RESPONSE TO ASX – JORC Compliance Query
In reference to your letter to Emu NL (EMU or the Company) dated 20 April 2020, we
set out below our response to each of the questions using the same numbering as used
in your letter:
1. An Annexure is attached which includes details and results of the diamond and
RC drilling programmes at the Elevado Project referred to in the Company’s
announcement lodged with ASX on 17 March 2020;
2. EMU confirms that it is in compliance with Listing Rule 3.1 and that there is no
information about its financial condition that should be given to ASX in
accordance with that rule that has not already been released to the market; and
3. EMU confirms that the responses above have been authorised and approved by
the EMU Board.
Yours faithfully
[Sent electronically with approval but without signature]
Damien Kelly
Company Secretary
10 Walker Avenue, West Perth, WA 6005
PO Box 1112, West Perth, WA 6872
T +61 8 9226 4266, E info@emunl.com.au, www.emunl.com.au
ANNEXURE
Results from Drilling Programme 2019/2020 Elevado Project
The following table, (Table 1) outlines the parameters of the holes drilled in the Elevado Project during
the 2019/2020 season. As reported in the ASX Announcement (Shareholders Letter 17 March 2020), the
assay results obtained from this season’s drilling, indicate no significant gold intercepts for reporting
purposes, with 0.2 parts per million (ppm) gold set as the threshold for significant gold assay return.
Table 1 – Table of Drill Hole Information
Summary of 2019-2020 Elevado Drill Campaign Collar Information
Hole No
Prospect
Collar E
WGS84 z19S
Collar N
WGS84 z19S
Collar
RL
Az
Dip
Start
Depth
Final
Depth
Metres
Drilled
Diamond Drilling Nov-Dec 2019 (Synergy Drilling)
5300-17
530017A
7300-2
Vidalita
492700
6935300
4880
270
-55
0.00
167.70
167.70
Vidalita
Vidalita
492700
494063
6935300
6937323
4880
4816
270
270
-55
-60
168.00
428.00
0.00
400.00
Total DD Drilling =
260.00
400.00
827.70
270
90
0
0
180
180
240
0
-60
-60
-90
-70
-60
-60
-70
-90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
104.00
208.00
190.00
155.00
195.00
204.00
72.00
210.00
104.00
208.00
190.00
155.00
195.00
204.00
72.00
210.00
Total RC Drilling =
1338.00
Total Drilling =
2165.70
Reverse Circulation Drilling Jan-Feb 2020 (R. Munoz Perforaciones)
PNRC001
JHRC005
JHRC001
JNRC004
JNRC005
JNRC006
5700-5
AARC001
Peon
Jotahues
Jotahues
Jotahues Norte
Jotahues Norte
Jotahues Norte
Vidalita
Arroyo Ancho
485585
483668
483778
483261
483235
483248
492302
493866
6936448
6940599
6941609
6943226
6943381
6943519
6935698
6946262
4773
4648
4654
4527
4512
4498
4886
5000
COMPETENT PERSON’S STATEMENT
Any details contained herein that pertain to exploration results, mineral resources or mineral reserves are based
upon information compiled by Mr Francisco Montes, Senior Geologist and Exploration Manager - Chile, of Emu NL.
Mr Montes is a Member of the Australasian Institute of Geoscientists and has sufficient experience in the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Montes consents to the
inclusion herein of the matters based upon his information in the form and context in which it appears.
Appendix 1
JORC Code, 2012 Edition – Table 1 report, EMU NL
Elevado Drilling
Section 1 Sampling Techniques and Data
Criteria
Sampling techniques
Commentary
Diamond Drill (DD) samples: Samples are collected in core trays for logging and
transport. Sample intervals are nominally 2m or 4m (geology dependent) and cut in half
lengthwise on a diamond core saw. Samples placed in pre-numbered plastic bags and
delivered to assay laboratory.
Reverse Circulation (RC) samples: Samples are collected from each 1m of drill hole by
the drill contractor and riffle split from the total sample. The sample is usually around
1.5kg representing ~10% of the mass of the 1m drilling interval. Samples are placed in
calico bags and laid out in rows of 20 samples together with the remaining (coarse
reject) sample. The 2m or 4m composite sample is prepared by Emu technicians,
extracting 500g from each 1m drilling interval using electronic scales. Composite
samples are bagged for lab dispatch and stored separately. The 1m samples are stored in
Emu’s Copiapo warehouse for future check-assaying purposes.
All samples were dispatched to ALS Laboratories, with sample preparation completed in
Copiapo Chile, and assays in Lima Peru.
Preparation by modified method PREP-31, dried at 105oC, crushed to 70% <2mm, 1kg
riffle split and pulverised 85% <75um.
Gold assays by conventional 30g fire assays ICP-AES finish utilising method Au-IPC21.
Multi-element assays by four acid digest, ICP-MS finish for a 48-element suite utilising
method ME-MS61m. Mercury is treated as an additional element under a separate
procedure.
Drilling techniques
DD drilling using HQ (63.5mm) bit size, standard tube. Hole surveyed by Boart Longyear
TruShot survey tool. Holes not orientated.
RC drilling using conventional hammer and bit, plus 5 3/8” tricone through clay-rich
intervals.
Drill sample recovery
Geological team makes a qualitative estimate (as good, moderate or poor) of sample
recovery for each 1m of RC down hole sample interval. Core recoveries are calculated for
each sample run in DD drilling.
Supervising geologist ensures that representative chip samples are collected during RC
drilling for future reference purposes.
Sampling is considered to be unbiased.
Logging
Alteration, mineralisation, rock type, and structure, where evident, are logged and
recorded from the core drill samples.
Chips from the RC drilling are stored in plastic chip trays for reference purposes.
Similarly, half core from the DD drilling is stored in trays for future reference.
Total hole length is logged.
Sub-sampling
techniques and sample
preparation
RC samples (cuttings) from each 1m of drill hole are collected, with the sample (usually
1.0-1.5kg) collected via riffle splitter. The composite sample preparation is completed
on-site using electronic scales with 500g taken from each 1m sample.
DD drilling core is cut in half lengthwise and one half sent for analysis.
Sample preparation including drying, crushing, splitting and pulverisation is handled by
standard laboratory procedures.
Sub-sampling at the sample processing facility is done using splitters.
The samples collected are representative of the in-situ material.
Sample sizes are appropriate to the grain size of the material being sampled.
Quality of assay data
and laboratory tests
DD drilling samples in nominal 2m or 4m composites. Pulps prepared in ALS Copiapo for
analysis in ALS Lima.
A 30g split from each DD or RC sample is analysed for gold by conventional 30g fire
assay/ ICP-AES finish (method Au-ICP21). Multielement assays by four acid digest/ICPMS finish (method ME-MS61m) utilising a 0.75g sample split. Mercury is handled by a
separate procedure.
All samples assayed for gold (1 ppb detection limit) and a suite of 48 elements multielement (trace level) plus mercury.
The four-acid digest is considered appropriate given the programme type and the altered
nature of the rocks.
Laboratory geochemical standards and blanks are used for QA/QC purposes. OREASbrand epithermal suite standards and quartz blanks inserted 1:20 samples.
Verification of
sampling and assaying
No independent verification has been undertaken at this time.
No twinned holes have been drilled.
All geological and geochemical data is loaded into databases managed by Emu personnel
for verification, plotting and archiving purposes.
Assay data are not adjusted.
Location of data points
Drill hole collars for the 2019/2020 campaign were located using handheld GPS accurate
to < 5m. The usual follow-up DGPS surveys accurate to <0.02m were not deemed
necessary and not completed.
WGS 84 UTM zone 19J (south) grid system.
Topographic control is deemed adequate at this stage of the exploration program.
Data spacing and
distribution
The drill holes are irregularly spaced (but generally >100m) as they are testing
geological, geophysical or geochemical targets.
No mineral resources are being reported at this time.
The RC samples are composited into 2m or 4m composites on-site using electronic
scales.
Orientation of data in
relation to geological
structure
Drill hole azimuth was planned on indications of outcrop and/or subcrop geology and
lithological strike as indicated by a ground magnetic survey and geologic mapping.
Sample security
Emu management supervises sample collection on-site and delivery to the laboratory.
Audits or reviews
None undertaken.
Drilling orientation along east-west sections is considered appropriate in view of the
north-south trending controlling structure. No bias has been introduced.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral tenement and
land tenure status
Commentary
During the field campaign period, Emu had an interest in 51 concessions comprising the
Elevado project.
Of these:
(i)
15 are granted exploration concessions that were applied for by Emu in its
own right (Tierra 1-15 concessions). These concessions will now be
dropped.
(ii)
30 are concessions acquired by Emu from Chilean company BLC SpA via
the exercising of an option to purchase agreement. These include Peon 116 + Ciclope Tuerto 1-9 + Vidalota A-E. These concessions will now be
dropped.
(iii)
6 are concessions the subject of an option to purchase agreement with
Chilean company Prospex SpA (Vidalita A-E concessions). These
concessions will be returned to the title holders.
Of these, the 6 Prospex concessions (Vidalita A-E) and 2 BLC concessions (Vidalota A, B)
are in the process of conversion to mining concessions; and
The original 5 concessions in the BLC agreement (Ciclope Tuerto 7,8,9 and Vidalota A,B),
plus 6 concessions in the Prospex agreement (Vidalita A-F), are subject to a 5km Area of
Interest (AOI) from their respective boundaries. To the extent concessions fall within
the AOI, they are subject to a 1% NSR whilst concessions Vidalita A-F are subject to a
further 1% NSR.
The option may be exercised at any time before November 2022 on payment of US$2.5M.
Emu is also required to pay US$100k for each year it extends the option from November
2019 to November 2022. If, on the concessions the subject of the BLC and Prospex
options, Emu defines a: (i) 0.5Moz of gold in measured resources, 5M ordinary shares
will be issued; and (ii) 1Moz of gold in measured resources, a further 5M ordinary shares
will be issued.
Notification for termination of this option has been given to the title holders.
Exploration done by
other parties
Previous work was limited to rock sampling. There had been no drilling in the area prior
to Emu’s activities.
Geology
The prospect area is located within the early to late Miocene volcanics of the Maricunga
Belt. The project is a green fields exploration project however the mineralisation style
intersected in drilling is interpreted to be similar to known high sulphidation epithermal
style ore deposits in the same geological setting. Rocks consist of volcanically derived
lithologies, including tuffs, andesites, dacites, polymictic and monomictic breccias, and
minor sedimentary facies. Major north-north-west trending faults may control the extent
of mineralisation and provide the bounds to that mineralisation. Lesser cross-cutting
faults, generally north-easterly, appear to affect mineralisation plunge and repetitions.
Drill hole Information
Refer Table 1.
Data aggregation
methods
Simple averages are calculated from mineralised zones.
Gold zones above 0.2ppm are aggregated within the mineralised zones to calculate
average gold intersections. Barren zones less than one sample interval may be included
in a composite aggregation if occurring within the overall mineralised zone.
Relationship between
mineralisation widths
and intercept lengths
Project is at an early stage of exploration and any conclusions at this stage would be
speculation. All widths quoted are down hole intersection widths.
Diagrams
No interpretive cross sections have been included in this announcement (although
sections have been included in previous announcements).
Balanced reporting
Emu considers all pertinent information pertaining to this prospect is supplied in either
this or previous announcements.
Other substantive
exploration data
No new substantive exploration data is considered meaningful and material.
Further work
No further work is planned at the Elevado project.
Detailed exploration data including satellite imagery, soil and rock chip geochemistry in
regional exploration and drill hole data in prospect work has been provided in previous
releases.
20 April 2020
Reference: 15904
Mr Damien Kelly
Company Secretary
Emu NL
By email
Dear Mr Kelly
Emu NL (‘EMU’): JORC compliance query
ASX refers to the following:
A. EMU’s announcement entitled ‘Fully Funded 2019/20 Elevado Programme Kicks Off’ lodged on the ASX
Market Announcements Platform (‘MAP’) and released at 9:58 AM on 8 November 2019, disclosing, among
other things, the commencement of a diamond drilling programme at the Elevado Project.
B. EMU’s announcement entitled ‘Elevado Programme Update’ lodged on MAP and released at 9:47 AM on
19 November 2019, disclosing, among other things, that the drilling rig had arrived at the Elevado Project
and that the rig was being mobilised to the first drill pad.
C. EMU’s announcement entitled ‘Elevado Programme Update’ lodged on MAP and released at 9:02 AM on
27 November 2019, disclosing, among other things, that the drill programme at the Elevado Project was well
underway.
D. EMU’s announcement entitled ‘Elevado Project Update’ lodged on MAP and released at 9:40 AM on
13 January 2020, disclosing, among other things the completion of the diamond drilling stage of the Elevado
Project drilling programme and foreshadowed the commencement of the reverse cycle drilling stage of the
programme for January – February 2020.
E. EMU’s announcement entitled ‘Letter to Shareholders’ lodged on MAP and released at 7:30 AM on
17 April 2020, disclosing, among other things, that assays from this season’s diamond and RC drilling
programmes at the Elevado Project have failed to produce results sufficiently significant to justify any further
follow up (the ‘Announcement’).
F.
ASX Listing Rule 5.6 states:
5.6
Subject to rule 5.10, a public report prepared by an +entity must be prepared in accordance with
rules 5.7 to 5.24 if applicable and Appendix 5A (JORC Code) if applicable if the report includes a
statement relating to any of the following.
•
+Exploration targets.
•
+Exploration results.
•
+Mineral resources or +ore reserves.
•
+Production targets.
G. Clause 5 of the JORC Code states:
5.
Table 1 provides a checklist or reference of criteria to be considered by the Competent Person in
developing their documentation and in preparing the Public Report.
ASX Limited [[Listings]]
ASX Customer Service Centre 131 279 | asx.com.au
In the context of complying with the principles of the Code, comments relating to the items in the
relevant sections of Table 1 should be provided on an ‘if not, why not’ basis within the Competent
Person’s documentation. Additionally comments related to the relevant sections of Table 1 must be
complied with on an ‘if not, why not’ basis within Public Reporting for significant projects (see
Appendix 1 Generic Terms and Equivalents) when reporting Exploration Results, Mineral Resources
or Ore Reserves for the first time. Table 1 also applies in instances where these items have materially
changed from when they were last Publicly Reported. Reporting on an ‘if not, why not’ basis is to
ensure that it is clear to an investor whether items have been considered and deemed of low
consequence or are not yet addressed or resolved.
ASX Listing Rule 5.7, which states:
5.7
An +entity publicly reporting in relation to a +material mining project, either:
(a) +exploration results for the first time; or
(b) any new +exploration results,
must include all of the following information in a market announcement and give it to ASX for
release to the market.
5.7.1
As an appendix to the market announcement, a separate report providing all information
that is material to understanding the +exploration results, in relation to each of the
criteria in section 1 (sampling techniques and data) and section 2 (reporting of
exploration results) of Table 1 in Appendix 5A (JORC Code). An +entity that determines
that one or more of those criteria is not material for this purpose must identify each such
criterion and explain why it has determined that it is not material to understanding the
+exploration results.
5.7.2
As an appendix to the market announcement, a separate table setting out the following
information for material drill-holes unless the +entity determines that the information is
not material:
•
easting and northing of the drill-hole collar;
•
elevation or RL of the drill-hole collar;
•
dip and azimuth of the hole;
•
down hole width and depth; and
•
end of hole.
An +entity that determines that a drill-hole table setting out the information described
above is not material, is not required to attach the table to the market announcement
but must explain why it has determined that the table is not material to understanding
the +exploration results.
6
ASX confirms the JORC Code applies to the Announcement.
Request for Information
Having regard to the above, ASX asks EMU to respond separately to each of the following questions and requests
for information:
1. Please provide details in a form suitable for release to the market, details and results of the diamond and RC
drilling programmes at the Elevado Project referred to in the Announcement. The response by EMU should
comply with Listing Rule 5.7.
2/4
ASX Customer Service Centre 131 279 | asx.com.au
2. Please confirm that EMU is in compliance with the Listing Rules and, in particular, Listing Rule 3.1.
3. Please confirm that EMU ‘s responses to the above have been authorised an approved in accordance with its
published continuous disclosure policy or otherwise by its board or an officer of EMU with delegated authority
from the board to respond to ASX on disclosure matters.
When and where to send your response
This request is made under Listing Rule 18.7. Your response is required as soon as reasonably possible and, in any
event, by no later than 7:30 AM AWST Wednesday, 22 April 2020. You should note that if the information
requested by this letter is information required to be given to ASX under Listing Rule 3.1 and it does not fall within
the exceptions mentioned in Listing Rule 3.1A, EMU’s obligation is to disclose the information “immediately”. This
may require the information to be disclosed before the deadline set out in the previous paragraph and may require
EMU to request a trading halt immediately.
Trading Halt
If you wish to request a trading halt, you must tell us:
•
the reasons for the trading halt;
•
how long you want the trading halt to last;
•
the event you expect to happen that will end the trading halt;
•
that you are not aware of any reason why the trading halt should not be granted; and
•
any other information necessary to inform the market about the trading halt, or that we ask for.
We require the request for a trading halt to be in writing. The trading halt cannot extend past the commencement
of normal trading on the second day after the day on which it is granted.
You can find further information about trading halts in Guidance Note 16 Trading Halts & Voluntary Suspensions.
ASX reserves the right to release a copy of this letter and your response on the ASX Market Announcements
Platform under Listing Rule 18.7A. Accordingly, your response should be in a form suitable for release to the
market.
Your response should be sent to me by e-mail at ListingsCompliancePerth@asx.com.au. It should not be sent
directly to the ASX Market Announcements Office. This is to allow me to review your response to confirm that it
is in a form appropriate for release to the market, before it is published on the ASX Market Announcements
Platform.
Listing Rules 3.1 and 3.1A
In responding to this letter, you should have regard to EMU’s obligations under Listing Rules 3.1 and 3.1A and
also to Guidance Note 8 Continuous Disclosure: Listing Rules 3.1 – 3.1B. It should be noted that EMU’s obligation
to disclose information under Listing Rule 3.1 is not confined to, nor is it necessarily satisfied by, answering the
questions set out in this letter.
Suspension
If you are unable to respond to this letter by the time specified above ASX will likely suspend trading in EMU’s
securities under Listing Rule 17.3.
3/4
ASX Customer Service Centre 131 279 | asx.com.au
Enquiries
If you have any queries or concerns about any of the above, please contact me immediately.
Yours faithfully
Daniel Nicholson
Adviser, Listings Compliance (Perth)
4/4