28
6
2
4
45
16
1
4
29
29
8
4
4
15
11
4
16
58
4
8
38
16
30
8
8
12
4
8
7
341.77
558.49
343.34
321.83
379.22
771.93
920.17
510.43
736.31
895.75
865.71
452.54
518.29
922.24
346.91
668.62
947.19
724.47
439.65
826.89
1047.59
327.67
316.22
433.97
1445.03
1674.05
303.64
584.86
849.39
822.28
886.24
972.16
338.10
715.70
913.04
910.60
994.75
379.64
1228.81
474.74
24.86
18.44
15.04
9.26
21.13
23.92
23.97
24.66
23.92
26.44
23.40
13.11
22.83
23.65
21.37
24.52
26.11
23.07
18.05
21.08
19.02
23.94
19.72
23.15
24.62
24.29
25.57
23.99
23.75
24.23
24.39
23.76
38.99
44.01
25.34
22.75
25.52
24.70
27.32
8.93
15.99
30.89
4.46
2.22
16.22
13.14
14.45
10.12
11.73
10.66
12.21
7.91
10.50
8.83
10.43
9.00
6.47
12.15
7.89
8.89
8.74
10.72
22.08
9.31
13.53
14.55
17.57
12.36
12.05
11.07
9.97
12.70
22.18
32.15
24.98
18.12
12.55
24.56
13.00
8.05
29.59
37.40
14.14
8.32
27.26
27.33
28.44
25.36
26.33
27.26
26.35
15.24
24.44
23.81
23.25
24.60
24.00
25.90
18.74
21.89
20.32
25.06
31.36
23.64
28.22
28.76
31.94
26.53
26.34
25.86
25.10
26.87
44.90
55.07
35.59
29.49
27.78
36.03
29.48
11.59
4
80
72
126
116
4
16
8
54
40
343.34
1286.76
2066.96
1054.84
1122.06
22.11
28.17
34.47
23.20
23.70
16.51
33.37
35.28
11.66
10.49
27.89
44.72
50.19
25.44
24.97
Page | 10
JORC Code 2012 Edition Table 1:
Section 1 - Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as down
hole gamma sondes, or handheld XRF
instruments, etc). These examples should
not be taken as limiting the broad meaning
of sampling.
The sampling described in this
announcement was carried out on drill
samples collected from a conventional
aircore (AC) programme drilled by EMU in
the Condingup Project over the Aug-Sep
2023 period.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
All drill hole collar positions were located
in the field with a handheld Garmin GPS.
Sampling was carried out under Company
protocols and QAQC procedures as per
current industry practice. See further
details below.
AC holes were drilled with a variety of 3”
bits (75mm -78mm three blade and 4
blade Harlsan brand, “face-sampling” air
core blade bits) with 1m samples collected
through a cyclone directly into a
polyweave plastic bag for sample selection
and storage. Individual 1m sample weights
were found to be variable and typically
range between 8-12 kg. Samples were
collected with an aluminum scoop to
generate 2-3kg standard 4m composite
samples (or variable samples at EOH). The
2-3 kg composite samples were bagged
into prenumbered calico bags and
dispatched to LabWest Minerals Analysis
Pty Ltd in Malaga, Perth. Sample
preparation by the laboratory used
method PREP-01 (designed specifically for
soil, RAB and Aircore samples <3kg) and
included sample sorting, oven drying,
mechanical crush, split and pulverisation
to 75 microns. The analytical procedures
employed include multielement analysis
for whole rock and litho-geochemistry by
method MMA-04, a microwave assisted
four-acid digest (HF based total digestion)
with ICP-MS finish for a 62-element suite.
AC drilling was completed using a 3”
Harlsan “face sampling” blade drill bit,
completed by KTE Mining Services Pty Ltd.
Page | 11
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Sample recoveries are visually estimated
for each metre drilled, and sample
condition (dry, moist, wet) recorded in the
drill sample log sheets.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
No relationship between sample recovery
and grade can be ascertained from the
results at hand.
Geological logging was done on a visual
basis with parameters which include: rock
colour, grain size, lithology type,
weathering, and mineralogy.
Logging was based on individual
assessment of representative 1m sieved
samples. A rock chip library
(representative 1m samples in 20
compartment chip trays) was kept of all
drilling conducted.
All 4m composite samples were collected
using an aluminium scoop by
representative sampling from individual
1m samples in polyweave bags into a
composite 2-3kg sample in a prenumbered calico bag.
No sub-sampling was conducted at this
stage in the sampling process.
OREAS brand QA/QC certified reference
samples, blanks and field duplicates were
routinely inserted at a rate of 1 in 20 with
every batch submitted for assay.
The sample size is appropriate for the
mineralization style, application and
analytical techniques used.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
LabWest Minerals Analysis Pty Ltd provides
leading-edge REE analytical services to the
industry. Sample preparation
methodologies used in this programme
include the industry-standard sample
method PREP-01 (which includes sample
sorting, oven drying, mechanical crush,
Page | 12
Criteria
JORC Code explanation
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precision have been established.
Commentary
split and pulverisation to 75 microns).
Analytical techniques employed by
LabWest using microwave mixed-acid
method MMA-04, 62 element
determination including rare-earths using
a combination of ICP-MS and ICP-OES
finish.
Detection limits are appropriate for the
included results.
Geochemical Analysis of the RC samples
conducted by LabWest for multi-element
analysis (62elements suite) (MMA-04) was
used to assay for Ag (ppm), Al (ppm), As
(ppm), Ba (ppm), Be (ppm), Bi (ppm), Ca
(ppm), Cd (ppm), Ce (ppm), Co (ppm), Cr
(ppm), Cs (ppm), Cu (ppm), Dy (ppm), Er
(ppm), Eu (ppm), Fe (ppm), Ga (ppm), Gd
(ppm), Ge (ppm), Hf (ppm), Hg (ppm), Ho
(ppm), In (ppm), K (ppm), La (ppm), Li
(ppm), Lu (ppm), Mg (ppm), Mn (ppm), Mo
(ppm), Na (ppm), Nb (ppm), Nd (ppm), Ni
(ppm),, P (ppm), Pb (ppm), Pr (ppm), Pt
(ppb), Rb (ppm), Re (ppm), S (ppm), Sb
(ppm), Sc (ppm), Se (ppm), Sm (ppm), Sn
(ppm), Sr (ppm), Ta (ppm), Tb (ppm), Te
(ppm), Th (ppm), Ti (ppm), TI (ppm), Tm
(ppm), U (ppm), V (ppm), W (ppm), Y
(ppm),, Yb (ppm), Zn (ppm) and Zr (ppm)
The assay techniques employed, the
detection limits offered and the QA/QC
procedures in place are considered fully
appropriate for the programme
undertaken.
Verification
of sampling
and
assaying
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Assays are as reported from the laboratory
and stored in the company database,
managed by an independent database
consultant.
No in-house or independent verification of
results is possible at this juncture. Assay
results are expected in October 2023.
Field data was collected on site on a
company Toughbook (laptop computer)
and entered into a set of standard logging
templates.
Relevant individual rare-earth element
results were converted to stoichiometric
oxide using industry standard
stoichiometric conversion factors:
Page | 13
Criteria
JORC Code explanation
Commentary
Element
PPM
Ce
Dy
Er
Eu
Gd
Ho
La
Lu
Nd
Pr
Sm
Tb
Tm
Y
Yb
Oxide
Form
CeO2
Dy2O3
Er2O3
Eu2O3
Gd2O3
Ho2O3
La2O3
Lu2O3
Nd2O3
Pr6O11
Sm2O3
Tb4O7
Tm2O3
Y2O3
Yb2O3
Conversion
Factor
1.2284
1.1477
1.1435
1.1579
1.1526
1.1455
1.1728
1.1371
1.1664
1.2082
1.1596
1.1762
1.1421
1.2699
1.1387
Rare-Earth Oxide results were calculated using:
TREO (Total Rare Earth Oxide) = CeO2 +
Dy2O3 + Er2O3 + Eu2O3 + Gd2O3 + Ho2O3
+ La2O3 + Lu2O3 + Nd2O3 + Pr6O11 +
Sm2O3 + Tb4O7 + Tm2O3 + Y2O3 + Yb2O3
MREO (Magnet Rare Earth Oxide) = Dy2O3 +
Nd2O3 + Pr6O11 + Tb4O7
HREO (Heavy Rare Earth Oxide) = Dy2O3 +
Er2O3 + Gd2O3 + Ho2O3 + Lu2O3 + Tb4O7
+ Tm2O3 + Y2O3 + Yb2O3
CREO (Critical Rare Earth Oxide) = Dy2O3 +
Eu2O3 + Nd2O3 + Tb4O7 + Y2O3
Percent MREO (Magnetic) = MREO / TREO
Percent HREO (Heavy) = HREO / TREO
Percent CREO (Critical) = CREO / TREO
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Drill hole collars were located using a
handheld GPS system with an accuracy of
+/- 5m and stored in the company
database. All coordinates are referenced
to MGA Zone 51, Datum GDA94.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data
spacing
and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
EMU’s drilling as reported in this News
Release has variable spacing ranging from
400m to 4km. There are no historical
exploration drill holes from previous
exploration campaigns from which
inferences could be made for drilling in
Page | 14
Criteria
JORC Code explanation
Commentary
classifications applied.
the EMU targets.
Whether sample compositing has been
applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
All holes have been drilled vertically.
Drilling targets are clay horizons and
paleochannels within the granitic
weathering profile for which no angled
holes are required.
Sample
security
The measures taken to ensure sample
security.
Each composite 4m sample was placed
into a pre-numbered draw string calico
bag, securely tied off and placed into a
larger “polyweave” bag. Each polyweave
contained 5 calico bag samples and was
tied off with a zip tie. Samples were
transported by Esperance Freight Lines in
sealed bulker bags (capacity to 1000kg), on
wooden pallets and shipped directly to
LabWest Minerals Analysis Pty Ltd in
Malaga, Perth.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
No external audits have been performed
on the drill programme and sampling
methodology employed to date. In-house
(internal) reviews will be conducted once
assay results are returned and a full
assessment of the drilling campaign can be
made.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Sample compositing to a standard
maximum of 4m was used in all drilling
undertaken. Future 1m splits will be
assayed from the stored samples (all
individual 1m drill samples have been
stored for possible splits and/or
metallurgical testing).
Page | 15
JORC Code 2012 Edition Table 1:
Section 2 - Reporting of Exploration Reports
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The Condingup Project is held 100% by
Emu NL.
The project comprises a total of ten
granted tenements (see listing below):
E 63/2277
E 63/2278
E 63/2295
E 63/2296
E 63/2304
E 63/2305
E 63/2326
E 63/2342
E 69/4116
E 69/4146
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
All works undertaken and reported in this
ASX announcement were completed
within these tenements.
The project tenements are all in good
standing.
The EL’s are predominantly overly
freehold agricultural land used for crop
and livestock farming, with minor areas
overlying vacant Crown land.
The company has Native Title Land
Access Agreements in place.
Exploration
done by other
parties
Geology
Acknowledgment and appraisal of
exploration by other parties.
There has been no appraisal of rare-earth
element exploration by other parties.
Deposit type, geological setting and style
of mineralisation.
The project lies within the Eastern
Nornalup Zone of the northeastern
trending Albany-Fraser Orogen (the
Fraser Province). This Province extends
along the southeastern margins of the
Yilgarn Craton.
The principal geological unit of interest
and host to the REE bearing intrusive
plutons (Esperance Granite) are 12001100 Ma Amphibolite to Greenschist
facies metamorphic units that have
undergone a westward transport in
thrust sheets onto the Yilgarn Craton. The
rocks exhibit