EMU Exploration Programme for Copper Nickel PGE Underway
Released
Released
Announcement PDF
EMU’s Systematic Exploration Programme for Copper, Nickel
and PGE’s Underway
24 February 2021
Emu NL (EMU or the Company, ASX:EMU) has commenced on-ground systematic
geochemical exploration work at its highly prospective Viper, Graceland and 8 Mile Dam
projects in the Wheatbelt and Goldfields regions of WA.
A vehicle mounted auger drill rig will complete a first-pass soil geochemical survey exploring
for primary copper (Cu), nickel (Ni) and platinum group element (PGE) occurrences. The
results of this program will be used to identify any geochemical anomalism which would lead
to further exploration potentially utilising geophysics and drilling.
The Viper Project, near Jerramungup, is centred around the historic high grade Netty
Copper Mine. Past production from Netty over the period 1907 – 1969 is reported at
3.13 t of contained copper from 30.5t of oxide and sulphide (chalcopyrite) ore. Viper
is interpreted to be a discrete mineral occurrence along a broad base metal trend
associated with shearing at the contact of a mafic intrusive and granite dome.
The Graceland Project, near Hyden, features a significant but concealed, 5 km long
co-incident magnetic and gravity anomaly interpreted as a mafic-ultramafic intrusion
considered prospective for Ni and Cu mineralisation. The anomaly is of sufficient
interest to have been the prime driver for EMU to secure this project.
Historic drill chip samples collected by EMU from the 8 Mile Dam Project near
Menzies indicate the presence of previously unrecognised mafic – ultramafic units
within this largely granitic terrane considered prospective for Ni and PGE
mineralisation.
Historic and intermittent mining and exploration activity on EMU’s project areas
provides support for a targeted programme of exploration to commence immediately.
A 4WD mounted auger drill with capability to drill more than 20m below surface
will undertake the first-pass geochemical survey under the hands-on supervision of a
highly experienced and skilled geologist.
The recent world class Julimar discovery by Chalice Gold Mines Limited
(ASX:CHN) has highlighted the previously unrecognised, undercover exploration
potential of the South West Terrane of Western Australia for Ni-Cu-PGE
mineralisation.
EMU’s Chairman Peter Thomas commented,
“Following the success of our maiden drilling programme at Gnows Nest, EMU is launching
its “on ground” focus over its base metals portfolio. The recently acquired Graceland and
Viper Projects, along with our 8 Mile Dam Project, will be tested by a comprehensive
geochemistry programme targeting Cu, Ni and PGE mineralisation. These projects are all
situated under cover within untested greenstone belts. EMU anticipates that successful
results, if any, will immediately transition to follow-up geophysical and RC drilling
programmes.”
EMU NL
10 Walker Avenue, West Perth, WA, 6005
T: +61 (08) 9226 4266
info@emunl.com.au
ABN 50 127 291 927
PO Box 112, West Perth, WA, 6872
ASX Code: EMU
www.emunl.com.au
VIPER PROJECT - JERRAMUNGUP,WA
The 122.5 km2 Viper Project, located 8 km from Jerramungup, is centred on the historic,
high grade, intrusive related, Netty Copper Mine. The area around the mine has never been
subjected to detailed exploration. Considering the demonstrated history of Cu production,
detailed below, Viper presents as an interesting target for the application of contemporary
exploration techniques.
Production from Netty, over the period 1907 – 1969, is reported at 3.13 t of contained copper
from 30.5t of oxide and sulphide (chalcopyrite) ore.
A channel sampling programme of the underground mine workings over a strike length of 40m
by Audax Resources Limited in 1987 returned copper values in the range 3% to 10% with
a peak value of 14.1% from a total of 52 samples. Nickel results were mostly over 1,000
ppm, with a peak value of 0.51% (refer to ASX announcement dated 28 September 2020
“EMU Secures Highly Prospective Exploration Portfolio in WA”).
EMU will test the Netty Mine area and host trend with an auger soil geochemistry sampling
programme on a 400m x 100m grid (Figure 1). Any first pass anomalism will help guide further
exploration investigation.
Page 2 of 8
Figure 1. Viper Auger Drilling Programme Jerramungup WA, overlaying aeromagnetics
Page 3 of 8
GRACELAND PROJECT - HYDEN, WA
The 58.2 km2 Graceland Project is located 40km southeast Hyden over a flat lying area with
no outcrop. The project covers a discrete 5km long north-south trending, magnetic feature
coincident with a gravity anomaly interpreted as a mafic-ultramafic intrusion. This
interpretation is supported by Golden Mile Resources Limited’s (ASX:G88) Quicksilver Nilaterite discovery overlying ultramafic rocks located 7km to the west of Graceland.
Modelling of detailed ground magnetics geophysical data from within the Graceland Project
has outlined 10 high-value magnetic plates at depths of 70 - 120m. (refer to ASX
announcement dated 28 September 2020 “EMU Secures Highly Prospective Exploration
Portfolio in WA”).
The Graceland auger geochemistry will be carried out on a 400m x 100m grid across the
magnetic anomaly (Figure 2). Any first pass anomalism will help guide further exploration
investigation.
Page 4 of 8
Figure 2. Graceland Auger Drilling Programme Hyden WA, overlaying aeromagnetics
Page 5 of 8
8 MILE DAM PROJECT - MENZIES WA
The 8 Mile Dam Project is located 20km southwest of Menzies in the WA Goldfields.
EMU will, as part of its methodical and measured modus operandi, conduct an auger
programme to test the prospectivity of the interpreted remnant mafic – ultramafic
sequence intersected by previous drilling for diamonds within the largely granitic
terrane. This programme will be EMU’s first on ground geochemical programme at this
project following the reconnaissance visit by Company geologists in August 2020.
The auger drilling will target the greenstone zones with 4 x 3-4 km east-west lines spaced
100m apart (Figure 3). Any first pass anomalism will help guide further exploration
investigation.
Page 6 of 8
Figure 3. Proposed Auger Drilling Programme Lines - 8 Mile Dam, Menzies WA, overlaying
aeromagnetics
CORPORATE ACTIVITIES
Shareholder approval of contracts and Notice of Meeting
EMU still awaits ASX approval to issue a notice to convene a general meeting of
shareholders as reported in its December Quarterly Report (see ASX release 31 January
2021) to approve the issue of securities pursuant to the terms of the Avenger Projects’
and Gnows Nest agreements (see ASX release on 28 September 2020 “EMU Secures
Highly Prospective Exploration Portfolio in WA”).
Page 7 of 8
AUTHORISED FOR RELEASE BY DOUG GREWAR, CEO
COMPETENT PERSON’S STATEMENT
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
433,657,342 (including 18.6m which EMU can buy
back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay, no call
before 31/12/2023
Options (unlisted)
38,625,953 options to acquire fully paid shares,
exercisable at $0.15 each, on or before 23 August
2021
22,000,000 options to acquire partly paid shares,
exercisable at $0.03 each, on or before
21 December 2021
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
T +61 8 9226 4266
M +61 419833604
E info@emunl.com.au
The information in this report that relates to
exploration results is based on, and fairly represents
information and supporting documentation prepared
by Kurtis Dunstone, a Competent Person who is a
Member of the Australian Institute of Geoscientists.
Mr Dunstone is an employee of Emu NL and has
sufficient experience in the activity which he is
undertaking to qualify as a Competent Person as
defined in the 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr Dunstone
consents to the inclusion herein of the matters based
upon his information in the form and context in
which it appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertainties and
other factors, actual events and results may differ
materially from any forward looking and other
statements herein not purporting to be of historical
fact. Any statements concerning mining reserves,
resources and exploration results are forward
looking in that they involve estimates based on
assumptions. Forward looking statements are based
on management’s beliefs, opinions and estimates as
of the respective dates they are made. The Company
does not assume any obligation to update forward
looking statements even where beliefs, opinions and
estimates change or should do so given changed
circumstances and developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new
information or data that materially affects the
information included in the original market
announcements and, in the case of estimates of
Mineral Resources, which all material assumptions
and technical parameters underpinning the estimates
in the relevant market announcement continue to
apply and have not materially changed. The
Company confirms that the form and context in
which the Competent Person’s findings are
presented have not materially changed from the
original market announcement.
- END -
Page 8 of 8
Share your feedback
Discover