MT MARMION DRILLING RESULTS
Released
Released
Announcement PDF
EMU NL ABN 50 127 291 927
MT MARMION DRILLING RESULTS
MT MARMION E30/462
Two reverse circulation drill holes were completed at Mt Marmion, 300km north of Southern
Cross, WA, testing two electromagnetic targets.
Hole #
Collar E (1)
Collar N (1)
Elevation m
Azimuth Dip
Depth m
RC1
773865
6747033
405
90o
60 o
180
RC2
774419
6748224
405
115 o
60 o
143
(1) UTM zone 50J
Both drill holes intersected pyrite and pyrrhotite mineralisation within a sequence of
amphibolite grade schists containing variable amounts of magnetite. The sulphide
intersections are sufficient to explain the electromagnetic targets.
No visible base or precious metal mineralisation was observed.
No gold assays > 0.1ppm were returned.
11th February 2015
For more information on the company visit www.emunl.com.au
1
EMU NL ABN 50 127 291 927
MT MARMION DRILLING RESULTS
Emu NL
ABN 50 127 291 927
ASX Code: EMU
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Issued Capital:
Shares - Quoted:
39,693,856 fully paid shares
35,652,856 contributing shares
Options – Unquoted:
82,736 exercisable at $0.4266
by 21.12.2015
Directors:
Peter Thomas
Chairman
Greg Steemson
Managing Director
Gavin Rutherford NonExecutive Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration
results, mineral resources and mineral reserves are based upon
information compiled by Mr. Greg Steemson, Managing
Director of Emu NL. Mr. Steemson is a Fellow of the
Australasian Institute of Mining and Metallurgy (FAusIMM)
and has sufficient experience in the activity which he is
undertaking to qualify as a Competent Person as defined in
the 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”
(JORC Code). Mr. Steemson consents to the inclusion in the
report of the matters based upon his information in the form
and context in which it appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning
the projects owned by Emu NL. Statements concerning
mining reserves and resources may also be deemed to be
forward looking statements in that they involve estimates
based on specific assumptions. Forward-looking statements
are not statements of historical fact and actual events and
results may differ materially from those described in the
forward looking statements as a result of a variety of risks,
uncertainties and other factors. Forward looking statements
are based on management’s beliefs, opinions and estimates as
of the dates the forward looking statements are made and no
obligation is assumed to update forward looking statements if
these beliefs, opinions and estimates should change or to
reflect other future developments.
2
JORC Code, 2012 Edition – Table 1 report, EMU NL
RC Results February 2015
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Samples were collected in 1 metre
intervals via a sample splitter
system attached to the drill rig
which delivered two samples of
approximately 25kg and 3kg. The
3kg samples were then subsampled to make up 4m composite
samples each weighing
approximately 3kg for analysis.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
The laboratory pulverized the
whole sample then sub-sampled
25g for fire assay.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would be
relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where
there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Reverse circulation drilling using a
face sampling hammer.
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
RC cuttings were recovered using a
cyclone attached to the drill rig.
Measures taken to maximise sample
recovery and ensure representative nature of
the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining studies
and metallurgical studies.
RC chips were geologically logged
and magnetic susceptibility
measurements recorded.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
The RC samples were split using a
rotary splitter attached to the drill
rig to produce a sample for each
1m drilled and then sub-sampled to
make up 4m composites for assay.
The material for the 4m composites
was collected by inserting a trowel
the length of the bag containing the
1m sample and collecting that
material into a separate bag.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data and
laboratory tests
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
The 4m composites were asaayed
using a 25g charge for fire assay.
This method was chosen as the
samples contained sulphides and
quartz.
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
Verification of
sampling and
assaying
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precision have been established.
The laboratory used standards and
blanks as part of the QA/QC
The verification of significant intersections
by either independent or alternative
company personnel.
The holes drilled were exploration
holes testing two electromagnetic
anomalies.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
The hole collars were established
using hand held GPS instruments
and are accurate to +/- 3m.
Specification of the grid system used. s
Quality and adequacy of topographic
control.
Data spacing
Data spacing for reporting of Exploration
and distribution Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Orientation of
data in relation
to geological
Whether sample compositing has been
applied.
The RC chips were composited into
4m composites for assay.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
Yes
structure
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Sample security The measures taken to ensure sample
security.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
No
A company director was on site for
the duration of the program and
personally delivered the samples to
the laboratory.
None done
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
E30/462 is 100% owned by Emu
NL. The work undertaken was
located on UCL.
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Exploration
done by other
parties
Acknowledgment and appraisal of
exploration by other parties.
The airborne EM data was collected
by Emu Nickel NL.
Geology
Deposit type, geological setting and style
of mineralisation.
Drill hole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
The sulphide bodies are located
within a greenstone sequence
consisting amphibolite facies
schists.
RC1 UTM coordinates
773865E/6747033N
Zone 50J
Elevation 405m
Azimuth 090 degrees
Dip 60 degrees
Hole length 180m
easting and northing of the drill hole
collar
elevation or RL (Reduced Level –
elevation above sea level in metres) of the
drill hole collar
dip and azimuth of the holes down hole
length and interception dept s hole length.
RC2 UTM coordinates
774419E/6748224M
Zone 50J
Elevation 405m
Azimuth 115 degrees
Dip 60 degrees
Hole length 143m
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques, maximum
and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades
are usually Material and should be stated.
N/A
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg ‘down
hole length, true width not known’).
Diagrams
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
No significant precious or base
metal mineralisation intersected
discovery being reported. These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
N/A
Other
substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk samples
– size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
The intersections are sufficient to
explain the electromagnetic
responses
Further work
The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
None planned
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
Share your feedback
Discover