EMU Secures Historic High Grade Gnows Nest Gold Project WA
Released
Released
Announcement PDF
EMU NL
EMU Secures Historic, High-grade Gnows Nest
Gold Project near Yalgoo, WA
28 September 2020
Emu NL (EMU” or the Company, ASX:EMU) is pleased to announce that it has entered into a definitive
agreement to acquire the advanced-stage Gnows Nest Gold Project located in the Yalgoo Mineral Field
of WA.
HIGHLIGHTS - GNOWS NEST PROJECT
o Agreement executed to secure 100% of the shares in Coruscant Minerals Pty Ltd, the holder of
the Gnows Nest Gold Project located 32km southeast of Yalgoo in WA
o Project hosts the historic Gnows Nest gold mine with reported production of ~27,925oz at a
recovered grade of 22g/t Au between 1923 and 1941
o It has been reported that that mining ceased during the World War II due to a shortage of mining
labour
o Recent drilling by Coruscant has outlined a small, shallow Indicated and Inferred JORC
Compliant (2012) Resource of 113,400t at 3.78g/t Au for 13,777oz Au, which remains open at
depth and along strike
o EMU has concluded there exists extensive exploration upside potential within the central mining
lease and surrounding exploration leases
o EMU’s principal focus will be to advance the Mineral Resource as a near-term production
opportunity via a simple shallow open cut gold operation for possible toll treatment
o Significant scope for resource expansion and further high-grade gold discoveries along strike and
down dip of the former mine and within the surrounding exploration holding
o Project located within same greenstone belt that hosts the world-class Golden Grove copper-zinc
mine and which has been the focus of recent exploration success for gold by Firefly Resources
Limited (ASX: FFR) and base metals by Venture Minerals Limited (ASX: VMS)
o Targeted program of IP geophysics and RC drilling to commence Q4 2020
EMU NL
10 Walker Avenue, West Perth, WA, 6005
T: +61 (08) 9226 4266
info@emunl.com.au
ABN 50 127 291 927
PO Box 112, West Perth, WA, 6872
ASX Code: EMU
www.emunl.com.au
Figure 1: Location map of EMU projects in WA overlain on geology
1. GNOWS NEST PROJECT
The Gnows Nest Project is located 32km southeast of the township of Yalgoo and covers a total area of
~870 ha. The Project tenement holding comprises a central granted Mining Lease (M59/739) of 7.3 ha,
granted Exploration Licence (E59/1735) of 590.3 ha and an application to convert that 279.3 ha of
E59/1735 as surround M59/739 into a Mining Lease (MLA59/763) of and (Figure 2).
Page 2 of 28
The Project tenements overlay a complex structural flexure within the Archean Yalgoo-Singleton
greenstone belt, which is bound by the Badja and Walgardy intrusive granitoid batholiths of the Youanmi
Terrane to the east and west (Figure 3). The greenstone stratigraphy in the Gnows Nest area comprise
mafic and ultramafic intrusive volcanics with intercalations of banded iron formations, banded cherts and
an argillaceous sedimentary sequence. The greenstones have a general north-northwest trend but are
flexed northward in the vicinity of the Gnows Nest mine. The rock sequences generally dip steeply to the
west.
Fig 2: Gnows Nest Project area overlain on geology and aeromagnetics (TMI)
At Gnows Nest, historical gold workings occur over a 380m strike length, hosted within a 345o trending
shear zone, dipping 57o west and averaging ~10m in width, characterised by talc-chlorite schists hosting
individual mineralised quartz veins varying between 0.5m to greater than 5m, but typically ranging to 2m.
The shear zone is interpreted as a dextral strike-slip fault separating gabbro to the west from
metasediments, banded iron formations and cherts to the east.
Historical gold production from Gnows Nest was mostly via the main shaft system (Figure 4), however
significant production shafts were sunk 100m (Shaft B) and 120m (Shaft A) to the north and 150m (Shaft
C) and 210m (Shaft D) to the south.
Underground mining extended to 5 levels (~135m deep) exploiting a central, steep-plunging ore shoot
over a strike length of 80m in the main shaft area. More recent surface alluvial/colluvial mining was
carried out in the northern and southern areas of M59/739.
Page 3 of 28
Fig 3: Gnows Nest regional setting
Page 4 of 28
Fig 4: Gnows Nest 3D model showing historical mining and open pit resource model
Mines Department (DMIRS) records indicate that between 1923-1941, 39,746t of ore was treated with
868.566 kg (~27,925oz) gold produced at a recovered grade of 21.85g/t Au.
Previous historical RAB, AC, RC and DD drilling totals over 11,000m mainly within M59/739. Recent
(2018-2019) close-spaced resource definition RC drilling by Coruscant at the Gnows Nest mine returned
the following significant intercepts:
o
o
o
o
o
o
o
o
o
18GNRC001: 5m @ 5.04g/t Au from 29m incl 2m @ 9.94g/t Au
18GNRC002: 6m @ 9.52g/t Au from 40m incl 4m @ 13.2g/t Au
18GNRC048: 13m @ 13.73g/t Au from 39m incl 2m @ 76.24g/t Au
18GNRC049: 12m @ 6.24g/t Au from 23m incl 4m @ 17.40g/t Au
18GNRC035: 5m @ 4.06g/t Au from 23m incl 1m @ 10.67 g/t Au
18GNRC026: 4m @ 5.51g/t Au from 44m
19GNRC091: 4m @ 4.01g/t Au from 2m incl 2m @7.80g/t Au
19GNRC120: 8m @ 7.01g/t Au from 42m incl 4m @ 13.62g/t Au
19GNRC071: 5m @9.69g/t Au from 48m incl 1m @ 34.29g/t Au
Further details of the drilling programs are provided in Annexure B (drill hole collar data) and Annexure
C (Intercepts >1.0g/t Au).
The Gnows Nest mine area was pattern-drilled by Coruscant on a 10m x 10m grid (but to a maximum
depth of only 54m) allowing for a resource estimate to be completed. The Mineral Resource reported in
accordance with the JORC Code (2012) is summarised in Annexure A (Section ii).
Supporting information on the Mineral Resource Estimate, in accordance with ASX Listing Rule 5.8, is
presented in Annexure B.
Page 5 of 28
Fig 5: Geological section 6837560N through Gnows Nest
2. EXPLORATION STRATEGY
EMU’s priority at Gnows Nest will be to advance the Mineral Resource as a near-term production
opportunity via a simple shallow open cut gold operation for possible toll treatment.
The Project, which encapsulates an historic gold mining field, will also be the subject of ongoing
exploration directed at growing the resource base. The potential for further high-grade gold discoveries
associated with other dilational zones within the tenement package is considered high.
Coruscant’s drilling highlighted the strike and depth potential of the Gnows Nest shear zone (outside of
the historically mined area and the area of the Resource reported herein) with numerous high-grade
intercepts reported within the 400m long resource envelope.
In particular, the deepest drill hole (GND-01) intersected 2m @ 7.35g/t Au from 187m including 1m @
14.50g/t Au, confirming that the high-grade mineralisation persists at depth well below the historic mine
workings.
Page 6 of 28
The Gnows Nest shear zone has been traced further south into MLA59/763 with only wide-spaced drilling
completed.
The geological setting of the Project is also considered favourable for VMS base metal mineralisation, as
it is located along the same greenstone belt that hosts the world-class Golden Grove copper-zinc mine
and is in close proximity to several VMS discoveries recently announced by Venture Minerals Limited
(ASX: VMS).
EMU’s initial exploration program will comprise IP geophysical surveys centred on Gnows Nest to trace
the mineralised shear along strike directed at identifying structural repeats. EMU has designed an RC
drilling program of 8,000m to improve confidence in the previously defined resource, test for extensions
along strike and down dip, and evaluate other priority regional targets.
3. TERMS OF ACQUISITION
Key terms for the purchase of 100% of the shares comprising the issued capital of Coruscant Minerals
Pty Ltd are summarised as follows:
i) $1.2m cash payment on settlement subject to any shareholder approvals required;
ii) 22,857,142 Ordinary Fully Paid EMU shares to be issued (at a nominal $0.028 per share) at
settlement;
iii) 48,571,429 Ordinary Fully Paid EMU shares to be issued (at a nominal $0.028 per share) on
achieving the milestone described in iv);
iv) the milestone is the announcement by EMU of a minimum 50,000oz Au JORC Indicated Resource
grading >3.5g/t Au or a 34,000oz Au JORC Reserve, whichever is announced sooner;
v) the shares are to be escrowed for 12 months from their respect dates of issue
Page 7 of 28
COMPETENT PERSON’S STATEMENT
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
298,005,436 (inc. 15.7m which EMU can
buy back for nil consideration)
Contributing Shares (listed)
33,725,496 paid to $0.03, $0.03 to pay, no
call before 31/12/2023
Options (unlisted)
65,759,750 options to acquire partly paid
shares, exercisable at $0.02 each, on or
before 21 December 2020
84,355,000 options to acquire fully paid
shares, exercisable at $0.20 each, on or
before 15 January 2021
8,454,468 options to acquire fully paid
shares, exercisable at $0.20 each, on or
before 16 January 2021
22,000,000 options to acquire partly paid
shares, exercisable at $0.03 each, on or
before 21 December 2021
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
CEO
Doug Grewar
T +61 8 9226 4266
E info@emunl.com.au
The information in this report that relates to Exploration Results
is based on, and fairly represents information and supporting
documentation prepared by Mr. Francisco Montes, a Competent
Person who is a Member of the Australian Institute of
Geoscientists. Mr. Montes is an employee of Emu NL and has
sufficient experience in the activity which he is undertaking to
qualify as a Competent Person as defined in the 2012 edition of
the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr Montes consents to the
inclusion herein of the matters based upon his information in the
form and context in which it appears.
The information in this report that relates to Mineral Resources
is based on information compiled by Mr. Ben Pollard, a
Competent Person who is a Member of the Australasian Institute
of Mining and Metallurgy. Mr. Pollard is an employee of Cadre
Resources Pty Ltd and has sufficient experience that is relevant to
the style of mineralisation and type of deposit that is under
consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Mr. Pollard consents to
the inclusion herein of the matters based upon his information in
the form and context in which it appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertainties and other factors,
actual events and results may differ materially from any forward
looking and other statements herein not purporting to be of
historical fact. Any statements concerning mining reserves,
resources and exploration results are forward looking in that they
involve estimates based on assumptions. Forward looking
statements are based on management’s beliefs, opinions and
estimates as of the respective dates they are made. The Company
does not assume any obligation to update forward looking
statements even where beliefs, opinions and estimates change or
should do so given changed circumstances and developments.
Page 8 of 28
ANNEXURE – A
Resources Estimate Disclosures
Section (i)
Item
Gnows Nest Deposit:
Mineral Resource: Gnows Nest Gold Deposit
1
The Gnows Nest Mineral Resource Estimate has been reported by the vendor, Coruscant Minerals Pty Ltd
2
The Gnows Nest Mineral Resource Estimate has been reported under the JORC Code 2012
3
The Gnows Nest Mineral Resource Estimate was based on work programs, key assumptions, mining and
processing parameters and methods as outlined in Annexure A(ii) – Summary of the key assumptions,
mining and processing parameters and methods used to prepare the Mineral Resource Estimate
4
Emu NL obtained from the vendor, Coruscant Minerals Pty Ltd, the latest resource estimate and data
relevant to the reported mineralisation and, as part of its Due Diligence, commissioned an independent
technical review of the resource by Auralia Mining Consultants. The Auralia review was conducted in
August 2020.
5
A statement by a Competent Person, Mr Ben Pollard confirms that the information related to a mineral
resource contained in this announcement is an accurate representation of the available data and studies for
the mining project.
Section (ii)
Summary of the key assumptions, mining and processing parameters and methods used to
prepare the Mineral Resource Estimate:
The Mineral Resource Estimation (MRE) for Gnows Nest Gold Deposit was determined using traditional
sectional analysis, wireframing of mineralised domains using a nominal 0.5g/t Au cut-off, 1m
standardised compositing of drill-hole assays, coding of a 3D block model utilising block dimensions of
10m x 2m x 4m. Variable sub-blocking down to 5m x 1m x 2m was utilised to resolve modelled volumes
and estimated using Ordinary Kriging (OK) geostatistical methodology. 1m composites were top cut to
20g/t Au to reduce the influence of high-grade outliers. Statistical analyses and variography were used to
define the various estimation parameters with respect to sample variability and spatial distribution in an
effort to reduce any potential spatial or grade bias. A range of densities were applied to the coded Gnows
Nest block model using 2.10g/cm3, 2.50g/cm3 and 2.70g/cm3 as oxide, transitional and fresh material
densities respectively, to allow tonnages to be calculated when combined with volume.
Au OK Cut
Volume
(m3)
0.0 - 0.5
0.5 - 1.0
1.0 - 9999.0
630
690
9,010
10,330
1,636
1,624
21,316
24,576
0.32
0.66
3.37
2.99
17
34
2,310
2,363
0.0 - 0.5
0.5 - 1.0
1.0 - 9999.0
Sub Total
4,000
3,840
27,480
35,320
10,181
9,811
68,799
88,791
0.33
0.67
5.02
4
108
211
11,104
11,419
Grand Total
45,650
113,367
3.78
13,777
Inferred
Sub Total
Indicated
Tonnes
(t)
Au (g/t)
Au (oz)
Page 9 of 28
ANNEXURE – B
ASX Listing Rule 5.8.1:
In relation to ASX Listing Rule 5.8.1, Emu NL provides a fair and balanced representation of the
information contained in the Coruscant Gnows Nest MRE Report (See Annexure F for compliance to
ASX Listing Rule 5.8.2 – JORC Table 1, Sections 1, 2 & 3)
Geology & geological Interpretation:
The project lies within an attenuated portion of the Yalgoo-Singleton greenstone belt bound by
the Badja and Walgardy granitoid batholiths of the Youanmi Terrane.
Gnows Nest is a lode-hosted orogenic gold deposit similar to many of the gold occurrences in
the Yalgoo region, and within the WA Yilgarn Craton. The lode is developed within Archean
mafic rocks and gold is hosted in the sheared and quartz veined host.
Sampling and sub-sampling techniques:
Sampling of RC drilling was typically conducted in 1m samples taken from cone splitters
(Coruscant) or riffle splitters. Sample size presented for analysis was typically 3-5kg per sample
(historic RC samples are assumed to have been riffle split)
All sampling and geological logging was supervised by a qualified Cadre Geology and Mining
Pty Ltd geologist who was competent in the style of mineralisation.
Drilling techniques:
The complete drill hole database provided for the Gnows Nest project area contains 219
individual RAB, AC, RC and DD drill holes. A restriction has been applied to the data base for
the estimation of Gnows Nest, with RAB, AC and DD drill holes excluded from the MRE
calculation.
In total, 161 RC holes for 6,931.2m have been utilised in the Mineral Resource Estimate (MRE).
Drill holes have been predominantly drilled on an azimuth of 090o (east) with a general dip of 060o.
The criteria used for classification, including drill and data spacing and distribution:
The drill hole data spacing is typically 10m x 10m, with data spacing and distribution sufficient
to establish the degree of geological and grade continuity appropriate for the MRE.
Sample analysis method:
Samples have been typically analysed via a 30-50g fire assay with ICP finish (AAS for previous
historical samples). Samples have been submitted to various reputable laboratories in Perth,
including Nagrom Analytical.
Estimation methodology:
Grade estimation of Au ppm has been completed using Ordinary Kriging (OK) to all Resources.
A nominal 0.3g/t wireframe was interpreted on section and used to subset and constrain the data
points used in the interpolation.
Project data was stored in a MS Access database and imported into Surpac software.
Variography of the main mineralisation zone was used to define variogram models on Surpac
software for the Ordinary Kriging (OK) interpolation.
Cut-off grade(s):
Top cuts were generated using disintegration curves and statistical outlier analysis. The current
in situ, drill-defined resource inventory for the Gnows Nest has been reported at 0, 0.5 & 1.0g/t
Au cut-offs.
Page 10 of 28
ANNEXURE – C
Summary of drilling programmes on which the Mineral Resource Estimate is based:
161 RC holes were utilised in the creation of the MRE for Gnows Nest Gold Deposit. All historical
RAB, aircore and diamond holes within the project area were excluded from the MRE.
Gnows Nest: Drilling Statistics for Mineral Resource Estimate (MRE)
Hole
Type
No of Holes
Average Depth
(m)
Total Metres
(m)
Maximum
Depth (m)
RC
161
43.05
6,931.2
139.0
Gnows Nest Project - JORC 2012 Mineral Resource Summary – Collar Table
Grid Datum: MGA94 (Zone 50)
Hole ID
Hole
Easting
Northing
RL
EOH
Tenement
Type
(m)
(m)
(m)
Depth
(m)
18GNRC001
RC
487,218
6,837,562
357
48
M59/739
18GNRC002
RC
487,209
6,837,559
357
54
M59/739
18GNRC003
RC
487,203
6,837,579
358
54
M59/739
18GNRC004
RC
487,214
6,837,579
358
42
M59/739
18GNRC005
RC
487,224
6,837,579
358
36
M59/739
18GNRC006
RC
487,233
6,837,579
359
30
M59/739
18GNRC007
RC
487,245
6,837,580
360
18
M59/739
18GNRC008
RC
487,199
6,837,599
358
48
M59/739
18GNRC009
RC
487,209
6,837,599
358
43
M59/739
18GNRC010
RC
487,219
6,837,600
358
36
M59/739
18GNRC011
RC
487,230
6,837,599
359
30
M59/739
18GNRC014
RC
487,194
6,837,619
358
48
M59/739
18GNRC015
RC
487,204
6,837,619
358
42
M59/739
18GNRC016
RC
487,214
6,837,619
359
36
M59/739
18GNRC017
RC
487,224
6,837,619
359
36
M59/739
18GNRC019
RC
487,189
6,837,639
358
54
M59/739
18GNRC020
RC
487,199
6,837,639
359
42
M59/739
18GNRC021
RC
487,209
6,837,640
359
36
M59/739
18GNRC022
RC
487,220
6,837,640
359
30
M59/739
18GNRC023
RC
487,214
6,837,659
359
24
M59/739
18GNRC024
RC
487,194
6,837,659
359
42
M59/739
18GNRC025
RC
487,204
6,837,659
359
36
M59/739
18GNRC026
RC
487,184
6,837,659
358
54
M59/739
18GNRC028
RC
487,179
6,837,679
358
54
M59/739
18GNRC029
RC
487,189
6,837,679
358
42
M59/739
18GNRC030
RC
487,199
6,837,679
358
36
M59/739
18GNRC031
RC
487,210
6,837,679
359
24
M59/739
18GNRC033
RC
487,176
6,837,698
358
54
M59/739
18GNRC034
RC
487,187
6,837,699
358
48
M59/739
18GNRC035
RC
487,197
6,837,699
359
36
M59/739
18GNRC037
RC
487,169
6,837,718
357
54
M59/739
18GNRC038
RC
487,180
6,837,719
357
48
M59/739
18GNRC039
RC
487,189
6,837,720
358
42
M59/739
18GNRC040
RC
487,190
6,837,719
358
36
M59/739
18GNRC042
RC
487,164
6,837,739
356
54
M59/739
Page 11 of 28
Hole ID
Hole
Type
Easting
(m)
Northing
(m)
RL
(m)
18GNRC043
18GNRC044
18GNRC047
18GNRC048
18GNRC049
18GNRC050
18GNRC051
18GNRC052
18GNRC053
18GNRC054
18GNRC055
18GNRC056
18GNRC057
18GNRC058
18GNRC059
18GNRC060
18GNRC061
18GNRC062
18GNRC063
18GNRC064
18GNRC065
18GNRC066
18GNRC067
18GNRC068
18GNRC069
18GNRC070
19GNRC071
19GNRC072
19GNRC073
19GNRC074
19GNRC075
19GNRC076
19GNRC077
19GNRC078
19GNRC079
19GNRC080
19GNRC081
19GNRC082
19GNRC083
19GNRC084
19GNRC085
19GNRC086
19GNRC087
19GNRC088
19GNRC089
19GNRC090
19GNRC091
19GNRC092
19GNRC093
19GNRC094
19GNRC095
19GNRC096
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
487,174
487,173
487,159
487,169
487,179
487,187
487,184
487,198
487,154
487,164
487,174
487,167
487,178
487,147
487,156
487,155
487,116
487,125
487,135
487,147
487,149
487,110
487,120
487,130
487,140
487,097
487,205
487,228
487,239
487,199
487,210
487,222
487,231
487,240
487,251
487,193
487,199
487,211
487,222
487,232
487,242
487,241
487,208
487,218
487,228
487,238
487,234
487,244
487,217
487,226
487,234
487,230
6,837,739
6,837,739
6,837,759
6,837,759
6,837,759
6,837,761
6,837,779
6,837,778
6,837,779
6,837,779
6,837,779
6,837,798
6,837,797
6,837,799
6,837,799
6,837,819
6,837,819
6,837,819
6,837,820
6,837,819
6,837,837
6,837,837
6,837,837
6,837,837
6,837,838
6,837,836
6,837,550
6,837,560
6,837,560
6,837,570
6,837,570
6,837,570
6,837,570
6,837,570
6,837,570
6,837,580
6,837,590
6,837,590
6,837,590
6,837,590
6,837,590
6,837,600
6,837,610
6,837,610
6,837,610
6,837,610
6,837,620
6,837,620
6,837,630
6,837,630
6,837,630
6,837,640
357
357
356
356
356
357
356
357
355
356
356
355
356
355
355
355
353
353
354
354
354
352
353
353
353
352
357
358
359
358
357
358
358
359
360
358
358
358
358
359
359
359
358
359
359
359
359
359
359
359
359
359
EOH
Depth
(m)
54
48
54
54
42
36
24
18
54
48
36
36
18
54
54
24
54
54
42
36
18
48
42
30
24
54
54
39
24
54
54
45
33
27
18
54
54
42
33
30
24
18
36
30
24
18
18
12
30
21
12
18
Tenement
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
Page 12 of 28
Hole ID
Hole
Type
Easting
(m)
Northing
(m)
RL
(m)
19GNRC097
19GNRC098
19GNRC099
19GNRC100
19GNRC101
19GNRC102
19GNRC103
19GNRC104
19GNRC105
19GNRC106
19GNRC107
19GNRC108
19GNRC109
19GNRC110
19GNRC111
19GNRC112
19GNRC113
19GNRC114
19GNRC115
19GNRC116
19GNRC117
19GNRC118
19GNRC119
19GNRC120
19GNRC121
19GNRC122
19GNRC123
19GNRC124
19GNRC125
19GNRC126
19GNRC127
19GNRC128
EWP7
GND-2
GNRC026
GNRC027
GNRC028
GNRC029
GNRC030
GNRC031
GNRC032
GNRC033
GNRC034
GNRC035
GNRC036
GNRC037
GNRC038
GNRC039
GNRC040
GNRC043
GNRC044
GNRC-1
GNRC-10
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
487,192
487,202
487,212
487,222
487,232
487,225
487,235
487,187
487,197
487,208
487,218
487,227
487,216
487,182
487,192
487,202
487,206
487,199
487,168
487,163
487,168
487,178
487,180
487,175
487,192
487,166
487,167
487,172
487,180
487,166
487,177
487,174
486,876
487,043
487,212
487,143
487,207
487,179
487,100
487,051
487,001
486,951
487,051
487,001
486,951
487,245
487,229
486,877
486,858
487,582
487,567
487,087
487,213
6,837,650
6,837,650
6,837,650
6,837,650
6,837,650
6,837,660
6,837,660
6,837,670
6,837,670
6,837,670
6,837,668
6,837,670
6,837,679
6,837,690
6,837,690
6,837,690
6,837,690
6,837,698
6,837,709
6,837,770
6,837,750
6,837,751
6,837,750
6,837,708
6,837,704
6,837,730
6,837,730
6,837,770
6,837,770
6,837,789
6,837,790
6,837,739
6,839,213
6,837,683
6,837,533
6,837,506
6,837,478
6,837,522
6,837,949
6,837,949
6,837,949
6,837,949
6,838,049
6,838,049
6,838,049
6,837,975
6,837,963
6,839,193
6,839,181
6,837,678
6,837,667
6,837,847
6,837,636
359
359
359
359
359
359
359
358
359
359
359
359
359
358
358
359
359
359
357
356
356
356
357
357
358
356
356
356
356
355
356
357
335
356
355
354
353
355
351
349
348
350
348
348
351
357
356
343
344
353
352
353
354
EOH
Depth
(m)
42
36
30
18
12
18
12
54
42
30
18
12
18
54
42
36
27
30
54
54
54
48
36
54
39
54
48
45
30
36
30
48
50
117
79
139
90
120
70
70
70
70
70
100
70
66
109
60
108
60
100
50
25
Tenement
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
M59/739
E 5901012
GML5901252
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
E 5901012
GML5901252
GML5901252
Page 13 of 28
Hole ID
Hole
Type
Easting
(m)
Northing
(m)
RL
(m)
GNRC-11
GNRC-12
GNRC-13
GNRC-14
GNRC-15
GNRC-16
GNRC-17
GNRC-18
GNRC-19
GNRC-2
GNRC-20
GNRC-21
GNRC-3
GNRC-4
GNRC-5
GNRC-6
GNRC-7
GNRC-8
GNRC-9
LSP7
LSP8
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
487,198
487,224
487,210
487,236
487,221
487,247
487,237
487,248
487,234
487,117
487,260
487,245
487,149
487,173
487,160
487,185
487,171
487,202
487,173
486,313
486,379
6,837,632
6,837,598
6,837,594
6,837,560
6,837,556
6,837,522
6,837,519
6,837,481
6,837,477
6,837,815
6,837,442
6,837,438
6,837,782
6,837,748
6,837,744
6,837,711
6,837,706
6,837,674
6,837,666
6,840,151
6,840,065
354
354
354
353
354
353
353
353
354
354
353
354
354
354
354
354
354
354
354
333
334
EOH
Depth
(m)
45
25
45
25
45
25
45
25
45
50
25
45
40
34
52
45
46
25
65
0.1
0.1
Tenement
GML5901252
GML5901252
GML5901252
GML5901252
GML5901252
E 5901012
E 5901012
E 5901012
E 5901012
GML5901252
E 5901012
E 5901012
GML5901252
GML5901252
GML5901252
GML5901252
GML5901252
GML5901252
GML5901252
E 5901012
E 5901012
Page 14 of 28
ANNEXURE – D
Gnows Nest Drill Hole Information:
Gnows Nest Deposit illustrating all drill collars, resource outline and a selection of significant intercepts
NB: Red outline shows surface projection of west-dipping shallow resource outline
Page 15 of 28
Gnows Nest Project – Table of Significant Interval (> 1.0g/t Au)
Hole ID
Hole Depth
From
To
(m)
(m)
(m)
GNRC-7
40
GNRC-14
GNRC-15
25
45
GNRC-18
25
GNRC-19
18GNRC002
45
54
18GNRC025
36
18GNRC024
42
18GRNC030
18GNRC034
18GNRC038
18GNRC043
18GNRC049
36
48
48
54
42
Inc
Inc
Inc
Inc
Inc
Inc
18GNRC048
Inc
And
18GNRC054
18GNRC050
18GNRC047
48
Inc
54
Inc
18GNRC044
18GNRC042
18GNRC040
Inc
18GNRC037
Inc
18GNRC035
Inc
18GNRC031
18GNRC026
18GNRC001
24
54
18GNRC003
54
18GNRC059
54
18GNRC068
30
Inc
Inc
Inc
And
18GNRC066
Inc
19GNRC081
19GNRC084
19GNRC091
54
30
18
19GNRC104
54
Inc
1
3
21
26
28
16
17
31
40
41
21
22
33
34
23
47
38
42
23
27
39
43
48
5
18
49
50
39
2
27
27
49
50
23
24
15
44
29
29
43
45
33
42
13
15
18
40
15
44
10
2
3
39
2
4
23
32
32
19
19
32
46
45
24
23
36
36
27
48
43
49
35
31
52
45
50
6
19
53
51
45
3
29
28
54
52
28
25
17
48
31
33
49
47
34
43
20
16
19
41
16
46
13
6
5
41
Interval
(m)
Au Grade
(g/t)
1
1
2
6
4
3
2
1
6
4
3
1
3
2
4
1
5
7
12
4
13
2
2
1
1
4
1
6
1
2
1
5
2
5
1
2
4
5
2
6
2
1
1
7
1
1
1
1
2
3
4
2
2
18.50
1.12
1.16
3.77
5.50
1.86
2.53
1.02
9.52
13.25
1.15
2.44
1.14
1.61
3.29
1.02
3.37
2.22
6.24
17.40
13.73
76.24
9.32
3.62
1.11
1.01
2.52
1.32
1.81
3.46
6.24
2.03
4.14
4.06
10.67
1.07
5.51
5.04
9.95
1.91
3.93
1.43
1.43
1.35
1.67
6.03
11.90
1.05
6.33
2.57
4.01
7.80
1.20
Page 16 of 28
Hole ID
Hole Depth
(m)
19GNRC109
18
19GRNC110
54
19GNRC111
19GNRC113
42
24
Inc
Inc
19GNRC114
Inc
19GNRC115
19GNRC117
Inc
19GNRC118
48
19GNRC119
36
Inc
Inc
And
19GNRC120
Inc
19GNRC122
19GNRC124
54
45
19GNRC071
54
19GNRC072
39
Inc
Inc
Inc
19GNRC073
Inc
19GNRC074
Inc
19GNRC075
54
19GNRC076
45
Inc
Inc
19GNRC077
19GNRC078
And
GNRC026
Inc
GNRC028
GNRC029
120
Inc
And
GNRC040
GNRC044
GNRB017
52
88
Inc
GND-1
193.6
Inc
From
(m)
To
(m)
Interval
(m)
Au Grade
(g/t)
50
6
6
42
42
30
13
17
0
26
27
51
45
46
34
35
28
28
30
42
42
50
31
31
48
49
20
21
12
12
52
53
38
41
25
26
19
23
7
13
47
47
81
82
82
90
48
73
68
68
73
81
187
187
51
10
7
45
44
33
15
18
1
28
28
52
50
48
37
37
36
29
31
50
46
54
35
33
53
51
26
23
19
14
54
54
43
43
31
30
20
24
8
15
56
52
82
91
88
91
52
74
87
69
79
83
189
188
1
4
1
3
2
3
2
1
1
2
1
1
5
2
3
2
8
1
1
8
4
4
4
2
5
2
6
2
7
2
2
1
5
2
6
4
1
1
1
2
9
5
1
9
6
1
4
1
19
1
6
2
2
1
1.29
1.67
5.48
1.18
1.50
2.71
2.80
3.89
1.40
2.68
5.15
1.02
2.22
4.87
1.39
1.59
1.89
5.25
8.23
7.01
13.62
2.63
1.15
2.06
9.69
20.23
1.65
3.62
3.77
11.95
1.65
3.07
1.86
4.19
2.88
4.06
1.28
1.06
1.28
1.12
11.67
20.70
1.59
8.65
12.69
1.20
1.69
2.36
3.01
9.08
6.40
2.37
7.35
14.50
Page 17 of 28
ANNEXURE – E
Tenement Schedule: Summary of acquisition tenure
Tenement Summary
Tenement
Holders
Application
Date
Grant
Date
Status
Area
(ha)
Expenditur
e
Rent
E59/2315
Coruscant Minerals Pty Ltd
30/04/2018
2/07/2019
Live
590.3
$15,000
$423.00
M59/0739
Coruscant Minerals Pty Ltd
8/12/2009
1/10/2010
Live
7.3
$10,000
$160.00
M59/0763
Coruscant Minerals Pty Ltd
18/02/2020
Pending
Pending
279.7
$28,700
$5,740
ANNEXURE - F
JORC 2012 Table 1 – Section 1: Sampling Techniques and Data
In compliance of ASX Listing Rule 5.8.2, Emu NL provides a fair and balanced representation of the
information contained in the Coruscant Gnows Nest MRE Report:
All information provided in JORC Table 1, Section 1, 2 & 3 is sourced from the Gnows Nest MRE
Report prepared and reviewed by Ben Pollard who is a member of the AusIMM and director of Cadre
Geology and Mining Pty Ltd acting as consultants for Coruscant Minerals Pty Ltd.
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation d
Share your feedback
Discover