Elevado Programme Update
Released
Released
Announcement PDF
ELEVADO PROGRAMME UPDATE
13 January 2020
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
298,005,436 (including 15.7m which EMU
can buy back for nil consideration)
Contributing Shares (listed)
33,725,496 paid to $0.03, $0.03 to pay, no
call before 31/12/2023
Options (unlisted)
6,000,000 options to acquire partly paid
shares, exercisable at $0.03 each, on or
before 28 February 2020
65,759,750 options to acquire partly paid
shares, exercisable at $0.02 each, on or
before 21 December 2020
84,355,000 options to acquire fully paid
shares, exercisable at $0.20 each, on or
before 15 January 2021
8,454,468 options to acquire fully paid
shares, exercisable at $0.20 each, on or
before 16 January 2021
12,000,000 options to acquire partly paid
shares, exercisable at $0.02 each, on or
before 21 December 2021
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
The Elevado Project drilling programme and project wide
“regional” exploration is now well underway with the
completion of the diamond-drilling stage of the
schedule. In comparison to past summer campaigns,
EMU is well ahead having established a camp,
commenced the regional exploration programme and
finalised Stage 1 of the drilling programme before the end
of the calendar year.
The preparation and effort by the teams on site have paid
off and EMU is on track to finalise the planned
programme well before the onset of the off-season. This
will allow EMU flexibility to extend activities in the
current season if warranted.
Stage 1 Drilling (Diamond Drilling)
Emu successfully completed its HQ-size diamond core
drilling programme with single holes into each of two
geological/structural/geophysical targets along sections
5300N (Vidalita prospect) and 7300N (North-East Plains
prospect). The holes were drilled to 428m and 400m
respectively testing targets identified during the project
evaluation stage in the 2019 winter review process.
Each of the IP targets occupy favourable structural
positions within brecciated Miocene age volcanosedimentary units. Target positions display strong
sulphide (pyrite) content in fine disseminations and
veinlets and alteration assemblages are predominantly
Intermediate Argillic (IA).
All core has been photographed, geologically logged
and ½-core samples despatched to ALS Copiapo for
preparation and then analyses by ALS Lima. Assay
results are expected before the end of January 2020.
WWW.EMUNL.COM.AU • ASX: EMU • ABN: 50 127 291 927
ELEVADO PROGRAMME UPDATE
13 January 2020
Regional Exploration
EMU’s regional exploration programme, targeting the entire Elevado tenement package and
environs, has been highly effective and successful.
The Elevado concessions have been covered with a comprehensive, high density stream
sediment sampling programme, quadbike prospecting traverses, rock chip sampling and
reconnaissance mapping. This work tested all known prospective areas and delineated new
mineralised occurrences along previously untested positions.
All stream sediment samples have been processed by ALS Copiapo, and final gold and multielement assay results are awaited. Follow-up prospecting in each of the anomalous catchments
will commence in the second half of January.
The exploration campaign, using a quad bike, to rapidly and safely access remote and difficultaccess positions, has been an invaluable asset to the programme. The terrain lends itself to this
mode of transport and the quad bike has opened numerous areas previously inaccessible other
than by foot.
Reconnaissance mapping and target evaluation of areas delineated for the prospecting work has
been largely completed, with geological and mineralisation models defined for most areas. The
remaining samples from the project-wide first-pass exploration campaign will be delivered to
ALS Copiapo by mid-month.
Overall, the regional exploration programme constitutes a systematic and measured approach
to quickly defining significant mineralisation within EMU’s exploration and mining concession
land package. More importantly, the results of this work will prioritise the most prospective
targets for drill testing in coming months.
EMU is very pleased to report the discovery of a structural breccia zone with Advanced Argillic
(AA) and vuggy silica alteration extending over a 2000m x 350m zone christened the Jotahues
Norte prospect. This will be targeted in the Stage 2 RC Drilling Programme; during January –
February.
Prospecting work at the Arroyo Ancho prospect defined drill targets over an area largely
covered by post-mineral andesitic flows. Prospective silica-alunite altered volcaniclastics that
occur within small outcrop windows and interpreted structural positions will be targeted in the
Stage 2 RC Programme.
Stage 2 Drilling (Reverse Circulation)
The style of new targets established during the present regional exploration programme has indicated
the need for reverse circulation (RC) drilling. Previously, EMU utilised aircore (AC) drilling to great
effect, predominantly within the Vidalita prospect. However, the new target-styles suggest
advantages will accrue with the use of a conventional approach and RC drilling contractor. Unlike
the relatively shallow, soft-rock AC-technique, RC is expected to achieve the required penetration
and drilling depth where more competent rock types are apparent in the surface expression of some
of the Stage 2 RC Programme targets. For this reason, a suitable RC rig will be mobilised to complete
the second-stage drilling during January-February.
This programme will test targets within the Vidalita, Peon, Arroyo Ancho, Jotahues and Jotahues
Norte prosects, as well as possible new targets yet to be identified with vectors obtained from the
stream sediment sample assay results that are nearing completion. Figure 1 shows the position of
completed diamond core holes and target zones for the upcoming RC-drilling programme.
WWW.EMUNL.COM.AU • ASX: EMU • ABN: 50 127 291 927
ELEVADO PROGRAMME UPDATE
13 January 2020
Camp and Logistics Support
The camp infrastructure and logistics support at Elevado this season have been first class and an
improvement on past campaigns. The facilities and equipment employed by EMU’s camp and
logistics contractors have ensured a seamless support system for our drilling and exploration
activities. The programme is scheduled to be completed at the end of March. The timeframe gives
EMU the flexibility, if required, to extend its activities in the programme to conduct further
exploration and drilling.
Elevado Camp 2020, Maricunga Chile
WWW.EMUNL.COM.AU • ASX: EMU • ABN: 50 127 291 927
ELEVADO PROGRAMME UPDATE
13 January 2020
Fig 1. – Schematic representation of Elevado Project targets
Investor enquiries
Doug Grewar
M: 0419 833 604
E: info@emunl.com.au
WWW.EMUNL.COM.AU • ASX: EMU • ABN: 50 127 291 927
Share your feedback
Discover