REE Discovery Viper Project Jerramungup WA
Released
Released
Announcement PDF
REE Discovery Viper Project
Jerramungup WA
15 May 2023
EMU NL (ASX: EMU) (“EMU” or “the Company”) is pleased to announce an exciting REE
discovery and in doing so, a new REE region. Long awaited 1, multi element assay results
from its maiden drilling campaign at the 100% owned Viper Project, near Jerramungup, in
Western Australia, have returned significant, anomalous REE (Rare Earth Element) values.
HIGHLIGHTS
Assay results from EMU’s maiden RC drilling program at its Viper Project have confirmed
the discovery of an entirely new REE region near Jerramungup WA.
Zones of REE mineralisation, hosted in basement Gneiss/Granite rocks and adjacent
weathered clays, were encountered from shallow depths in RC drilling varying from 20m
to 52m in thickness.
Significant drill assays from 4m composite drill samples include:
Drillhole 22VRC001: 40m @ 438.70 ppm TREO from 28m
Drillhole 22VRC002: 4m @ 566.5 ppm TREO from 12m
and 20m @ 432.7 ppm TREO from 84m
Drillhole 22VRC003: 20m @ 654.23 ppm TREO from 0m
including 4m @ 1,137.68 ppm TREO from 16m
Drillhole 22VRC004: 32m @ 459.87 ppm TREO from 0m
Drillhole 22VRC005: 52m @ 541.95 ppm TREO from 4m
including 28m @ 648.12 ppm TREO from 4m
All drill holes ended in significantly anomalous (composite) REE up to 380.9 ppm TREO2
with an overall sample average MREO3 of 29.4% and HREO4 of 15.6%.
Drilling confirms EMU’s conceptual mineralisation model highlighting the project’s clay
hosted REE enrichment overlaying the adjacent Granite/Gneiss terrain.
1
ASX Release 23 November 2023 “Maiden Drilling Programme Commences at EMU’s Ni-Cu-PGE, Gold
Viper Project, Jerramungup WA”
2
TREO Total Rare Earth Oxides
3
Total Magnetic Rare Earth Oxides
4
Total Heavy Rare Earth Oxides
ABN 50 127 291 927 | 10 Walker Avenue, West Perth, WA, 6005 | PO Box 1112, West
Perth, WA, 6872 E: info@emunl.com.au | www.emunl.com.au | ASX Code: EMU
Application lodged for a further 120 square km extension immediately to the south of
existing tenements covering an identical geological setting.
Follow-up extensional drilling is being planned over the main portion of the REE
mineralisation zones with the aim of increasing the overall strike, width, and depth of
the mineralisation.
The project is located in the south-eastern wheatbelt with sealed road access and is
adjacent to the town of Jerramungup in the WA wheatbelt.
The discovery represents as a potentially large scale REE project with good access to
infrastructure and workforce.
EMU’s RC (Reverse Circulation) drilling programme, completed in November 2022, was
undertaken to test anomalous geochemical nickel and copper occurrences, geophysical
electromagnetic conductors generated from its comprehensive, systematic exploration
programmes 5 and to test possible extensions of the historic Netty Copper Mine copper
mineralistion. Fire assays were completed for gold and PGEs. That analysis was followed
by the application of much more time consuming 62 Multi Element assay method for base
metals and REE using the pulp samples that were fire assayed.
Assay results from the drilling have revealed significant REE anomalism. Surface rock
samples collected from EMU’s exploration campaign reconnaissance activities have also
recorded widespread REE anomalism.
Prompted by EMU’s conceptual modelling, but without the benefit of the multi element
assays, 38 rock samples were collected from outcropping granites within the area
adjoining the existing Viper Project tenements to the south and these samples have
reported strong REE anomalism. (See Figure 2.)
Accordingly, EMU applied for an additional 120 square kms of exploration license ground,
bringing the total project exploration area to 242 square kms.
Peter Thomas, EMU Chairman commented,
“The assay results taken from rock chip samples and 5 RC drill holes at Viper have led EMU to
declare a REE project discovery. The results are highly anomalous and encouragingly exhibit
thick mineralised zones throughout the length of drill holes. We are extremely encouraged
that the samples taken from outcropping rocks over the wider project area have all reported
anomalous REE mineralis on.
5
See ASX Release 22 November 2022 “Maiden Drilling Programme Commences at EMU’s Ni-Cu-PGE, Gold
Viper Project, Jerramungup WA”
Page | 2
The discovery prompted EMU to immediately apply for further explora on licences covering
similar geology adjoining the Viper Project”.
Viper Project Drilling
The high value REE TREO assay results were recorded from 4m composite drill samples which
are likely to be significantly upgraded once the 1m split interval assay results are received.
The anomalous REE results have been recorded both in the saprolite, “clay” layers and within
the “basement” hard rock sec ons of the drill column. REE mineralisa on was encountered
through broad zones in all drill holes.
REE TREO averaged 365 ppm across the en re 5 drill holes, with all drill holes ending in
anomalous mineralisa on indica ng mineralisa on of the underlying basement rocks.
Conceptual Model – Clay Hosted REE at Viper Project
EMU expects to identify REE supergene concentrations in clay zone “traps” in adjacent
saprolite weathering profiles overlying and adjacent to the fertile granite suites within the
Viper Project.
Figure 1. A conceptual cross sec on of the granite suite at Viper showing outcrops loca ons
and prospec ve enriched clay layers and clay traps.
Follow Up Work Programme
EMU has ini ated the planning of a follow up Aircore drilling programme to target the deeper
clay zones. To assist in the prepara on of the drill collar loca ons, EMU has engaged Resource
Poten als, Geophysics Consultancy, to review open-source data such as aeromagne c imaging to
ascertain deeper weathered zone targets adjacent and overlaying the granite suites.
Page | 3
Confirma on of depth of clays from this review will be tested in the field based by a passive
seismic survey which will confirm clay depths over basement rocks and provide vectors for aircore
drilling. Following the survey, which provides immediate in field results, EMU will commence a
stage 1 Aircore drilling programme.
Figure 2. Map with underlying areomagne c layer showing Viper Project with new
tenement area under applica on in the south of granted tenements.
Page | 4
For further informa on, please contact:
Doug Grewar
Chief Execu ve Officer
Emu NL
Investors can sign into our interac ve investor hub and join in on the conversa on with Emu
NL.
h ps://investorhub.emunl.com.au/auth/signup
info@emunl.com.au
Page | 5
Table 1. Significant Rock Sample Results > 450 TREO (PPM & %)
Site_ID
Medium
Easting Northing TREO MREO % HREO % CREO % CeO2
Dy2O3 Er2O3
Eu2O3 Gd2O3 Ho2O3 La2O3 Lu2O3 Nd2O3 Pr6O11 Sm2O3 Tb4O7 Tm2O3 Y2O3
Yb2O3
ESS01857
Granitoid
685503
6238585
567
21.5
3.2
18.0
251.83
2.16
0.77
2.42
5.04
0.31
164.19
0.09
88.30
30.90
10.90
0.48
0.09
8.81
0.64
ESS01871
Granitoid
683920
6234125
531
20.6
5.4
19.2
244.80
3.27
1.40
2.23
5.94
0.60
138.39
0.16
80.36
24.93
11.05
0.69
0.21
15.37
1.18
ESS01867
Granitoid
684297
6235293
513
25.9
14.3
29.4
201.46
9.31
3.49
3.15
14.29
1.53
94.53
0.34
96.69
24.69
18.79
1.85
0.47
39.49
2.49
ESS01880
Granitoid
677794
6232566
506
21.9
3.6
18.6
227.23
1.97
0.70
1.03
5.23
0.30
140.74
0.08
81.41
26.57
10.17
0.56
0.08
8.95
0.52
ESS01873
Granitoid
686585
6231669
504
20.8
4.8
18.8
234.26
2.96
1.05
2.01
6.13
0.47
131.35
0.11
77.33
23.87
11.18
0.63
0.14
11.81
0.82
ESS01764
Granitoid
685186
6248102
479
23.9
8.5
24.3
206.15
4.61
1.81
3.65
8.92
0.73
106.14
0.20
85.26
23.52
13.80
1.02
0.25
21.72
1.46
Page | 6
Table 2. Significant RC Sample Results > 450 TREO (PPM & %)
Sample_ID
ERC09166
ERC09236
ERC09242
ERC09241
ERC09162
ERC09237
ERC09235
ERC09208
ERC09209
ERC09132
ERC09165
ERC09152
ERC09207
ERC09239
ERC09210
ERC09240
ERC09232
ERC09122
ERC09163
ERC09116
ERC09119
ERC09117
ERC09164
ERC09153
ERC09265
Interval
(m)
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
TREO
MREO % HREO %
CREO %
CeO2
Dy2O3
Er2O3
Eu2O3
Gd2O3
Ho2O3
La2O3
Lu2O3
Nd2O3
Pr6O11
Sm2O3
Tb4O7
Tm2O3
Y2O3
Yb2O3
1137.68
863.2
715.36
679
639
637
630
589
568
567
558
557
529
523
490
489
487
486
485
461
460
454
452
451
450
22.52
24.92
24.96
24.35
24.22
24.19
24.6
21.81
24.86
24.19
24.54
24.87
24.39
23.48
23.87
24.73
23.08
23.66
24.7
23.85
23.76
24.1
23.41
25.13
22.93
24.78
28.57
27.62
25.97
24.54
26.71
25.91
28.42
30.38
47.25
29.07
26.48
26.48
27.1
31.38
27.24
23.76
24.46
26.16
25.34
25.04
25.68
25.87
26.5
21.97
510.69
338.51
292.83
289.31
278.77
257.69
263.54
235.43
216.69
142.90
210.83
231.92
201.46
214.35
185.07
196.78
209.66
206.15
187.41
194.44
194.44
188.58
185.07
187.41
200.29
11.11
13.08
9.06
7.70
6.28
7.80
7.92
8.42
8.93
21.92
7.15
6.47
5.92
6.39
8.33
6.34
4.73
4.82
5.31
5.08
4.79
4.88
4.77
5.11
3.45
5.45
5.91
4.23
3.52
2.56
3.64
3.33
4.39
3.80
11.89
3.17
2.63
2.69
3.21
4.65
2.94
2.00
2.02
2.37
2.02
2.02
2.23
2.39
2.18
1.35
5.01
6.55
5.19
4.56
4.59
4.50
4.43
4.27
4.94
7.57
4.30
4.09
3.87
3.69
3.72
3.84
2.92
3.66
3.84
3.86
3.68
3.80
3.31
3.82
2.45
20.52
20.17
14.98
13.37
12.10
12.68
13.02
12.56
14.75
25.01
12.91
12.33
10.67
10.71
12.68
10.64
8.39
9.66
9.87
9.49
9.20
9.64
8.88
9.94
6.97
2.05
2.42
1.70
1.41
1.08
1.44
1.39
1.55
1.52
4.23
1.27
1.09
1.00
1.23
1.62
1.13
0.86
0.82
0.93
0.85
0.78
0.84
0.87
0.88
0.57
226.35
172.40
141.91
138.39
133.70
138.39
131.35
120.80
108.95
60.75
119.63
113.18
127.84
108.60
89.02
101.10
110.71
108.37
116.11
98.87
100.27
98.05
100.74
92.18
107.43
0.55
0.71
0.49
0.41
0.30
0.38
0.39
0.60
0.40
1.18
0.33
0.28
0.35
0.40
0.59
0.33
0.24
0.20
0.28
0.23
0.24
0.23
0.28
0.22
0.15
187.79
156.30
131.80
122.47
115.24
113.61
113.37
93.31
103.34
90.86
101.24
102.88
95.53
90.16
84.33
88.88
82.58
85.73
88.53
81.76
81.65
81.65
78.15
85.03
76.98
54.77
43.18
35.93
33.70
31.72
31.25
32.07
25.04
27.03
20.48
26.92
27.62
26.21
25.04
22.59
24.34
23.99
23.29
24.69
22.00
21.77
21.77
21.77
22.12
22.00
30.73
27.48
21.57
19.37
19.48
18.32
18.55
16.47
18.79
22.50
17.63
17.86
15.77
14.73
15.31
15.42
13.22
14.73
14.15
14.61
14.26
14.38
12.64
14.96
11.48
2.57
2.51
1.78
1.59
1.48
1.52
1.54
1.59
1.84
3.80
1.55
1.47
1.25
1.27
1.62
1.27
1.05
1.08
1.24
1.14
1.07
1.13
1.09
1.19
0.84
0.72
0.79
0.58
0.51
0.34
0.47
0.42
0.64
0.51
1.43
0.45
0.34
0.39
0.45
0.67
0.38
0.27
0.23
0.33
0.25
0.24
0.26
0.32
0.29
0.18
75.43
68.19
49.78
40.13
29.21
42.80
35.94
59.69
53.46
143.50
47.88
32.51
33.40
40.26
55.62
32.76
24.38
23.49
27.94
25.02
24.00
25.14
29.59
24.51
15.24
3.94
5.00
3.54
2.98
2.00
2.86
2.52
3.78
2.86
8.48
2.51
1.98
2.27
2.71
3.80
2.40
1.70
1.43
1.98
1.55
1.57
1.54
2.00
1.62
1.09
10.75
13.76
12.04
10.54
8.66
11.54
10.55
15.84
15.51
39.09
13.84
10.62
10.96
12.73
18.3
11.91
8.96
9.01
10.36
9.89
9.55
10.1
11.11
10.17
6.63
Page | 7
Table 3. Other Rock Sample Results <450 and >250 TREO (PPM & %)
Site_ID
ESS01863
ESS01865
ESS01712
ESS01862
ESS01753
ESS01861
ESS01766
ESS01849
ESS01868
ESS01879
ESS01881
ESS01767
ESS01845
ESS01756
ESS01751
ESS01844
ESS01752
ESS01874
ESS01872
ESS01761
ESS01843
ESS01851
ESS01846
ESS01765
ESS01754
ESS01859
ESS01841
Medium
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Granitoid
Easting Northing TREO MREO % HREO % CREO % CeO2 Dy2O3 Er2O3
441
686076 6237548
24.83 14.25 28.57 171.01 7.76
3.03
434
687662 6235338
20.67
4.97
19
216.69 2.42
1.01
425
681408 6248953
25.08 10.07
26.4 176.87 4.60
2.08
423
687255 6237340
19.83
3.1
16.94 208.49 1.46
0.53
417
682672 6243620
19.76
3.5
17.2 200.29 1.58
0.64
417
685939 6240105
19.87
3.21
17.09 199.12 1.42
0.55
414
684803 6244686
24.65
9.15
25.29 176.87 4.37
1.77
413
681293 6240931
25.45 39.01 46.42 87.50 18.25 10.61
386
683484 6236333
25.49
10.5
26.99 158.13 4.69
1.74
371
676908 6231329
22.12
8.85
22.84 161.64 3.53
1.62
369
679468 6232733
22.34
4.55
19.71 154.61 2.27
0.75
368
691339 6247065
20.22
7.64
20.29 167.50 3.26
1.48
362
682992 6243078
24.46 12.45 27.28 139.38 5.22
2.49
354
680651 6247331
23.27 10.11 24.86 148.76 3.97
1.90
331
680684 6244306
24.28
9.49
25.3 139.38 3.62
1.52
326
681443 6242599
23.96 10.35 25.34 125.33 4.03
1.83
322
681750 6245145
22.74
8.64
23.32 139.38 3.25
1.43
313
682384 6234135
23.84
8.79
24.3 134.70 3.16
1.28
308
686500 6230547
20.67
5.43
19.4 141.73 1.99
0.71
307
680495 6243941
24.26
9.96
25.69 128.84 3.45
1.54
305
681146 6243453
24.24
9.92
25.24 119.47 3.51
1.58
304
678537 6238717
23.35 39.94 45.38 79.77 13.89
7.81
291
683644 6242377
21.06
8.39
21.31 124.16 2.72
1.23
290
687645 6248384
24.01
9.43
25.11 124.16 3.03
1.35
284
682678 6243617
20.26
5.26
19.18 130.01 1.73
0.81
283
686397 6239959
24.21
11.3
26.07 110.92 3.91
1.70
680043 6243422
24.66 11.49 26.93 99.91
3.53
1.64
271
Eu2O3 Gd2O3 Ho2O3 La2O3 Lu2O3 Nd2O3 Pr6O11 Sm2O3 Tb4O7 Tm2O3 Y2O3
2.65
11.64
1.25
87.84
0.28
79.32 20.71 16.23
1.59
0.41
34.54
1.79
4.94
0.38
98.05
0.15
66.60 20.13
9.15
0.54
0.14
11.09
3.39
8.64
0.78
87.61
0.23
79.55 21.42 13.34
1.02
0.26
23.62
1.71
3.63
0.23 109.89 0.07
61.82 20.25
7.71
0.37
0.08
6.30
1.34
3.61
0.26 113.29 0.08
61.00 19.43
6.97
0.38
0.09
7.42
1.41
3.53
0.24 114.47 0.08
61.35 19.66
7.18
0.35
0.07
6.68
3.22
8.38
0.69
86.55
0.19
76.28 20.48 12.99
0.98
0.24
19.94
5.51
17.87
3.36
57.94
1.13
67.18 17.09 16.93
2.69
1.27
98.29
3.36
8.93
0.74
77.87
0.17
73.37 19.31 13.34
1.00
0.23
21.72
1.89
5.97
0.63
87.73
0.14
59.60 18.02
8.84
0.81
0.19
18.79
1.89
4.68
0.32 107.90 0.07
60.54 19.08
8.35
0.56
0.09
7.51
1.24
5.09
0.56
92.42
0.14
53.77 16.62
7.95
0.68
0.18
15.62
3.18
8.36
0.86
79.87
0.20
64.27 18.02 12.06
1.00
0.27
25.02
2.83
6.81
0.71
78.93
0.23
60.89 16.74 10.38
0.85
0.25
19.56
2.64
6.62
0.61
71.42
0.15
59.95 16.03 10.26
0.79
0.21
16.76
2.55
6.21
0.62
80.81
0.18
56.69 16.74 10.40
0.74
0.22
18.67
2.25
5.61
0.54
74.82
0.16
54.12 15.21
8.62
0.68
0.19
14.86
2.29
5.76
0.55
68.73
0.15
55.29 15.45
8.93
0.70
0.18
14.60
1.97
3.85
0.33
79.75
0.08
46.66 14.63
6.57
0.41
0.10
8.74
2.51
5.95
0.58
66.03
0.17
55.52 14.86
9.08
0.74
0.21
16.76
2.55
5.83
0.57
73.53
0.16
53.65 16.03
9.29
0.69
0.19
16.51
4.23
13.60
2.54
30.84
0.86
44.21 10.72 12.64
2.09
0.97
73.40
1.40
4.73
0.45
75.53
0.15
43.74 14.28
7.36
0.53
0.14
13.59
2.36
5.42
0.52
61.81
0.15
51.79 14.16
8.42
0.67
0.18
14.98
2.29
3.02
0.29
76.11
0.13
42.46 12.99
5.25
0.37
0.11
7.63
2.59
6.09
0.58
64.15
0.17
49.11 14.75
9.32
0.71
0.21
17.40
2.55
5.73
0.56
65.56
0.15
48.64 13.93
8.98
0.64
0.19
17.52
Yb2O3
2.28
0.90
1.56
0.47
0.52
0.48
1.34
7.82
1.28
1.09
0.52
1.06
1.63
1.55
1.16
1.26
1.12
1.12
0.51
1.21
1.20
6.13
0.89
1.07
0.84
1.20
1.14
Page | 8
Table 4. Viper RC Drilling Collar File
Hole ID
22VRC001
22VRC002
22VRC003
22VRC004
22VRC005
Hole Type
RC
RC
RC
RC
RC
Easting
682132
682124
681831
681825
681394
Northing
6249785
6249807
6249629
6249682
6249485
EOH Depth
78
120
150
120
119
Dip
-60
-60
-60
-60
-60
Az
160
160
175
175
170
NAT RL
268
268
254
256
257
Prospect
Viper
Viper
Viper
Viper
Viper
Page | 9
Emu NL
ABN 50 127 291 927
ASX Codes: EMU and EMUCA
10 Walker Ave
West Perth, WA 6005
T +61 8 9226 4266
E info@emunl.com.au
PO Box 1112
West Perth, WA 6872
Fully paid shares (listed)
1,450,021,079 (including 18.6m the
subject of the ATM which EMU can buy
back for nil consideration)
Contributing Shares (listed)
40,485,069 paid to $0.03, $0.03 to pay,
no call before 31 December 2023
Contributing Shares (Unlisted)
35,000,000 paid to $0.0001, $0.04 to
pay, no call before 31 December 2025
Options (unlisted)
172,453,621 options to acquire fully paid
shares, exercisable at $0.01 each, on or
before 7 October 2024
Performance Rights (Unlisted)
48,571,429 performance rights in
relation to acquisition of Gnows Nest
project
Directors:
Peter Thomas
Non-Executive Chairman
Terry Streeter
Non-Executive Director
Gavin Rutherford
Non-Executive Director
Tim Staermose
Non-Executive Director
Investor enquiries:
Doug Grewar CEO
M +61 419833604
E info@emunl.com.au
COMPETENT PERSON’S STATEMENT
The informa on in this report that relates to
explora on results is based on, and fairly represents
informa on and suppor ng documenta on prepared
by Kur s Dunstone, a Competent Person who is a
Member of the Australian Ins tute of Geoscien sts.
Mr Dunstone is an employee of EMU NL and has
sufficient experience in the ac vity which he is
undertaking to qualify as a Competent Person as
defined in the 2012 edi on of the “Australasian Code
for Repor ng of Explora on Results, Mineral
Resources and Ore Reserves”. Mr Dunstone consents
to the inclusion herein of the ma ers based upon his
informa on in the form and context in which it
appears.
FORWARD LOOKING STATEMENTS
As a result of a variety of risks, uncertain es and
other factors, actual events and results may differ
materially from any forward looking and other
statements herein not purpor ng to be of historical
fact. Any statements concerning mining reserves,
resources and explora on results are forward looking
in that they involve es mates based on assump ons.
Forward looking statements are based on
management’s beliefs, opinions and es mates as of
the respec ve dates they are made. The Company
does not assume any obliga on to update forward
looking statements even where beliefs, opinions and
es mates change or should do so given changed
circumstances and developments.
NEW INFORMATION OR DATA
EMU confirms that it is not aware of any new
informa on or data that materially affects the
informa on included in the original market
announcements and, in the case of es mates of
Mineral Resources, which all material assump ons
and technical parameters underpinning the es mates
in the relevant market announcement con nue to
apply and have not materially changed. The Company
confirms that the form and context in which the
Competent Person’s findings are presented have not
materially changed from the original market
announcement.
Page | 10
JORC Code 2012 Edi on Table 1:
Sec on 1- Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
A total of 18, 1-2kg surface rock samples
were collected for assay.
Sampling was carried out under Company
protocols and QAQC procedures as per
current industry practice. See further
details below.
Samples were dispatched to LabWest in
Perth. Sample preparation by the
laboratory included sample sorting, oven
drying, mechanical pulverisation to 95%
passing 75 microns. Analytical method
MMA-04.
Reverse Circulation (RC) was completed
over 5 holes, totaling 587m. Sample type
was drilling cuttings from RC drilling,
sampled every 1 metre. Every sample
weighted between 3 and 5 kgs.
Industry standard practices was used to
ensure sample representation. Nagrom
& LabWest Laboratories in Perth applied
QA-QC for sample preparation and
appropriate instrument calibration.
Individual samples were collected from
the riffle splitter below the cyclone into
calico bags for analysis.
Duplicates, blanks, and standards will be
submitted to ensure results are
repeatable and accurate. Laboratory
comparison checks will also be
completed. With no statistically
significant lab errors or biasing shown at
this stage.
Intervals were geologically logged by
geologist currently on the drilling
programme.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g
charge for fire assay’). In other cases,
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
RC drilling was completed by standard RC
Drilling techniques. KTE Pty Ltd using
KWL700/T685 drill rig - 143mm diameter
face sampling hammer bit was used.
Drill samples are homogenised by riffle
splitting prior to sampling and a 3-5g split
Page | 11
Criteria
JORC Code explanation
Commentary
sample is submitted for assay only. The
sampling intervals submitted for analysis
consisted of 4m composites.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to
a level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
All metre intervals were logged, and
sample recoveries were estimated by
geologist on site based on bag volume
estimation and recorded as a percentage.
Sample recoveries were classified as
satisfactory, and the volume of sample
was considered to represent a good
composite sample overall.
All samples were noted if dry, moist or
wet in the geological logging sheets
Rock Chip geological logging was done on
a visual basis, including; colour, grain size,
lithology type, weathering, and
mineralogy.
All RC drilling is qualitatively and
quantitatively logged for a combination of
geological and geotechnical attributes in
their entirety including as appropriate
major & minor lithologies, alteration, vein
minerals, vein percentage, sulphide type
and percentage, colour, weathering,
hardness, grain size.
All RC holes were geologically logged from
the start to the end of hole. All fields’
descriptions are qualitative in nature
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to
the grain size of the material being
The samples were dried and pulverised to
95% passing -75 microns before analysis –
samples were classified as homogeneous.
QA/QC certified reference samples and
field duplicates were routinely inserted at
a rate of 1 in 20 with every batch
submitted for assay.
The sample size is appropriate for the
mineralization style, application and
analytical techniques used.
All RC holes were sampled and split every
1 metre using a cone splitter to produce a
sample between 3 and 5 kgs sub-sample
for submission to Nagrom for Au, Pt & Pd
with the rest submitted to LabWest for
multi-element analysis.
Approx. 7% of submitted samples are in
the form of standards, blanks, and
Page | 12
Criteria
JORC Code explanation
sampled.
Commentary
duplicates and will be submitted once the
drilling programme has been completed.
The sample sizes are appropriate to the
grain size of the material been sampled.
4m composites were submitted to be
analysed.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precision have been established.
The rock chip samples were analysed by
LabWest using microwave mixed-acid
method MMA-04, 62 element
determination including rare-earths using
a combination of ICP-MS and ICP-OES
finish.
Detection limits are appropriate for the
included results.
Geochemical Analysis of the RC samples
conducted by WestLabs for multi-element
analysis (40 elements suite) included
drying and pulverising to 95% passing
75um. Four acid ICP-AES (ME-ICP61) was
used to assay for Ag (ppm), Al (ppm), As
(ppm), Ba (ppm), Ca (%), Cd (ppm), Ce
(ppm), Co (ppm), Cr (ppm), Cs (ppm), Cu
(ppm), Dy (ppm), Er (ppm),Eu (ppm), Fe
(%), Ga (ppm), Gd (ppm), Ge (ppm), Hf
(ppm), Ho (ppm), In (ppm), K (ppm), La
(ppm), Li (ppm), Lu (ppm), Mg (%),
Mn(ppm), Mo (ppm), Na (%), Nd (ppm),,
Ni (ppm),, P (ppm), Pb (ppm),, Pr (ppm),
Rb (ppm), Re (ppm), S (ppm),, Sb (ppm),
Sc (ppm), Se (ppm), Sm (ppm), Sn (ppm),
Se (ppm), Ta (ppm), Th (ppm), Ti (ppm), TI
(ppm), Tm (ppm), U (ppm), V (ppm), W
(ppm), Y (ppm),, Yb (ppm), Zn (ppm) and
Zr (ppm),
Nagrom Laboratory in Perth used
FA50_OES method to analysis for Au
(ppm), Pt (ppm) and Pad (ppm)
Acceptable levels of accuracy for all data
referenced in this ASX announcement
have been achieved given the purpose of
the analysis.
Verification
of sampling
and
assaying
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
Assays are as reported from the
laboratory and stored in the company
database, managed by an independent
database consultant.
Field data was collected on site using both
field sample books and a company
Toughbook (laptop computer) and
entered into a set of standard logging
Page | 13
Criteria
JORC Code explanation
protocols.
Discuss any adjustment to assay data.
Commentary
templates.
Relevant individual rare-earth element
results were converted to stoichiometric
oxide using industry standard
stoichiometric conversion factors:
Element
PPM
Ce
Dy
Er
Eu
Gd
Ho
La
Lu
Nd
Pr
Sm
Tb
Tm
Y
Yb
Oxide
Form
CeO2
Dy2O3
Er2O3
Eu2O3
Gd2O3
Ho2O3
La2O3
Lu2O3
Nd2O3
Pr6O11
Sm2O3
Tb4O7
Tm2O3
Y2O3
Yb2O3
Conversion
Factor
1.2284
1.1477
1.1435
1.1579
1.1526
1.1455
1.1728
1.1371
1.1664
1.2082
1.1596
1.1762
1.1421
1.2699
1.1387
Rare-Earth Oxide results were calculated
using:
TREO (Total Rare Earth Oxide) = CeO2 +
Dy2O3 + Er2O3 + Eu2O3 + Gd2O3 +
Ho2O3 + La2O3 + Lu2O3 + Nd2O3 +
Pr6O11 + Sm2O3 + Tb4O7 + Tm2O3 +
Y2O3 + Yb2O3
Mag REO (Magnet Rare Earth Oxide) =
Dy2O3 + Pr6O11 + Nd2O3 + Tb4O7 +
Gd2O3 + Ho2O3 + Sm2O3
HREO (Heavy Rare Earth Oxide) = Dy2O3 +
Er2O3 + Eu2O3 + Gd2O3 + Ho2O3 +
Lu2O3 + Tb4O7 + Tm2O3 + Y2O3 + Yb2O3
CREO (Critical Rare Earth Oxide) = Dy2O3 +
Eu2O3 + Nd2O3 + Tb4O7 + Y2O3
Percent MREO (Magnetic) = MREO / TREO
Percent HREO (Heavy) = HREO / TREO
Percent CREO (Critical) = CREO / TREO
No Twinned Holes were used
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Rock samples and reconnaissance RC
Drillholes were located using a handheld
GPS system with an accuracy of +/- 5m
and stored in the company database.
Specification of the grid system used.
All coordinates are referenced to MGA
Zone 50, Datum GDA94.
Quality and adequacy of topographic
Topographic control was gained using
Page | 14
Criteria
JORC Code explanation
control.
Data
spacing
and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Commentary
government DTM data with handheld GPS
check.
Data spacing is listed in a Table within the
body of the report.
Rock samples were collected where rock
was exposed at surface.
Whether sample compositing has been
applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Samples were taken with consideration of
stratigraphy and alteration; samples do
not straddle geological or stratigraphic
boundaries.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The relationship between drilling
orientation and mineralisation orientation
is not considered to have introduce any
material sampling bias during the drilling
program.
Sample
security
The measures taken to ensure sample
security.
Share your feedback
Discover