Quarterly Activities Report
Released
Released
Announcement PDF
EMU NL
March 2021 QUARTERLY ACTIVITY REPORT
29 April 2021
SUMMARY
EMU commenced RC drilling programmes at Gnows Nest Gold Project, near
Yalgoo, WA
EMU announced high-grade gold intercepts from assays taken from maiden RC
drilling programme at both Monte Cristo Prospect and Gnows Nest
EMU commenced Auger drilling programmes at Viper, Graceland and 8 Mile
Dam Copper / Nickel and PGE prospects
EMU NL (“EMU” or “The Company”) completed significant drilling programmes during the
quarter at a number of its exploration projects. Following successful acquisitions in the
previous period, EMU immediately developed planning and activities to progress work at these
projects. In all, 10,932m of RC Drilling were completed at the Gnows Nest Gold Project whilst
1077m of auger drilling were completed at EMU’s Nickel Copper PGE projects (Table 1).
Table 1 - Drilling Statistics for Q1 2021
Project/ Prospect
Drilling
Type
No Holes
Drilled
Metres
Drilled (m)
Max Depth
(m)
Average
Depth (m)
Gnows Nest
RC
88
9166.0
196.0
104.6
Monte Cristo
RC
17
1766.0
130.0
103.9
Viper
Auger
158
323.5
5.0
2.0
Graceland
Auger
150
280.4
4.5
1.9
8 Mile Dam
Auger
143
473.5
18.0
3.3
RC Drilling Totals (m) =
105
10932.0
Auger Drilling Totals (m) =
451
1077.4
EXPLORATION DRILLING PROGRAMMES COMMENCED AND COMPLETED
AT GNOWS NEST AND MONTE CRISTO
Following the acquisitions of Gnows Nest Gold Project and the adjoining Monte Cristo Gold
Prospect near Yalgoo WA, in the latter half of 2020, EMU commenced an RC drilling
programme in January 2021. The initial programme included a budget for 9,000m of RC
drilling designed to verify historical drilling and test for extensions of the mineralised envelope
in each of the target areas. A total of 10,932m was drilled during the quarter represented by
9,166m at Gnows Nest and 1,766m at Monte Cristo Gold Prospect.
At Monte Cristo Gold Prospect, EMU sought to confirm and verify historic drill intercepts and
test for depth and strike extensions to the mineralised zone in this historical gold working.
EMU provisionally scheduled a RC drilling programme, at Gnows Nest Prospect, designed to
extend the known shallow mineralisation delineated in the 2018 and 2019 drilling campaigns
completed by Coruscant Minerals Pty Ltd. EMU’s programme was directed at increasing the
EMU NL
10 Walker Avenue, West Perth, WA, 6005
T: +61 (08) 9226 4266
info@emunl.com.au
ABN 50 127 291 927
PO Box 112, West Perth, WA, 6872
ASX Code: EMU
www.emunl.com.au
JORC 2012 Indicated and Inferred Resource of 113,400t at 3.78g/t Au for 13,777oz Au (See
ASX Announcement 28 September 2020 “Emu Secures Historic High Grade Gnows Nest Gold
Project WA”). EMU’s programme was designed to test strike and depth extensions of the lode
which remained open along strike to the North, South and at depth.
GNOWS NEST Prospect: Assay Results Confirmed High Grade Gold Mineralisation
Significant intercepts from the programme reported in ASX Announcement on 22 February
2021included:
4m at 20.40g/t gold from 51m including;
o 1m at 57.41g/t gold from 52m and
o 1m at 16.86g/t gold from 54m
4m at 18.32g/t gold from 95m including;
o 1m at 17.53g/t gold from 95m; and
o 1m at 51.66g/t gold from 96m
3m at 42.18g/t gold from 77m including;
o 1m at 89.57g/t gold from 78m; and
o 1m at 32.64g/t gold from 79m
2m at 26.88g/t gold from 60m including:
o 1m at 53.05g/t gold from 60m
6m at 6.42g/t gold from 116m including;
o 1m at 30.19g/t gold from 118m; and
1m at 47.12g/t gold from 63m
EMU completed drilling at Gnows Nest Prospect on 26 March 2021 and awaits assay results
from the programme.
MONTE CRISTO Gold Prospect: Assay Results Confirmed High Grade Gold
Mineralisation
Significant intercepts from the programme reported in ASX Announcement on 22 February
2021included:
3m at 13.35g/t gold from 67m including;
o 1m at 19.90g/t gold from 68m
6m at 6.51g/t gold from 120m including;
o 1m at 22.77g/t gold from 121
4m at 3.29g/t gold from 120m including;
o 1m at 5.97g/t gold from 121m
EMU completed drilling at Monte Cristo Prospect on 26 March 2021 and is awaiting assay
results from the programme.
Page 2 of 6
AUGER DRILLING PROGRAMMES COMMENCED AND COMPLETED AT
VIPER, GRACELAND AND 8 MILE DAM
EMU completed the field component of a first pass auger geochemistry sampling programme
at its WA Viper Project, near Jerramungup, Graceland Project near Hyden and its 8 Mile Dam
Project near Menzies. The programmes represented the first systematic geochemical sampling
ever completed in the target areas and were designed to test for low-level dispersions of copper,
nickel and platinum group element mineralisation. The drilling programme was completed
utilising a contractor-supplied 4-wheel drive mounted auger rig which had the capability of
drilling up to depths of 30m. The geologist-supervised programme completed approximately
150 holes in each project (see Table 1) on broad spaced lines. Rock chips and surface samples
were also collected during the programme.
VIPER Auger Drilling Programme
A total of 158 samples were collected over 10 lines with nominal spacing of 400m between
lines and 100m between samples for a total of 323 drilled metres over an area of approximately
6km2. Average depth of sample taken was approximately 2m. Sampling was conducted along
North-South lines at 400m spacings along the East-West trending Netty mafic dyke geological
feature over a total of 3.6km, centred at the historic high-grade Netty Copper Mine. The
samples are currently being assayed by ALS Laboratories utilising their analytical method MEMS41L (aqua regia digestion with super-trace ICP-MS analysis for a 53-element suite). During
the sampling, visible malachite (copper carbonate) was evident in mineralised areas associated
with the host granite and intrusive mafic lithologies.
GRACELAND Auger Drilling Programme
A total of 150 samples were taken over 10 lines with nominal spacings of 400m between lines
and 100m between auger collar positions for a total of 280 drilled metres over an area of
approximately 7km2. Average depth of sample taken was approximately 1.9m. The auger
sampling was conducted along East-West lines at 400m spacings designed to fully test the
North-South extending interpreted magnetic anomaly. The samples are currently being assayed
by ALS Laboratories utilising aqua regia digestion with super-trace ICP-MS analysis for a 53element suite.
8 MILE DAM Auger Drilling Programme
A total of 143 samples were taken over 3 lines with a spacing of 100m between auger collar
positions for a total of 473 drilled metres over an area of 28km2. Average depth of sample taken
was approximately 3.3m. The auger sampling was conducted along three East-West lines
(utilising existing roads wherever possible) and spaced between 3 and 5km apart targeting key
positions over the interpreted greenstone units under colluvial cover. Sampling lines were
established between 3 and 5 km apart and transverse East West over interpreted greenstone
undercover units. The samples are currently being assayed by ALS Laboratories utilising aqua
regia digestion with super-trace ICP-MS analysis for a 53-element suite.
Page 3 of 6
CORPORATE ACTIVITIES
Capital Raising
During the quarter, the Company completed a placement of 77,251,906 shares (New Shares)
to sophisticated and professional investors raising ~$3 million after costs, with the proceeds
being applied to assist with the final acquisition settlement of EMU’s Gnows Nest tenements,
progressing the Company’s exploration activities at its other West Australian projects and
funding its continuing working capital expenditures.
Applicants for New Shares were entitled to be issued with one (1) free option for every two (2)
New Shares applied for. These options (New Options) to subscribe for fully paid shares are
exercisable at fifteen ($0.15) each on or before 23 August 2021.
The New Shares were listed on ASX and rank equally with the existing fully paid ordinary
shares quoted as ASX:EMU.
The ASX Listing Rules permitted the making of the placement as follows:
1.
50,000,000 New Shares were issued as previously approved at the Company’s AGM
held on 30 November 2020;
2.
27,251,906 New Shares were issued under Listing Rule 7.1A; and
3.
the remaining 38,625,953 New Options were issued within its Listing Rule 7.1
placement capacity.
During the quarter, 84,355,000 unlisted options to acquire fully paid ordinary shares
(exercisable at $0.20 each) expired on 15 January 2021; 8,454,468 unlisted options to acquire
fully paid ordinary shares (exercisable at $0.20 each) expired on 16 January 2021, and 500,000
options exercisable at $0.15 each on or before 23 August 2021 were cancelled by agreement.
Shareholder approval of contracts and Notice of Meeting
ASX finally approved the issue of the notice to convene a general meeting of shareholders to
consider approving the issue of securities pursuant to the terms of the Avenger Projects and
Gnows Nest agreements (announced ASX on 28 September 2020). Relevant extensions to the
contract terms were secured.
ASX Additional Information
EMU provides the following information pursuant to ASX Listing Rule requirements:
1. ASX Listing Rule 5.3.1 - Exploration and Evaluation Expenditure during the quarter
was $174k. Full details of exploration activities during the March quarter are set out in
this report;
2. ASX Listing Rule 5.3.2 - There was no substantive mining production or development
activity during the quarter;
3. ASX Listing Rule 5.3.3 – Details of mining tenements acquired or disposed of during
the quarter, and held at the end of the quarter are set out in this report; and
4. ASX Listing Rule 5.3.5 - Payment to related parties of the Company and their associates
during the quarter: $53k cash. The Company advises that this relates to remuneration
for services as directors (including statutory superannuation), and for office rental paid
to a director.
Page 4 of 6
RELEASE AUTHORISED BY THE BOARD
Contact Details: Doug Grewar - Office: +61 8 9226 4266; Mobile: 0419 833 604
Table 2: Schedule of Tenements – Western Australia
Table 2 - Schedule of Tenements - Western Australia
Tenement ID
(DMIRS ID)
Emu
Project
Type
Description/ Status
E29/1080 – Marmion
8 Mile Dam
Exploration
EMU 100% - Granted
E59/2495 – Warramboo
Gnows Nest
Exploration
EMU 100% - Granted
E59/1735 – Gnows Nest
Gnows Nest
Exploration
EMU 100% - Granted - in process of being transferred
M59/739 – Gnows Nest
Gnows Nest
Mining
EMU 100% - Granted - in process of being transferred
M59/763 – Gnows Nest
Gnows Nest
Mining
EMU 100% - Application - in process of being transferred
P59/2068 – Monte
Cristo
P59/2071 – Gnows Nest
Gnows Nest
Exploration
EMU 100% - Granted - in process of being transferred
Gnows Nest
Exploration
EMU 100% - Granted - in process of being transferred
P59/2072 – Gnows Nest
Gnows Nest
Exploration
EMU 100% - Granted - in process of being transferred
P59/2073 – Gnows Nest
Gnows Nest
Exploration
EMU 100% - Granted – in process of being transferred
P59/2074 – Gnows Nest
Gnows Nest
Exploration
EMU 100% - Granted – in process of being transferred
E70/5146 - Graceland
Graceland
Exploration
EMU 100% - Granted – in process of being transferred
E70/5155 - Viper
Viper
Exploration
EMU 100% - Granted – in process of being transferred
E70/5507 – Sunfire
Sunfire
Exploration
E70/5602 – Kent
Viper
Exploration
EMU 100% - Application – in process of being
transferred
EMU 100% - Application
E70/5603 – Roe
Graceland
Exploration
EMU 100% - Application
Page 5 of 6
COMPETENT PERSON’S STATEMENT
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
433,657,342 (including 18.6m which EMU can
buy back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay, no call
before 31/12/2023
Options (unlisted)
38,125,953 options to acquire fully paid shares,
exercisable at $0.15 each, on or before
23 August 2021
22,000,000 options to acquire partly paid
shares, exercisable at $0.03 each, on or before
21 December 2021
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
T +61 8 9226 4266
M +61 419833604
E info@emunl.com.au
The information in this report that relates to
exploration results is based on, and fairly
represents
information
and
supporting
documentation prepared by Francisco Montes, a
Competent Person who is a Member of the
Australian Institute of Geoscientists. Mr Montes is
an employee of Emu NL and has sufficient
experience in the activity which he is undertaking
to qualify as a Competent Person as defined in the
2012 edition of the “Australasian Code for
Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Montes
consents to the inclusion herein of the matters
based upon his information in the form and context
in which it appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertainties and
other factors, actual events and results may differ
materially from any forward looking and other
statements herein not purporting to be of historical
fact. Any statements concerning mining reserves,
resources and exploration results are forward
looking in that they involve estimates based on
assumptions. Forward looking statements are
based on management’s beliefs, opinions and
estimates as of the respective dates they are made.
The Company does not assume any obligation to
update forward looking statements even where
beliefs, opinions and estimates change or should do
so
given
changed
circumstances
and
developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new
information or data that materially affects the
information included in the original market
announcements and, in the case of estimates of
Mineral Resources, which all material assumptions
and technical parameters underpinning the
estimates in the relevant market announcement
continue to apply and have not materially changed.
The Company confirms that the form and context
in which the Competent Person’s findings are
presented have not materially changed from the
original market announcement.
- END -
Page 6 of 6
Share your feedback
Discover