CHILE EXPLORATION UPDATE
26th FEBRUARY 2018
Gold exploration prospects, Chile
Vidalita
The drilling completed to date is summarised in table 1 and the drill collars are shown in figure 1.
The first hole was abandoned due to the time taken to drill to this depth caused by equipment failure
which caused the hole condition to deteriorate. The other completed holes were finished in rock
types that the contractor considered too hard for air core (using the vernacular – “refusal”).
ID
6500-1
8500-1
8500-2
8300-1
5900-3
5900-4
Start Date
9/01/2018
2/02/2018
5/02/2018
7/02/2018
13/02/2018
16/02/2018
End Date
21/01/2018
4/02/2018
6/02/2018
9/02/2018
15/02/2018
East
492963
493149
492986
492949
492397
492700
North
6936511
6938509
6938506
6938301
6935899
6935897
RL
4873
4840
4814
4826
4905
4885
Azimuth
0
270
90
90
270
270
Dip
90
-60
-60
-60
-60
-60
Total Depth Comment
140
Abandonned
168
Refusal
176
Refusal
158
Refusal
148
Refusal
71
Incomplete
Table 1
Results will be reported when received from the laboratory and assessed.
The Company is making enquiries to engage a contractor for diamond drilling in March and April.
Results of the surface geochemistry are progressively being received and the results for gold and
silver are shown in figures 2 and 3. While additional targets have been identified, they tend to be
within the corridor delineated in the previous field season providing additional technical support for
the prospectivity of the zone.
Jotahues
The soil/talus sampling results are summarised in figure 4. Two new areas have been identified for
further work – CT4 in the northern part of the area and P4 in the southern part. These areas are defined
by a combination of arsenic, antimony, lead, copper, mercury and to lesser extent, gold.
Air Core Drilling
Further to the ASX Releases on 17th January and 25th January 2018 and despite assurances that
drilling operations would continue without further mechanical failures, Wallis Drilling has failed to
maintain continuous drilling operations. As at the date of this release, their equipment is idle due to
inadequate preparation for the contract and the likelihood of additional drilling is uncertain. Wallis
Drilling has advised that “further drilling is no longer practicable”. The Company has put Wallis
Drilling on notice that Wallis Drilling has breached its contractual obligations in numerous respects
and on numerous occasions. Emu is pressing Wallis Drilling to make good their equipment and
Page 1 of 7
EMU NL
CHILE EXPLORATION UPDATE
26th FEBRUARY 2018
operation in general. Emu continues to fully cooperate with Wallis Drilling and continues to urge
Wallis Drilling to undertake as much drilling as is possible in the remaining part of the field season.
Figure 1 – drill hole locations
Page 2 of 7
EMU NL
CHILE EXPLORATION UPDATE
26th FEBRUARY 2018
Figure 2 – Vidalita soil and rock gold geochemistry
Page 3 of 7
EMU NL
CHILE EXPLORATION UPDATE
26th FEBRUARY 2018
Figure 3 – Vidalita soil and rock silver geochemistry
Page 4 of 7
EMU NL
CHILE EXPLORATION UPDATE
26th FEBRUARY 2018
Figure 4 – Jotahues soil geochemistry
Page 5 of 7
EMU NL
CHILE EXPLORATION UPDATE
26th FEBRUARY 2018
About:EMU is an ASX listed Company seeking to deliver tangible outcomes for investors by:
•
focusing on testing substantive mineralised systems capable of forming commercially attractive
development opportunities using existing technologies;
•
seeking to reduce risk by selecting operating environments with established minerals law and
mining industries;
•
remaining alert to best practice exploration technologies, seeking to bring new insights to our
work;
•
drawing on our depth of relevant experience; and
•
remaining active, with meaningful programs of work.
About the gold projects, Maricunga Belt, Chile
The Vidalita and Jotahues gold projects are located in the Maricunga gold belt in the Atacama Region
in northern Chile hosting numerous world class gold and silver projects. Emu’s projects cover an area
of approximately 6,900 hectares secured by mineral exploration concessions and host alteration and
mineralisation that appear geologically similar to other high sulphidation gold deposits of the
Maricunga gold belt. The projects are accessed using a network of roads that link Copiapó with the
Refugio project (Kinross), Cerro Casale project (Barrick/Goldcorp) and the Caspiche project
(Goldcorp). Refugio is located 30 km to the northwest of Vidalita. Emu is unaware of the project
having been drilled other than for the 3 holes it drilled in 2017.
The Company holds an option (Option) to acquire a 100% interest in certain of the Vidalita and
Jotahues concession packages from two Chilean companies.
The concessions the subject of the Option comprise 2 packages: one package, (the Prospex SpA
concessions) covers six concessions at Vidalita, is subject to a 2% NSR on any production, and the
second package, (the BLC SpA concessions) comprised of three concessions at Jotahues and two
concessions at Vidalita (Vidalota A&B), is subject to a 1% NSR.
The royalties apply to any concession acquired by Emu within 5km of the outer boundary of any of
the interests listed in the Option agreement. Any concession interest within that area acquired by the
other parties to that agreement shall be offered to Emu on the same terms as the other party acquired
the same.
The Option will lapse if Emu fails to pay US$100,000 in November 2018. The Option may be
exercised in November 2019 on payment of US$2M following expenditure of US$1M, electing to
continue on or before November 2018 (by paying US$100,000 refer to above), the issue of 2.5M
Emu shares and then if Emu defines: (i) 0.5Moz of gold in measured resources, a further 5M ordinary
shares will be issued; and (ii) 1Moz of gold in measured resources, a further 5M ordinary shares will
be issued.
Emu continues to look for new mineral exploration, development and mining opportunities within
Australia and at various overseas jurisdictions.
Page 6 of 7
EMU NL
CHILE EXPLORATION UPDATE
26th FEBRUARY 2018
COMPETENT PERSON’S STATEMENT
Emu NL
ABN 50 127 291 927
ASX Code: EMU
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
73,910,387 (inc. 4m which Emu can buy
back for nil consideration)
Contributing Shares (listed)
37,220,667 paid to $0.03, $0.03 to pay, no
call before 31/12/2018
Options (unlisted)
4,750,000, exercise price $0.10, expiring
20/12/18
2,000,000 exercisable (subject to minimum
share price milestones being met in the
case of 1,500,000 of these options) at
$0.11, expiring 20/12/18
300,000, exercise price $0.25, expiring
20/12/18
1,360,004, exercise price $0.03 to acquire a
contributing share EMUCA expiring
30/4/18
Any details contained herein that pertain to exploration
results, mineral resources or mineral reserves are based
upon information compiled by Mr Greg Steemson,
Managing Director of Emu NL. Mr Steemson is a
Fellow of the Australian Institute of Geoscientists
(FAIG) and has sufficient experience in the activity
which he is undertaking to qualify as a Competent
Person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC
Code). Mr Steemson consents to the inclusion herein of
the matters based upon his information in the form and
context in which it appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertainties and other
factors, actual events and results may differ materially
from any forward looking and other statements herein
not purporting to be of historical fact. Any statements
concerning mining reserves, resources and exploration
results are forward looking in that they involve
estimates based on assumptions. Forward looking
statements are based on management’s beliefs, opinions
and estimates as of the respective dates they are made.
The Company does not assume any obligation to update
forward looking statements even where beliefs,
opinions and estimates change or should do so given
changed circumstances and developments.
Directors:
Peter Thomas
Non-executive Chairman
Greg Steemson
Managing Director
Gavin Rutherford
Non-Executive
Page 7 of 7
JORC Code, 2012 Edition – Table 1 report, EMU NL
Jotahues and Vidalita rock and soil sampling
Vialita air core drilling
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Soil samples – a +2mm -6mm
screened sample consisting of
~1kg is collected in the field or, if
not possible, the required
screening is done in the
laboratory. For the Jotahues talus
samples, the material is generally
coarser.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Rock samples – are either large
rock pieces or a collection of
small chips.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would be
relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce
a 30 g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant disclosure
of detailed information.
Air core samples – are samples
from each 1m of drill hole taken
by PVC spear. The sample is
usually around 1kg representing ~
15 to 20% of the mass of the 1m
interval. Pieces of core recovered
by the air core system are stored
in core trays for logging and
geological reference.
For sample submissions
EMU171105-159 (132 soil and 40
rock samples from Jotahues) and
EMU171129-160 (244 soil and 68
rock samples from Jotahues and
Vidalita) the soil and rock
samples were crushed to 2mm,
500g split, pulverized and 100g
shipped to Intertek, Perth, for
analysis.
All subsequent sample
submissions for soils, rocks and
aircore have been (and unless
stated will continue to be) crushed
to 2mm, 800g split, pulverised
and 150g shipped to Intertek,
Perth, for analysis.
1
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Air core drilling using 75mm
diameter bit.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Geological team makes a
qualitative estimate (as good,
moderate or poor) of sample
recovery for each 1 meter down
hole sample interval.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
Sub-sampling
techniques and
sample
preparation
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
Supervising geologist ensures that
representative chip and core
samples are collected during
drilling.
Sampling is considered to be
unbiased.
Alteraton and rock types are
logged and recorded from aircore
samples.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
Pieces of core recovered by the air
core system are stored in core
trays for logging and geological
reference.
The total length and percentage of the
relevant intersections logged.
Total hole length is logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
Representative core samples (if
any) stored for future reference.
If non-core, whether riffled, tube sampled,
Air core samples (fines) from
rotary split, etc and whether sampled wet or each 1m of drill hole taken by by
dry.
PVC spear. The sample is usually
around 1kg.
For all sample types, the nature, quality
and appropriateness of the sample
The 1m samples are prepared for
preparation technique.
analysis by standard laboratory
procedures.
Quality control procedures adopted for all
sub-sampling stages to maximise
2
representivity of samples.
Sub-sampling is done using
splitters.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
The samples collected are
representative of the in situ
material.
Whether sample sizes are appropriate to the Sample sizes are appropriate to
grain size of the material being sampled.
the grain size of the material
being sampled.
Quality of
The nature, quality and appropriateness of A 25g split from each 1m air core
assay data and the assaying and laboratory procedures
pulp is taken from 4 consecutive
laboratory tests used and whether the technique is
metre samples, combined, reconsidered partial or total.
pulverised to homogenise and a
25g split is taken for analysis.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
All samples are digested using
parameters used in determining the analysis 25g aqua regia and analysed using
including instrument make and model,
ICP-MS at Intertek’s laboratory in
reading times, calibrations factors applied
Perth.
and their derivation, etc.
Soil samples - 9 elements are
Nature of quality control procedures
reported including gold (0.1ppb
adopted (eg standards, blanks, duplicates,
DL).
external laboratory checks) and whether
Rock samples – 52 elements are
acceptable levels of accuracy (ie lack of
reported including gold (10ppb
bias) and precision have been established.
DL).
Air core samples - 9 elements are
reported including gold (10ppb
DL).
The aqua regia digest in this
instance is considered appropriate
given the stage of the program
and the altered nature of the rocks.
10% of air core samples will be
sent for check analysis to another
laboratory.
Verification of
sampling and
assaying
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Laboratory standards, blanks and
checks are also reported.
No drilling assay results at this
time.
No twinned holes.
3
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to
All samples are located using
locate drill holes (collar and down-hole
hand held GPS accurate to < 5m.
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing
and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been
applied.
Orientation of
data in relation
All geochemical and geological
data is loaded into databases
managed by independent third
party entities for verification,
storage and plotting. Assay data
are not adjusted.
Whether the orientation of sampling
achieves unbiased sampling of possible
WGS UTM zone 19 south grid
system
Topographic control is deemed
adequate at this stage of the
exploration program.
The soil samples are generally
collected on a 50 X 400 or 50 X
200 grid. The Jotahues samples
were collected on traverses
upslope from the valley floor on
100m centres and composed of
composites from samples 33m
either side of the sample location
3 sub-samples).
The aircore drillholes are
irregularly spaced (but generally
>100m) as they are testing
geological, geophysical or
geochemical targets.
No mineral resources are being
reported.
The Jotahues soil samples were
composited in the field.
The aircore samples are
composited into 4m composites in
the laboratory.
The controls on mineralisation are
unknown at this time.
4
to geological
structure
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
The controls on mineralisation are
orientation and the orientation of key
unknown at this time.
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Sample security The measures taken to ensure sample
security.
Management was present during
the drilling.
Audits or
reviews
None undertaken.
The results of any audits or reviews of
sampling techniques and data.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
Emu has an option agreement
dated 14 November 2016 with
two Chilean companies, Prospex
SpA and BLC SpA, to acquire 8
concessions at Vidalita and 3
concessions at Jotahues. This
option maybe exercised any time
up until November 2019 by
granting Prospex and BLC a 1%
NSR on production and allotting
them up to 15 million Emu
ordinary shares subject to certain
vesting conditions (see ASX
release 15th November 2016).
Prospex SpA in turn has an
option to acquire 6 of the 8
Vidalita concessions from local
Chilean parties. Under the terms
of that agreement, Prospex has
the right to exercise that option
by November 2019 by paying
US$2 million and granting the
Chilean parties a 1% NSR over
those 6 concessions. Under the
Emu option agreement, Emu has
assumed the rights and
obligations of Prospex in relation
to those 6 concessions. The
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
5
option agreements are subject to a
5km AOI from the boundaries of
the 11 concessions. Since
entering into the option
agreement with Prospex and
BLC, additional concessions have
been applied for and were
reported in subsequent ASX
releases.
Exploration
done by other
parties
Acknowledgment and appraisal of
exploration by other parties.
Prior to the March 2017 drilling
program, no drilling is known on
these concessions. Previous work
was limited to rock sampling.
Geology
Deposit type, geological setting and style
of mineralisation.
The project is a green fields
exploration project and while the
source of the surface evidence of
mineralization can only be
speculation at this stage, it is
likely to be similar to known high
sulphidation epithermal style ore
deposits in the same geological
setting.
Drill hole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
Table included in the text
easting and northing of the drill hole
collar
elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
dip and azimuth of the holes, down hole
length and interception depths hole length.
If the exclusion of this information is
justified on the basis that the information is
not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
Data
aggregation
In reporting Exploration Results,
weighting averaging techniques, maximum
and/or minimum grade truncations (eg
No drill assays at this time.
6
methods
cutting of high grades) and cut-off grades
are usually Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
Project is at an early stage of
exploration and any conclusions
at this stage would be
speculation.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg ‘down
hole length, true width not known’).
Diagrams
Appropriate maps and sections (with
Not yet applicable – assays yet to
scales) and tabulations of intercepts should be received.
be included for any significant discovery
being reported. These should include, but
not be limited to a plan view of drill hole
collar locations and appropriate sectional
views.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Not yet applicable – assays yet to
be received.
Other
substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
None undertaken.
7
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
Further work
The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
Drilling is continuing. The
planned program was released to
ASX on 21 August 2017.
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
8
Share your feedback
Discover