EMU Exploration Update – Sunfire Nickel-Copper Project
19 April 2021
HIGHLIGHTS
Desktop review has highlighted an initial six nickel-copper targets related to
interpreted mafic-ultramafic intrusives for follow-up field evaluation at Emu’s
Sunfire project located in the South West region of WA.
EMU’s principal target and the main area of exploration by past explorers is the
Yornup Mill prospect, defined by anomalous nickel-copper soil geochemistry
extending across more than 1.5km of strike in an ultramafic sequence where nickel
and copper sulphides were reportedly logged in historic drill holes.
The areas of nickel-copper and pathfinder multi-element geochemistry remain open
and will be further evaluated as part of Emu’s first-pass exploration programme
testing the three interpreted trends of mafic-ultramafic intrusive activity (Yornup,
Seaton-Ross and Mersea trends).
The project is located contiguous to the Chalice Gold Mines- Venture Minerals JV
over the Thor massive sulphide discovery.
The project is considered prospective for magmatic sulphide mineralisation, with
geological attributes similar to the high-profile Nova-Bollinger, Mawson and
Julimar discoveries.
Project tenure at Sunfire comprises an Exploration Licence Application E70/5507
is expected to be granted Q3 2021. When granted, Emu’s planned exploration will
commence.
Emu NL (“Emu” or “the Company”) planned field evaluation program over the Sunfire
nickel-copper project is a step closer to implementation with shareholders having approved the
acquisition (see ASX: Results of General Meeting, 7 April 2021).
The Company’s work to date shows the limited and intermittent exploration completed over the
project area since the 1970s, and delineated multiple nickel-copper geochemical targets requiring
further investigation and several priority prospect areas that can be readily classified as ‘walkup’ drill targets.
1. Location and Access
The Sunfire project is located in the South West Mineral Field of WA, approximately 240km
south of Perth (Figure 1). The project is easily accessed via the Forrest Highway and South
Western Highways, with access throughout the project area provided by a well-maintained
network of all-weather gravel roads and tracks.
The project area sits in the far south west of Western Australia, between the towns of Bridgetown
and Manjimup, providing well-placed support centres for the Company’s developing exploration
program.
EMU NL
10 Walker Avenue, West Perth, WA, 6005
T: +61 (08) 9226 4266
info@emunl.com.au
ABN 50 127 291 927
PO Box 112, West Perth, WA, 6872
ASX Code: EMU
www.emunl.com.au
Fig 1 – Location map of Emu’s projects in WA overlain on geology
2. Geology and Potential
The South West Mineral Field of WA is a region of increasing interest following several key
discoveries in recent years. The presence of gold throughout the Mineral Field is well known,
with the Katanning and Tampia Hill gold projects currently moving toward development.
The South West was last extensively explored for base metals, and in particular copper and
nickel, in the 1970s and has lain largely dormant until the recent discovery of the world-class
Julimar nickel-PGE deposit, just north of Perth in early 2020 (Figure 1) drawing significant
attention to the region.
Page 2 of 7
The mineral field is already home to a number of other world-class deposits, including the
Boddington gold-copper mine, which produces around a million ounces of gold each year, and
the Greenbushes lithium-tantalum mine, which is located 25km to the north of EMU’s Sunfire
project (Figure 1).
3. Target Areas
Emu’s evaluation of the Sunfire exploration licence highlighted a number of geochemical and
geophysical targets that warrant further investigation. The prospects are interpreted to lie along
three main trends that include the Yornup Trend in the north, the Seaton Ross Trend in the central
tenement area and the Mersea Trend in the south (Figure 2). These trends are interpreted to be
related to deep-seated intrusive mafic-ultramafic units, which extend through the project area in
a north-east to south-west orientation.
(a) Seaton-Ross Trend:
The Yornup Mill prospect lies along the Seaton-Ross trend and is interpreted to overlie
a mafic-ultramafic intrusive complex based on the available aeromagnetic data, field
mapping and drilling data. Surface geochemical sampling undertaken in the early 1970s
outlined an extensive nickel-copper anomaly with a subdued cobalt association extending
over more than 1.5km of strike (Figure 3). This anomaly is interpreted by Emu to be of
both lateritic (in places) and primary sulphide origin. A review of the historic drill hole
logs from the poorly targeted drilling in the north of the prospect indicates the presence
of disseminated sulphides in deeper drill core, providing further evidence for potential
magmatic sulphide mineralisation (see WAMEX A6414 & 6419).
Previous exploration was mostly confined to the Palgarup State Forest. The Yornup Mill
nickel-copper prospect remains largely untested and open to the north-east along two
target zones, including Seaton Ross where the soil grids extend onto privately held
farming lots (Figure 3). This major trend also extends to the south-west towards the
Aerial and Railway targets.
The Company is currently negotiating access with the landowners surrounding the
Yornup Mill target in preparation for the commencement of the planned exploration
program in the coming months.
(b) Mersea Trend:
The Aerial and Half Moon prospects lie on the southern Mersea Trend around 1 km to
the south of Yornup Mill, interpreted as a separate mafic-ultramafic intrusive complex
(Figure 2). Limited previous surface geochemistry and auger sampling has highlighted
these two prospects as targets for ongoing and systematic exploration and will be field
checked when reconnaissance work resumes at Sunfire.
Page 3 of 7
Fig 2 – Sunfire Project target areas overlain on aerial imagery, geology and aeromagnetics
Page 4 of 7
Fig 3 – Yornup Mill N-Cu prospect showing areas defined for follow-up exploration
4. Tenure
Emu holds an option to purchase exploration licence E70/5507 (presently in the application
phase) which covers the Sunfire project area. The licence application is progressing through the
expedited procedure for grant and is anticipated to be granted in the third quarter of 2021.
On 6 April 2021 EMU’s shareholders approved the issue of 10m ordinary shares to Avenger
Projects Limited as part consideration upon completion of the acquisition.
Emu’s detailed review of Sunfire has highlighted several priority targets for testing immediately
following grant of the exploration licence.
Page 5 of 7
The Company is currently finalising plans and access for the follow-up geochemical sampling,
geophysical surveying and drilling programs as the tenement moves towards grant in the coming
months and looks forward to updating shareholders on its work program in the near future.
RELEASE AUTHORISED BY THE BOARD
Contact Details: Doug Grewar - Office: +61 8 9226 4266; Mobile: 0419 833 604
Page 6 of 7
COMPETENT PERSON’S STATEMENT
The information in this report that relates to
exploration results is based on, and fairly
represents
information
and
supporting
documentation prepared by Francisco Montes, a
Competent Person who is a Member of the
Australian Institute of Geoscientists. Mr Montes
is an employee of Emu NL and has sufficient
experience in the activity which he is undertaking
to qualify as a Competent Person as defined in the
2012 edition of the “Australasian Code for
Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Montes
consents to the inclusion herein of the matters
based upon his information in the form and
context in which it appears.
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
433,657,342 (including 18.6m which EMU can buy
back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay, no call
before 31/12/2023
Options (unlisted)
38,125,953 options to acquire fully paid shares,
exercisable at $0.15 each, on or before 23 August
2021
22,000,000 options to acquire partly paid shares,
exercisable at $0.03 each, on or before
21 December 2021
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertainties and
other factors, actual events and results may differ
materially from any forward looking and other
statements herein not purporting to be of
historical fact. Any statements concerning mining
reserves, resources and exploration results are
forward looking in that they involve estimates
based on assumptions. Forward looking
statements are based on management’s beliefs,
opinions and estimates as of the respective dates
they are made. The Company does not assume
any obligation to update forward looking
statements even where beliefs, opinions and
estimates change or should do so given changed
circumstances and developments.
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
NEW INFORMATION OR DATA
Doug Grewar CEO
EMU confirms that it is not aware of any new
information or data that materially affects the
information included in the original market
announcements and, in the case of estimates of
Mineral Resources, which all material
assumptions
and
technical
parameters
underpinning the estimates in the relevant market
announcement continue to apply and have not
materially changed. The Company confirms that
the form and context in which the Competent
Person’s findings are presented have not
materially changed from the original market
announcement.
T +61 8 9226 4266
M +61 419833604
E info@emunl.com.au
-
END
-