Progress Summary
Project operations, company systems and policy management gap analysis underway
Privacy breach detected and action taken as reported to ASX on 9 May 2025
Initial review of major exploration undertakings nears completion:
•
•
Georgetown project
•
Maiden drill program plan complete for Yataga Copper Project
•
Gold targets at Sandy Creek where EMU recorded rock chip samples up to
36.1g/t gold in late 2023 to be further investigated
Badja gold project (WA) confirmed upside
•
Potential areas of Resources extensions/upgrades identified
•
POWs lodged for further drilling
EMU NL (ASX: EMU or “the Company”) reports management restructuring has permitted a
comprehensive analysis of the Company’s undertakings to commence. This analysis includes
both exploration and corporate activities and is focused on adding value to EMU’s substantial
copper and gold asset base.
EXPLORATION ACTIVITIES
Georgetown Copper/gold Project – Far North Queensland
The extensive copper mineralization identified within the Yataga Igneous Complex (Figure 1), in
which there are multiple igneous intrusions and multiple mineralization styles, is not unlike the
Highland Valley Igneous Complex in British Columbia, Canada, which hosts Canada’s largest
open pit copper mine. Having a surface area of 70km2 the Yataga Igneous Complex has potential
to host very large-scale mineralised systems particularly as anomalies as presently defined, both
geochemical and geophysical, measure in units of square kilometres.
www.emunl.com.au
info@emunl.com.au
ASX Code: EMU
ABN: 50 127 291 927
1
That mineralisation is extensive and reflected in both soil geochemistry and rock chip samples
(Figure 2). Priority target areas at Fiery Creek and Yataga Valley have been defined in zones where
geochemical and geophysical anomalies are coincident.
Planning for the first drilling program is complete but awaits access approvals.
On 7 December 2023 EMU announced high-grade gold samples from the Sandy Creek prospect
located within EPM 27664 Georgetown. Rock chip samples of up to 36.1g/t were recovered in an
area where widespread high grade rock chip samples had been previously reported (see
Figure 3).
The gold sample results (historic and more recent EMU sampling) are very significant. Further
gold exploration will be incorporated in future field programs to develop drill targets.
Figure 1 Lithologies within the Yataga Igneous complex illustrating the composite nature of the intrusions
and similarities with the giant Highland Valley Igneous Complex in Canada.
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
ASX Code: EMU
ABN: 50 127 291 927
2
Figure 2 Copper in rock chip samples reflect the mineralization patterns within the Yataga Igneous
Complex and the two priority target zones at Fiery Creek and Yataga Valley.
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
ASX Code: EMU
ABN: 50 127 291 927
3
Figure 3 Gold sampling in the Georgetown region as reported to ASX 7 December 2023
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
ASX Code: EMU
ABN: 50 127 291 927
4
Badja Gold Project – Western Australia
The Badja Project covers an area of ~1,472ha in the Murchison region of Western Australia, 32km
southeast of the township of Yalgoo. The tenements include a number of historic workings the
largest being the Gnows Nest Mine which recorded historic production of ~27,925oz at a
recovered grade of 22g/t Au between 1923 and 1941.
The project has a JORC 2012 resource estimate of 555,637 tonnes grading 2.21 g/t Au and 0.14%
tungsten, containing approximately 39.4 thousand ounces of gold and 757 tonnes of tungsten,
based on a 0.5 g/t Au cut-off grade (ASX announcement 13 March 2025).
The last drilling program produced an intersection of 7m @10.12 g/t Au at Gnows Nest, and 9m
@ 3.44 g/t Au at Flying EMU (ASX announcement 22 July 2022) and programs prior to that
produced numerous high-grade intersections, many of which are outside the JORC 2012
resource envelopes. These results were subsequent to the maiden drilling program at Badja, as
reported to ASX on 22 February 2021 with the following significant intersections:
Gnows Nest Prospect:
4m at 20.40g/t Au from 51m
4m at 18.32g/t Au from 95m
3m at 42.18g/t Au from 77m
2m at 26.88g/t Au from 60m
6m at 6.42g/t Au from 116m; and
1m at 47.12g/t Au from 63m
Monte Cristo Prospect:
3m at 13.35g/t Au from 67m
6m at 6.51g/t Au from 120m; and
4m at 3.29g/t Au from 120m
Furthermore, on 25 October 2021 EMU reported an additional discovery at Water Tank Hill and
significant intersections at Monte Cristo. The mineralised envelope surrounding the Badja 2012
JORC Resource remains open in many locations. Since the time the last drilling was undertaken
the gold price has risen from A$2500/oz to over A$5000/oz casting a new complexion on the value
of the Badja project.
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
ASX Code: EMU
ABN: 50 127 291 927
5
The change in fiscal outlook for the Badja prompted a re-assessment of the project and a critical
review has highlighted areas where further drilling may extend the Resource. The Company has
lodged Program of Work (‘POW’) applications with the relevant authorities to continue drilling
with a view of expanding the resource. The Company is also reviewing potential to have ore from
the project toll treated at nearby gold processing facilities. The Company’s discussion with
existing processing plant operators indicate surplus capacity is likely to be available within the
anticipated Badja development timeframe. This may provide a low-capital cost entry into gold
production adding significant value to the 39,400 oz Au resource base and extensions thereof
that are likely to be realised from future drilling.
Corporate
The Company is in the process of reviewing all company procedures and policies. The review has
revealed privacy breaches involving the unauthorised, inappropriate and thought to be unlawful
distribution of shareholder information for inappropriate purposes. Regardless of the
circumstances, shareholders that suspect any of their confidential details have been
disclosed, for any reason, should immediately contact the Company using the contact details
below.
AUTHORISED FOR RELEASE BY THE BOARD
For further information, please contact:
Roland Bartsch
Non-Executive Director
EMU NL
info@emunl.com.au
Adrian Griffin
General Manager
EMU NL
adrian@emunl.com.au
+61 418 927 658
Investors can sign into our interactive investor hub and join in on the conversation with Emu NL.
https://investorhub.emunl.com.au/auth/signup
www.emunl.com.au
info@emunl.com.au
PO Box 1112
WEST PERTH WA 6872
EMU Investorhub QR Code
ASX Code: EMU
ABN: 50 127 291 927
6
ASX RELEASE | ASX:EMU
EMU NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (Listed)
193,601,409 (including 6.5M the subject
of a Controlled Placement Agreement
which EMU can buy back for nil
consideration)
Contributing Shares (Listed)
1,349,586 paid to $0.90, $0.90 to pay
Contributing Shares (Unlisted)
1,166,667 paid to $0.003, $1.20 to pay, no
call before 31 December 2025
Options (Unlisted)
3,400,000 options to acquire partly paid
shares, exercisable at $0.0001 each, on or
before 30 October 2025
33,550,000 options to acquire fully paid
shares, exercisable at $0.10 each, on or
before 31 October 2026
10,579,193 options to acquire fully paid
shares, exercisable at $0.09 each, on or
before 31 December 2026
Performance Rights (Unlisted)
1,619,051 performance rights in relation to
acquisition of Gnows Nest project (can be
repurchased for $20k if Gnows Nest
disposed of before 22.9.2025)
Directors:
Peter Thomas
Non-Executive Chairman
Roland Bartsch
Non-Executive Technical Director
Tim Staermose
Non-Executive Director
Investor enquiries:
E info@emunl.com.au
www.emunl.com.au
info@emunl.com.au
COMPETENT PERSON’S STATEMENT
The information in this report that relates to
exploration results is based on and fairly represents
information and supporting documentation reviewed
by Adrian Griffin, a Competent Person who is a
Member of the Australian Institute of Mining and
Metallurgy. Mr Griffin is General Manager of Emu NL
and has sufficient experience in the activity which he
is undertaking to qualify as a Competent Person as
defined in the 2012 edition of the “Australasian Code
for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Griffin consents to
the inclusion herein of the matters based upon his
information in the form and context in which it appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertainties and other
factors, actual events and results may differ
materially from any forward looking and other
statements herein not purporting to be of historical
fact. Any statements concerning mining reserves,
resources and exploration results are forward
looking in that they involve estimates based on
assumptions. Forward looking statements are based
on management’s beliefs, opinions, and estimates
as of the respective dates they are made. The
Company does not assume any obligation to update
forward looking statements even where beliefs,
opinions and estimates change or should do so given
changed circumstances and developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new
information or data that materially affects the
information included in the original market
announcements and, in the case of estimates of
Mineral Resources, which all material assumptions
and technical parameters underpinning the
estimates in the relevant market announcement
continue to apply and have not materially changed.
The Company confirms that the form and context in
which the Competent Person’s findings are
presented have not materially changed from the
original market announcement.