Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX RELEASE | ASX:EMU
30 January 2026
P a g e | 1
www.emunl.com.au || info@emunl.com.au || PO Box 1112, West Perth, WA, 6872 || ABN 50 127 291 927
Quarterly Activity Report - 31 December 2025
HIGHLIGHTS
Yataga Copper Project, Fiery Creek prospect maiden RC drilling programme commenced
with visible copper sulphide mineralisation recorded.
12 RC drillholes completed for 1978 m.
Initial drillholes have informed planning for a diamond drilling programme to commence at
Fiery Creek as soon as weather permits.
Preparations for a maiden drilling programme at the Yataga Valley prospect are underway
and is targeted to commence at the earliest opportunity in 2026
Historical gold results of up to 224g/t Au1
within the wider Georgetown Project prospects
are prioritising a renewed gold exploration focus with field programmes scheduled in
February 2026
Drilling vectors to be established at all gold prospects within the Georgetown Project area
during 2026 season
EMU NL (ASX: EMU or“the Company”) presents its Quarterly Report (“Report”) for the period ended
31 December 2025 (“Period”).
EMU is focused on advancing exploration activities, including drilling, across all three Georgetown
Project copper - gold tenements, following the commencement of its maiden drilling programme at
Fiery Creek in November 2025. The Company’s primary objective for 2026 is to complete the Fiery
Creek drilling programme and to commence drilling at the Yataga Valley prospect within the Yataga
Intrusive Complex.
Within the broader Yataga Intrusive Complex, the Yataga Valley prospect is recognised as a high-
priority target, defined by a regionally significant, structurally controlled corridor dominated by a
major shear zone that is largely concealed beneath colluvial cover. The geological interpretation
underpinning this target is supported by strong alignment between geology, geochemistry, and
geophysical datasets, which together consistently identify Yataga Valley as the highest-probability
domain for copper mineralisation. Importantly, Yataga Valley remains the Company’s principal
exploration focus and will be advanced in a methodical and technically robust manner. Planning and
executing a maiden drilling programme at Yataga Valley at the earliest opportunity in 2026 remains
the Company’s highest priority.
1
ASX Release 7 December 2023 “EMU records Gold Assays to 36.1g/t, Georgetown, Queensland”
ASX:EMU
P a g e | 2
STRATEGY AND FORWARD PROGRAM
EMU’s strategy is to establish the Georgetown Project as a district-scale copper - gold system
through disciplined, technically driven exploration focused on scale, structure and historical mineral
system understanding.
The Georgetown Mining District2
is one of Queensland’s most richly endowed yet under-explored
mineral provinces, hosting more than 1,000 recorded mines, prospects and mineral occurrences.
Historic mining and exploration confirm the presence of high-grade gold mineralisation, with surface
rock samples historically returning grades up to 224 g/t Au, and multiple occurrences exceeding 1
ounce per tonne gold, particularly at Camp Oven Creek, Turtle Arm, Quartz 130 and Sandy Creek.
Despite this endowment, the district has not been subjected to systematic modern exploration at
depth or at scale.
EMU’s current exploration focus reflects a deliberate strategy to exploit integrated system-scale
targeting, centred on the Yataga Intrusive Complex and its associated structural corridors. The
Company’s work to date demonstrates that copper mineralisation is distributed across the broader
intrusive system, with surface expressions at Fiery Creek and Yataga Valley representing structurally
focused zones within a much larger mineralised footprint. Geochemical zonation patterns, including
copper, gold, molybdenum, silver, bismuth and tellurium, are consistent with a fractionated intrusive
system with porphyry-style characteristics.
Importantly, historic and recent data indicate that gold mineralisation is not peripheral to the copper
system but is an integral component of the Georgetown mineral system. High-grade gold
occurrences are spatially associated with structural zones, breccias and vein systems that remain
largely untested at depth. EMU considers these gold occurrences to represent potential high-grade
vectors within a broader copper - gold system, rather than standalone targets.
The Company’s strategy over the next 12 - 18 months is therefore structured around three clear
priorities:
1. Advance the Yataga Valley prospect to a maiden drilling programme, targeting depth
extensions and structural conduits identified from geological, geochemical and geophysical
datasets.
2. Re-evaluate historic gold targets across the Georgetown tenements, prioritising areas with
documented high-grade gold results that coincide with major structures and intrusive
contacts, with the objective of defining drill-ready gold targets within the broader system.
3. Complete and interpret drilling at Fiery Creek, integrating RC and diamond drilling results
with geology, structure and geophysics to refine the mineral system model.
This approach is designed to move EMU beyond prospect-scale exploration and toward district
definition, where multiple copper and gold targets can be advanced in parallel within a coherent
geological framework. The Board and management view Georgetown as an excellent exploration
opportunity capable of delivering both scale and grade, underpinned by strong historic evidence and
2
Figure 3, Georgetown Mining District
ASX:EMU
P a g e | 3
modern exploration techniques. EMU remains fully focussed to execute this strategy and will
continue to update the market as drilling results are received, interpreted and incorporated into
geological and mineralisation models.
GEORGETOWN PROJECT (83% EMU, 17% RUGBY MINING PTY LTD)
The maiden drilling programme at the Fiery Creek prospect commenced in November 2025 and was
paused in late December due to poor weather, which prevented further drilling.
The objective of the drilling programme was to complete 15 drill holes for a total of 2,500 m within
the Fiery Creek prospect. To date, twelve drill holes have been completed for a total of 1,978 m and
drilling operations have progressed well to date (see Photo 1 and Table 1). The remaining drillholes
are expected to be completed in February, as soon as weather permits
Photo 1: RC Drilling at the Fiery Creek Prospect
Table 1: Fiery Creek Drill Hole Collars
Drillhole ID
Drilling
Method
Easting Northing
Dip/Azimuth
(Deg)
Depth (m)
YFC001 RC 774577 8007990 -550/900 192
YFC002 RC 774582 8007720 -500/640 192
YFC003 RC 774575 8007507 -500/780 174
YFC004 RC 774641 8007998 -510/830 192
YFC005 RC 774502 8007273 -520/830 174
YFC006 RC 774906 8007973 -500/2400 150
YFC007 RC 775012 8007741 -530/900 174
YFC008 RC 775074 8007517 -500/500 114
YFC009 RC 775192 8007262 -500/500 186
YFC010 RC 775295 8007155 -500/750 150
YFC011 RC 775541 8007164 -500/1000 130
YFC012 RC 775384 8007406 -500/700 150
Total 1,978
ASX:EMU
P a g e | 4
In addition, the Company has planned a targeted diamond drilling programme, which is scheduled
to commence as soon as weather permits on existing drill pads. Figure 1 shows the location of
completed drill holes.
Figure 1: Location of Drill Sites at Fiery Creek Prospect
Diamond drilling collars will be twinned alongside YFC002 and will target a zone of copper sulphide
mineralisation, with the objective of determining the lithology, structural controls, thickness and
grade of any mineralised zones associated with the Cataclastic – Mineralised Shear Zone (Figure 2).
Figure 2: Stylised Geological Cross-Section for Fiery Creek Prospect
ASX:EMU
P a g e | 5
Reverse Circulation (RC) drilling at the Fiery Creek prospect intersected visible primary copper
sulphides in 3 drill holes - YFC002, YFC003 and YFC004 (Figure 1).
The nature of mineral occurrence is disseminated, forming bands which are concordant along
structures mapped at surface in the host rock that appear to have been intersected at depth.
Minerals observed include chalcopyrite (CuFeS2), bornite (Cu5FeS4), as well as secondary Cuprite
(Cu2O) (Photo 2). The abundance of mineralisation for each interval is described in Table 2.
Photo 2: RC Drill Chips Showing Chalcopyrite from Drillhole 25YRC004 at 41-42 m Depth
Table 2: Summary of Visual Sulphide Intersections
Drillhole ID From (m) To (m)
Minerals
Observed
% Sulphides
Observed
Comments
YFC002 49 56
Chalcopyrite
Pyrite
4-6
Patchy chalcopyrite within quartz vein
material mixed with granodiorite
YFC003
43 45
Chalcopyrite
Pyrite
8
Fine grained disseminated chalcopyrite
associated with chlorite alteration
114 115
Cuprite
Bornite
1 Cuprite/bornite within a zone of alteration
YFC004 41 42
Chalcopyrite
Pyrite
1
Patchy chalcopyrite associated with
chlorite breccia
Note: ‘Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory
analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also
potentially provide no information regarding impurities or deleterious physical properties relevant to
valuations.’
All samples collected from drillholes YFC002 and YFC003 were dispatched to Intertek Laboratories
and are to be analysed for a full suite of elements, including copper and gold. The Company expects
to be in a position to report results from these drill holes in early late January or early February.
ASX:EMU
P a g e | 6
Remaining drillhole samples are expected to be dispatched, analysed and reported during the next
reporting period (expected to be during February).
YATAGA COPPER PROSPECT
Yataga Copper Project is located within the Georgetown mining district and is part of Emu’s
Georgetown Project (Figure 3). The Yataga Copper Project has an extensive geological, geochemical
and geophysical database demonstrating strong copper anomalism over large areas of the Yataga
Igneous Complex, an intrusive granitoid body with an area of approximately 70 km2
(Figure 4).
The Yataga Copper Project lies within a distinct circular shaped magnetic feature which defines the
Permian-age Yataga Intrusive Complex. Copper mineralisation within this system has been
previously identified in high-grade shear related occurrences. EMU’s recent exploration indicates
these structural features (Figure 5) occur as late-stage conduits within a broader fractionated
granitoid complex with porphyry-type mineralisation reminiscent of the Highland Valley Copper Mine
(BC Canada).
Copper mineralisation has anomalous molybdenum (Mo) in the granite core and locally silver (Ag),
bismuth (Bi) and tellurium (Te) in the shear zones. This metal distribution (and other metals that
include gold, lead, zinc, arsenic and antinomy) broadly display zonation patterns outward from the
granite core. The best copper-mineralisation at surface is associated with the veins, shears and
aplite dyke swarms at the Fiery Creek and Yataga Valley prospects.
EMU’s sampling has demonstrated that copper mineralisation is distributed throughout the 70km2
Yataga Intrusive Complex. Mineralisation probably emanates from the central granitic core of the
intrusion where depth extensions have been interpreted from IP chargeability inversion models and
are targets for drilling in 2026.
Figure 3: Georgetown Mining District
ASX:EMU
P a g e | 7
Figure 4: Soil (Termite Mound) Geochemical Sample Grid (with Copper Heat Map) Showing the
Main Prospects at Yataga Valley and Fiery Creek Within the Yataga Intrusive Complex
ASX:EMU
P a g e | 8
Figure 5: Yataga Project Showing both Fiery Creek and Yataga Valley Prospects
CORPORATE
Following the placement of 39,000,000 fully paid shares for ~$1.4 million, a maiden drilling
programme at the Fiery Creek prospect commenced in November 2025. The Company completed
12 drillholes for 1,978 m of RC drilling. Due to inclement weather, drilling was temporarily halted
before Christmas and will re-commence diamond drilling operations to complete the drilling
programme as planned.
Emu has previously announced (refer to ASX Announcement dated 24 November 2025) that it
initiated an investigation into a number of historical corporate transactions and other actions by EMU
from the period between November 2024 to October 2025. That investigation has since been
extended to include a review of the Company’s historical compliance with tenement reporting and
exploration activity obligations from approximately March 2025. The review will focus on identifying
deficiencies and provide recommendations to the Company to improve governance and compliance
activities on a forward basis.
The Takeovers Panel received an application from Mr. Oliver Douglas in relation to the a airs of Emu
NL (refer to ASX Announcement dated 24 November 2025 – Emu NL 06). The Takeovers Panel
ASX:EMU
P a g e | 9
declined to make a declaration of unacceptable circumstances in response to that application (refer
to ASX Announcement dated 15 December 2025 – Emu NL 06).
The Takeovers Panel made orders in respect of Emu NL 03 requiring Emu NL and its then former
directors Mr. Tim Staermose, Mr. Peter Thomas and Mr. Oliver Douglas to pay a portion of the fair and
reasonable costs incurred by the applicant in connection with the Emu NL 03 proceedings (refer to
ASX Announcement dated 4 December 2025).
On 20 November 2025, Mr. Adrian Gri in tendered his resignation as CEO of the Company. Mr. Peter
Swiridiuk has been acting as interim CEO since that time. The Company expects to make an
announcement concerning the appointment of a CEO in the next reporting period.
Health & Safety
No injuries or incidents were recorded at the Company’s projects or premises during the Period.
Environment
No environmental incidents were recorded at the Company’s projects or premises during the Period.
Social and Heritage
EMU is committed to maintaining its social licence to operate by engaging positively with all
stakeholders a ected by its activities.
ASX ADDITIONAL INFORMATION
EMU provides the following information pursuant to ASX Listing Rule requirements:
a. ASX Listing Rule5.3.1 - Exploration and Evaluation Expenditure during the quarter was $409k.
Full details of exploration activities during the December quarter are set out in this report;
b. ASX Listing Rule 5.3.2 - There was no substantive mining production or development activity
during the quarter;
c. ASX Listing Rule 5.3.3 – Details of mining tenements acquired or disposed of during the
quarter, and held at the end of the quarter, are set out in this report; and
d. ASX Listing Rule 5.3.5 - payment to related parties of the Company and their associates
during the quarter: $160k cash. The Company advises that this relates to remuneration for
services as directors (including statutory superannuation).
AUTHORISED FOR RELEASE BY THE BOARD
Contact Details:
Peter Swiridiuk: peter@emunl.com.au
e: info@emunl.com.au
Investors can sign into our interactive investor hub and join in on the conversation with Emu NL.
https://investorhub.emunl.com.au/auth/signup
ASX:EMU
P a g e | 10
Competent Person Statement:
The information in this report that relates to Exploration Results and Mineral Resources is based upon and fairly
represents information compiled by or compiled under the supervision of Peter Swiridiuk - Member of the Aust.
Inst. of Geoscientists. Peter Swiridiuk is Interim Managing Director and CEO of Emu NL. Peter Swiridiuk has
su icient experience which is relevant to the type of mineralisation and type of deposit under consideration to
qualify as Competent Person as defined in the 2012 Edition of the “Australasian Code of Reporting Exploration
Results, Mineral Resources and Ore Resources”. Peter Swiridiuk consents to the inclusion in the report of the
matters based on the information in the form and context in which it appears. Additionally, Mr Swiridiuk
confirms that the entity is not aware of any new information or data that materially a ects the information
contained in the ASX releases referred to in this report.
Table 3: Tenement Schedule (as at 31 December 2025)
Tenement Project Type Description/ Status
EPM 27667 -Fiery Creek Georgetown QLD Exploration Emuearn-inJV
EPM 27664 - Georgetown Georgetown QLD Exploration Emuearn-inJV
EPM27642-PerpendicularPeak Georgetown QLD Exploration Emuearn-inJV
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
EMU NL
ABN Quarter ended (“current quarter”)
50 127 291 927 31 December 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(409) (472)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (218) (427)
(e) administration and corporate costs (234) (496)
1.3 Dividends received (see note 3) - -
1.4 Interest received 13 13
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(848) (1,382)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation - -
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - 1,300
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities-
- 1,300
3. Cash flows from financing activities
1,404 1,995
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(72) (72)
3.5 Proceeds from borrowings - 200
3.6 Repayment of borrowings - (200)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
1,332 1,923
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,545 188
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(848) (1,382)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
- 1,300
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
1,332 1,923
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
2,029 2,029
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 258 1,522
5.2 Call deposits 1,771 23
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,029 1,545
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
160
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (848)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
-
8.3 Total relevant outgoings (item 8.1 + item 8.2) (848)
8.4 Cash and cash equivalents at quarter end (item 4.6) 2,029
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 2,029
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.39
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 30 January 2026
Authorised by: Rudolf Tieleman – Company Secretary
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.