First Speedway Drill Hole Pre-Collar Completed
Released
Released
Announcement PDF
EMU NL ABN 50 127 291 927
SPEEDWAY GOLD PROJECT, USA
SPDRCD1 PRE-COLLAR COMPLETED
SPDRCD1 PRE-COLLAR COMPLETED
The pre-collar for first drill hole at Speedway SPDRCD1 was stopped on Friday 12th
February at a depth of 550 feet due to slow penetration in a pyritic alteration zone within
limestones. The hole has been cased and is being continued with HQ core drilling (2.5 inch
core).
While the pre-collar is well above (~500 feet) the target zone, the hole has intersected an
interesting sequence of rocks. Once below the surface alluvium and basalt, the hole
intersected limestones with wide intervals of partial/complete silica (quartz) replacement with
minor epidote and pyrite, currently interpreted to be silica alteration of the limestones.
Intervals (10 to 15 feet) similar to the pyritic alteration zone intersected at the end of the precollar were also intersected higher in the hole.
The pre-collar was sampled on 5 foot intervals. These samples have been composited into 20
foot intervals and have been submitted for analysis.
From the base of the pre-collar the hole has intersected several more zones of multiple event
carbonate, quartz, sulphide and barite veining within the limestones showing chlorite and
biotite alteration. The zones of sulphide veins are typically oxidised and occupy vuggy
fractures.
The hole as at midday Utah time Sunday 14th February is at 627 feet.
15TH FEBRUARY 2016
For more information on the company visit www.emunl.com.au
ABOUT SPEEDWAY
The Speedway Project was generated by Don Merrick and John Zimmerman of Genesis Gold
Corporation, a private
UtahHills
company
specializing inLocation
gold exploration in the Western United
Cortez
- Speedway
States.
Utah
Nevada
1
EMU NL ABN 50 127 291 927
SPEEDWAY GOLD PROJECT, USA
SPDRCD1 PRE-COLLAR COMPLETED
Emu NL
ABN 50 127 291 927
ASX Code: EMU
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Issued Capital:
Quoted:
Shares
40,105,107 fully paid shares
Contributing Shares
35,324,341; paid to $0.03;
$0.03 to pay, no call before
31/12/2017
Unlisted Options:
15,186,606 options, exercise
price $0.10, date 30/3/17
Directors:
Peter Thomas
Chairman
Greg Steemson
Managing Director
Gavin Rutherford NonExecutive Director
COMPETENT PERSON’S STATEMENT
The details contained in this report that pertain to exploration
results, mineral resources and mineral reserves are based upon
information compiled by Mr. Greg Steemson, Managing
Director of Emu NL. Mr. Steemson is a Fellow of the
Australasian Institute of Mining and Metallurgy (FAusIMM)
and has sufficient experience in the activity which he is
undertaking to qualify as a Competent Person as defined in
the 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”
(JORC Code). Mr. Steemson consents to the inclusion in the
report of the matters based upon his information in the form
and context in which it appears.
FORWARD LOOKING STATEMENT
This report contains forward looking statements concerning
the projects owned by Emu NL. Statements concerning
mining reserves and resources may also be deemed to be
forward looking statements in that they involve estimates
based on specific assumptions. Forward-looking statements
are not statements of historical fact and actual events and
results may differ materially from those described in the
forward looking statements as a result of a variety of risks,
uncertainties and other factors. Forward looking statements
are based on management’s beliefs, opinions and estimates as
of the dates the forward looking statements are made and no
obligation is assumed to update forward looking statements if
these beliefs, opinions and estimates should change or to
reflect other future developments.
2
Share your feedback
Discover